contractors.fyi
Sign in

C. Bradley Electric

Panel upgrade electrician based in Chicago.

  • License active

5 panel upgrade jobs on Chicago permits, 2021 to 2023. 268th most panel upgrade permits of 460 contractors in Chicago.

What the public records show

From the city's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License ECC93760, active in the city's records on Oct 2, 2026Electrical Contractor (General)We found this license by the business name. No other active license has that name.Checks out
Jobs on record5 panel upgrade jobs on Chicago permits, 2021 to 2023Every permit we have for them is panel upgrade.268th most panel upgrade permits of 460 contractors in Chicago. That counts jobs, not quality.Our Chicago permit records cover September 2021 to September 2026.

Records: the city Department of Buildings and City of Chicago permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $9,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Chicago.

Get 2 or 3 written quotes.

Permit wait

Across Chicago, panel upgrade permits usually take same day to be issued

How long panel upgrade jobs take.

Track record

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkOn the permit form
Jul 10, 2023Panel upgrade1. install new circuit break panel, goldwater ground and grounding elec 2. install carbon and…$2,200
Apr 29, 2023Panel upgrade1. install new 3phase 42 space break panel$9,300
Apr 23, 2023Panel upgradeInstall 100amp service install all new eat install 10 new circuits$9,000
Apr 19, 2023Panel upgrade200amp service / 3meters 2 apps = 1 build install complete new electrical system ie$20,000
Dec 7, 2021Panel upgrade1. install 200 amp service to serve two unit bldg 2.. install three gang meter cabinet and three…$4,800

What to ask before you hire

About C. Bradley Electric

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from C. Bradley Electric

Five quick questions. We pass your request to C. Bradley Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to C. Bradley Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians

See all 460 panel upgrade electricians in Chicago, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.