contractors.fyi
Sign in

Phase One Electric LLC

Panel upgrade electrician working in Chicago.

  • No license matched this business by name in the city's records

6 panel upgrade jobs on Chicago permits, 2021 to 2023. 248th most panel upgrade permits of 460 contractors in Chicago.

What the public records show

From the city's permits, one question at a time.

QuestionRecords showMark
Licensed?No license matched this business by name in the city's recordsLook them up on the city's license page.Ask them
Jobs on record6 panel upgrade jobs on Chicago permits, 2021 to 2023Every permit we have for them is panel upgrade.248th most panel upgrade permits of 460 contractors in Chicago. That counts jobs, not quality.Our Chicago permit records cover September 2021 to September 2026.

Records: City of Chicago permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $3,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Chicago.

Get 2 or 3 written quotes.

Permit wait

Across Chicago, panel upgrade permits usually take same day to be issued

How long panel upgrade jobs take.

Track record

Jobs per quarter

Q3 2021: 1 jobQ4 2021: 1 jobQ1 2022: 2 jobsQ2 2022: 1 jobQ1 2023: 1 jobBusiest: 2 jobsLatest: 1 job20222023
Each bar is 3 months of permits. The tallest is 2 jobs, January to March 2022.

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkOn the permit form
Jan 18, 2023Panel upgradeInterior rehab on an existing single family residence.new drywall, interior stair relocation$80,000
Apr 20, 2022Panel upgradeInstall all new electrical wiring as$5,000
Jan 21, 2022Panel upgradeInstall new switches and outlets and lights replace the electrical panel and some minor electrical…$3,000
Jan 12, 2022Panel upgradeInstall new switches and outlets and new lights replace the electrical panel$3,000
Dec 3, 2021Panel upgradeInstall new 3 gang meter and new 100- amp panel for the public service to building$2,000
Sep 25, 2021Panel upgradeUpgrade existing electrical service from100 amp to 200 amp service complete with new equipment$2,500

What to ask before you hire

About Phase One Electric LLC

  • Ask for the license number and check it with the city.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Phase One Electric LLC

Five quick questions. We pass your request to Phase One Electric LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Phase One Electric LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians

See all 460 panel upgrade electricians in Chicago, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.