contractors.fyi
Sign in

Taylor Electric Company

Panel upgrade electrician based in Chicago.

  • License active

22 jobs on Chicago permits, 2021 to 2026: 20 panel upgrades, 2 EV charger installations. 79th most panel upgrade permits of 460 contractors in Chicago.

What the public records show

From the city's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License ECC94688, active in the city's records on Oct 2, 2026Electrical Contractor (General)We found this license by the business name. No other active license has that name.Checks out
Jobs on record22 jobs on Chicago permits, 2021 to 2026: 20 panel upgrades, 2 EV charger installations79th most panel upgrade permits of 460 contractors in Chicago. That counts jobs, not quality.Our Chicago permit records cover September 2021 to September 2026.

Records: the city Department of Buildings and City of Chicago permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $5,750 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Chicago.

Get 2 or 3 written quotes.

Permit wait

Across Chicago, panel upgrade permits usually take same day to be issued

How long panel upgrade jobs take.

Track record

5 jobs in the last 12 months, down from 7 the year before

Q4 2021: 1 jobQ1 2022: 1 jobQ3 2022: 2 jobsQ4 2023: 1 jobQ2 2024: 3 jobsQ3 2024: 2 jobsQ1 2025: 1 jobQ2 2025: 4 jobsQ3 2025: 2 jobsQ4 2025: 1 jobQ1 2026: 2 jobsQ2 2026: 2 jobsBusiest: 4 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 4 jobs, April to June 2025. Across Chicago, all contractors together had 8% more panel upgrade jobs in the last 12 months than in the 12 months before.

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkOn the permit form
May 29, 2026Panel upgradeLine voltage electrical work$1,200
May 26, 2026Panel upgrade$60,000
Mar 31, 2026Panel upgrade$5,000
Jan 16, 2026Panel upgrade$5,000
Oct 7, 2025Panel upgrade$19,400
Sep 22, 2025Panel upgrade$5,000
Aug 7, 2025Panel upgrade$5,000
Jun 26, 2025Panel upgrade$20,000
May 28, 2025Panel upgrade$5,000
May 23, 2025Panel upgrade$35,000
Apr 15, 2025Panel upgrade$50,000
Mar 10, 2025Panel upgradeLine voltage electrical work$2,500
Jul 31, 2024EV chargerInstall (2) 50a ev chargers$4,150
Jul 6, 2024Panel upgradeInstall new 200a service, install new 200a panel$3,900
Jun 21, 2024Panel upgradeRunning temporary cable and installing spider boxes i suites as needed for the democratic national…$50,000
Jun 5, 2024EV chargerInstall 2 new 50a ev chargers$3,340
Apr 30, 2024Panel upgrade**electrical only permit**-install 400a service -install new 7 position meter socket -install 6…$6,500
Nov 2, 2023Panel upgradeNew 200 amp service 5 socket horizontal meter new panels for 4 apts$8,000
Sep 26, 2022Panel upgradeReplace overhead 200 amp service drop 4 socket meter bank 3 apartment load centers 1 public load…$8,000
Jul 2, 2022Panel upgradeInstall 277/480v 100a service -install ground rod -install 277/480v 100a panel 18 circuit panel$9,000
Feb 20, 2022Panel upgradeVerify rough-in/installation of all electrical devices -pull equipment ground through all raceways,…$2,800
Dec 3, 2021Panel upgradeInstall new service riser -install new meter socket -install new 100a panel$3,000

What to ask before you hire

About Taylor Electric Company

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Taylor Electric Company

Five quick questions. We pass your request to Taylor Electric Company.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Taylor Electric Company. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians

See all 460 panel upgrade electricians in Chicago, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.