contractors.fyi
Sign in

Mitchell Electric

EV charger installer working in Austin.

  • License active

5 jobs on Austin permits, 2021 to 2026: 3 EV charger installations, 2 panel upgrades. 88th most EV charger permits of 93 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 17005, valid until Jul 14, 2027We matched it by the phone on their permits.Checks out
Jobs on record5 jobs on Austin permits, 2021 to 2026: 3 EV charger installations, 2 panel upgrades88th most EV charger permits of 93 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a EV charger permit stays open about 6 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 5 days. How long EV charger jobs take.

Track record

Where they work most

  • 787512 jobs
  • 787231 job
  • 787041 job
  • 787351 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jan 5, 2026Panel upgradeRebuild the existing electric service at 4514 Ave H from a 60 amp service to meet code on a…78751not stated
Jan 27, 2025EV chargerRequest to Disconnect Replace an existing 100 amp electrical service with a 200 amp electrical…78751not stated
May 28, 2024Panel upgradeREQUEST TO DISCONNECT Replace the breaker box and main breaker next to the meter can and replace a…78723not stated
Dec 12, 2022EV chargerAdd a EV charging station at a single family residence 240 volt 50 amp78704not stated
Sep 30, 2021EV chargerInstall a 60 amp EV charging point in a single family home using the existing electric service78735not stated

What to ask before you hire

About Mitchell Electric

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any EV charger installer

  • Can you show me proof of liability insurance and your bond?
  • Is my panel big enough, or does it need an upgrade first?
  • Where will the wire run, and what does each extra foot cost?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Mitchell Electric

Five quick questions. We pass your request to Mitchell Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Mitchell Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More EV charger installers near 78751 and 78723

See all 93 EV charger installers in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.