Crystal Electric Inc
Panel upgrade electrician working in Boulder.
- Boulder publishes no contractor license list we can check
23 jobs on Boulder permits, 2023 to 2026: 20 panel upgrades, 3 EV charger installations. 11th most panel upgrade permits of 64 contractors in Boulder.
What the public records show
From the city's permits, one question at a time.
| Question | Records show | Mark |
|---|---|---|
| Licensed? | Boulder publishes no contractor license list we can checkThat says nothing about this business either way. | Ask them |
| Jobs on record | 23 jobs on Boulder permits, 2023 to 2026: 20 panel upgrades, 3 EV charger installations11th most panel upgrade permits of 64 contractors in Boulder. That counts jobs, not quality.Our Boulder permit records cover September 2021 to September 2026. |
Records: City of Boulder permits.
Cost and timing
All panel upgrade jobs in Boulder: $2,500 to $7,500
Half of 959 city permits list an amount in this range. Permit amounts are often lower than what you pay.
- Panel upgrades in Boulder: $2,700 to $7,200 (728 permits)
How to read this range
Contractors write a job value on the permit form, and the city uses it to set the permit fee. It is not the contract price, and it is often lower than what you pay. A quarter of the permits list less than this range, and a quarter list more. Use it to see if a quote is in the normal range.
Permit value (not a price)
Their typical permit lists $3,160 (half list more, half less)
That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Boulder.
Get 2 or 3 written quotes.
Track record
20 jobs in the last 12 months, up from 2 the year before
Where they work most
- 8030218 jobs
- 803053 jobs
- 803042 jobs
Jobs by kind of work
Latest jobs
Permit values are what the contractor wrote on the permit form, not what the owner paid.
A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.
| Date | Work | ZIP | On the permit form |
|---|---|---|---|
| Sep 10, 2026 | Panel upgrade | 80302 | $3,413 |
| Sep 10, 2026 | Panel upgrade | 80302 | $3,675 |
| Sep 10, 2026 | Panel upgrade | 80302 | $6,900 |
| Sep 10, 2026 | Panel upgrade? Change the overhead service to underground. ? Change the meter and add a 100A disconnect | 80302 | $2,869 |
| Sep 10, 2026 | Panel upgrade | 80302 | $8,850 |
| Sep 10, 2026 | Panel upgrade? Change the overhead service to underground. ? Complete an all-in-one service change | 80302 | $3,169 |
| Sep 10, 2026 | Panel upgrade? Change the overhead service to underground. ? Complete an all-in-one service change | 80302 | $3,188 |
| Sep 10, 2026 | Panel upgrade? Change overhead service to underground. ? Move the meter and replace the panel | 80302 | $3,038 |
| Sep 10, 2026 | Panel upgrade | 80302 | $4,069 |
| Sep 10, 2026 | Panel upgrade | 80302 | $2,644 |
| Sep 10, 2026 | Panel upgrade? Change the overhead service to underground. ? Change the meter, add a disconnect, run a new water… | 80302 | $3,244 |
| Sep 10, 2026 | Panel upgrade | 80302 | $3,600 |
| Dec 10, 2025 | Panel upgradeRun electrical to an existing shed, add outlets, switches, and lights inside the shed, and install… | 80305 | $3,150 |
| Nov 26, 2025 | Panel upgrade (×2, same day)Upgrade the overhead service to underground | 80302 | $2,625 each |
| Nov 26, 2025 | EV chargerChange overhead service to underground service | 80302 | $3,938 |
| Nov 26, 2025 | EV chargerChange from overhead service to underground service. Run surface conduit and add a 50A 240V… | 80302 | $3,075 |
| Oct 9, 2025 | Panel upgradeChange from overhead service to underground service. Install a new meter housing. Install a new… | 80302 | $1,875 |
| Oct 8, 2025 | EV chargerChange from overhead service to underground service. Add a 240V 50A circuit with a breaker in a… | 80302 | $2,250 |
| Oct 7, 2025 | Panel upgradeUpgrade the electrical service to 200A with a new panel in the garage | 80305 | $2,812 |
| Mar 6, 2025 | Panel upgradeWithdrawn - Duplicate Permit Relocate and upgrade service to 200amp service | 80304 | $3,500 |
| Jan 15, 2025 | Panel upgradeUpgrade 100A panel to 200A panel/meter combo outside | 80305 | $1,800 |
| Jul 18, 2023 | Panel upgrade100 amp service upgrading to 200amp serivice no new load | 80304 | $2,800 |
What to ask before you hire
About Crystal Electric Inc
- Ask for their license number and check it with the state.
- Ask what the warranty covers and for how long, in writing.
- Search their name on the Better Business Bureau site, and read their reviews.
Worth asking any panel upgrade electrician
- Can you show me proof of liability insurance and your bond?
- What size panel, and does the utility need to change the service to my house?
- Who arranges the power shutoff with the utility?
- Who pulls the permit, and who meets the inspector?
Get a quote from Crystal Electric Inc
Five quick questions. We pass your request to Crystal Electric Inc.
Request for Crystal Electric Inc
- Where
- Job
- Start
- Budget
- Goes to
You decide who to hire. Your details go only to the contractors you pick. How we use your details
Sent. We have your request.
We pass it to Crystal Electric Inc. Replies usually come within a few days.
Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.
Open your job roomMore panel upgrade electricians near 80302 and 80305
- Precision Plumbing & Heating
- Exceed Electrical Contracting
- Mr Electric of Boulder
- Titus Electrical Services
- Klm Electric
- Table Mountain Electric Inc
See all 64 panel upgrade electricians in Boulder, ranked by jobs
Run this business? Claim this page to get requests by email and reply to homeowners here.