Mcleod Electric

EV charger installer working in Austin.

  • No Texas electrical contractor license matched this business by the phone on its permits, or by its name in the same city

134 jobs on Austin permits, 2023 to 2026: 79 EV charger installations, 54 panel upgrades, 1 solar installation. 5th most EV charger permits of 93 contractors in Austin.

What the public records show

From the city's permits, one question at a time.

QuestionRecords showMark
Licensed?No Texas electrical contractor license matched this business by the phone on its permits, or by its name in the same cityLook them up on the state's license search.Ask them
Jobs on record134 jobs on Austin permits, 2023 to 2026: 79 EV charger installations, 54 panel upgrades, 1 solar installation5th most EV charger permits of 93 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.Of their 79 EV charger permits, 32 mention a panel upgrade.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a EV charger permit stays open about 6 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 5 days. How long EV charger jobs take.

Track record

37 jobs in the last 12 months, up from 21 the year before

Q2 2023: 2 jobsQ3 2023: 17 jobsQ4 2023: 25 jobsQ1 2024: 9 jobsQ2 2024: 6 jobsQ3 2024: 17 jobsQ4 2024: 7 jobsQ1 2025: 4 jobsQ2 2025: 4 jobsQ3 2025: 6 jobsQ4 2025: 8 jobsQ1 2026: 8 jobsQ2 2026: 12 jobsQ3 2026: 9 jobsBusiest: 25 jobsLatest: 9 jobs202420252026
Each bar is 3 months of permits. The tallest is 25 jobs, October to December 2023. Across Austin, all contractors together had 12% fewer EV charger jobs in the last 12 months than in the 12 months before.

Where they work most

  • 7872314 jobs
  • 7870412 jobs
  • 7873910 jobs
  • 787459 jobs
  • 787268 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Aug 26, 2026Panel upgradeEV charger installation: Repurpose the existing 40 circuit in the main panel hard wire the ribbon…78704not stated
Aug 26, 2026EV chargerEV charger installation: Repurpose the existing 40 circuit in the main panel hard wire the ribbon…78704not stated
Aug 17, 2026EV chargerEV charger installation78702not stated
Jul 31, 2026EV chargerEV charger installation: Install a new 60-amp circuit in the 200 MSP and hardwire the Emporia…78730not stated
Jul 18, 2026SolarPV charger installation: Proposed installation is installing a new 60-amp circuit in the 200-amp…78747not stated
Jul 16, 2026Panel upgradeEV Charger installation: Install a new 60-amp circuit in the 100 Subanel and route wiring left…78726not stated
Jul 16, 2026EV chargerEV Charger installation: Install a new 60-amp circuit in the 100 Subanel and route wiring left…78726not stated
Jul 7, 2026Panel upgradeNo details on the permit78702not stated
Jul 7, 2026EV chargerNo details on the permit78702not stated
Jun 12, 2026Panel upgradeInstall Rivian Wall Charger: Use pre-wired 50-amp 240V circuit from the 200A main panel78744not stated
Jun 5, 2026Panel upgradeInstall a new 60-amp circuit in the 200-amp main panel and wiring directly behind the panel to the…78739not stated
Jun 2, 2026EV chargerNo details on the permit78739not stated
Jun 2, 2026Panel upgradeEV Charger Install: Install a new 50 amp circuit in the 125 amp MSP and route wiring directly…78748not stated
Jun 2, 2026EV chargerEV Charger Install: Install a new 50 amp circuit in the 125 amp MSP and route wiring directly…78748not stated
Apr 17, 2026EV chargerEV charger install78724not stated
Apr 16, 2026Panel upgradeInstallation EV charger: Emporia Classic J1772. Hard wire Emporia Classic on the interior back…78704not stated
Apr 16, 2026EV chargerInstallation EV charger: Emporia Classic J1772. Hard wire Emporia Classic on the interior back…78704not stated
Apr 8, 2026Panel upgradeEV charger installation78750not stated
Apr 8, 2026EV chargerEV charger installation78750not stated
Apr 8, 2026Panel upgradeEV charger installation78747not stated
Apr 8, 2026EV chargerEV charger installation78747not stated
Mar 27, 2026Panel upgradeEV charger installation: The EV charging outlet will be installed in the garage using a surface…78746not stated
Mar 27, 2026EV chargerEV charger installation: The EV charging outlet will be installed in the garage using a surface…78746not stated
Mar 27, 2026Panel upgradeHardwire EVSE to 60A 2-pole breaker in 200A MBP. Route wiring back-to-back from panel through wall…78745not stated
Mar 27, 2026EV chargerHardwire EVSE to 60A 2-pole breaker in 200A MBP. Route wiring back-to-back from panel through wall…78745not stated
Mar 2, 2026Panel upgradeInstall 40 amp 200 40 Volt breaker in existing 80-amp interior subpanel using available spaces78744not stated
Mar 2, 2026Panel upgradeInstall a new 60-amp 240 Volt circuit in the 150amp main panel78724not stated
Feb 4, 2026Panel upgradeEV charger installation... Run EV circuit from exterior 200-amp main panel on rear right-side wall78753not stated
Feb 4, 2026EV chargerEV charger installation... Run EV circuit from exterior 200-amp main panel on rear right-side wall78753not stated
Dec 19, 2025Panel upgradeEV charger installation: install a 60amp 200 40 Volt circuit in the 150-amp garage sub panel78748not stated
Dec 19, 2025EV chargerEV charger installation: install a 60amp 200 40 Volt circuit in the 150-amp garage sub panel78748not stated
Oct 30, 2025Panel upgradeInstall a new 40A 240V EV circuit in the 60A sub panel in the spaces provided78727not stated
Oct 30, 2025EV chargerInstall a new 40A 240V EV circuit in the 60A sub panel in the spaces provided78727not stated
Oct 24, 2025Panel upgradeInstall a 60 amp 240V circuit in the 200-amp main panel using an available breaker slot78723not stated
Oct 14, 2025Panel upgradeInstall a 60-amp 240 Volt circuit and the 150-amp main panel using an available breaker slot78757not stated
Oct 1, 2025Panel upgradeNo details on the permit78751not stated
Oct 1, 2025EV chargerNo details on the permit78751not stated
Aug 11, 2025Panel upgradeInstall a 50 amp 200 40 Volt circuit and the 100-amp sub panel with available space... proposed…78723not stated
Jul 31, 2025Panel upgradeInstallation EV charging systrem: Install a 50A 240V circuit in the 200A main panel with available…78723not stated
Jul 31, 2025EV chargerInstallation EV charging systrem: Install a 50A 240V circuit in the 200A main panel with available…78723not stated

What to ask before you hire

About Mcleod Electric

  • Ask for their electrical contractor license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any EV charger installer

  • Can you show me proof of liability insurance and your bond?
  • Is my panel big enough, or does it need an upgrade first?
  • Where will the wire run, and what does each extra foot cost?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Mcleod Electric

Five quick questions. We pass your request to Mcleod Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Mcleod Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More EV charger installers near 78723 and 78704

See all 93 EV charger installers in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.