contractors.fyi
Sign in

Flt Construction, LLC

Panel upgrade electrician working in Cleveland.

  • Cleveland publishes no contractor license list we can check

106 jobs on Cleveland permits, 2021 to 2026: 105 panel upgrades, 1 roofing job. 2nd most panel upgrade permits of 124 contractors in Cleveland.

What the public records show

From the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Cleveland publishes no contractor license list we can checkTheir permits give license or registration ELECT18-003149. We could not check it.That says nothing about this business either way.Ask them
Jobs on record106 jobs on Cleveland permits, 2021 to 2026: 105 panel upgrades, 1 roofing job2nd most panel upgrade permits of 124 contractors in Cleveland. That counts jobs, not quality.Our Cleveland permit records cover September 2021 to September 2026.

Records: City of Cleveland permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $4,500 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. Kitchen jobs alone: typical permit $8,000 (3 permits, a small sample). What panel upgrade jobs cost in Cleveland.

Get 2 or 3 written quotes.

Track record

28 jobs in the last 12 months, down from 34 the year before

Q3 2021: 1 jobQ4 2021: 4 jobsQ1 2022: 2 jobsQ2 2022: 3 jobsQ3 2022: 1 jobQ4 2022: 5 jobsQ1 2023: 2 jobsQ2 2023: 6 jobsQ3 2023: 6 jobsQ4 2023: 2 jobsQ1 2024: 7 jobsQ2 2024: 2 jobsQ3 2024: 4 jobsQ4 2024: 5 jobsQ1 2025: 4 jobsQ2 2025: 15 jobsQ3 2025: 11 jobsQ4 2025: 7 jobsQ1 2026: 4 jobsQ2 2026: 13 jobsQ3 2026: 2 jobsBusiest: 15 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 15 jobs, April to June 2025. Across Cleveland, all contractors together had 10% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 4410520 jobs
  • 4410820 jobs
  • 4412012 jobs
  • 441049 jobs
  • 441109 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Aug 7, 2026Panel upgrade, 200 sq ftINSTALL 200 SQUARE FEET: install 100amp meter base with disconnect and 100 amp Sub Panel44105$3,000
Jul 2, 2026Panel upgrade, 200 sq ftINSTALL 200 SQUARE FEET: install two ground rods and cold water grounding to panels44105not stated
Jun 29, 2026Panel upgrade, 750 sq ftINSTALL 750 SQUARE FEET: install 200 Amp Meter base Two 100amp Sub Panel and Rewire44105$8,000
Jun 22, 2026Panel upgradeInstall two 100 amp panels partial rewire44105$4,000
Jun 15, 2026Panel upgradeInstall 200amp Meter Base install two 100 amp sub panels rewire44104$8,000
Jun 11, 2026Panel upgrade, 200 sq ftINSTALL 200 SQUARE FEET: Install 100amp Meter base with disconnect and 100amp Sub Panel44128$4,000
Jun 3, 2026Panel upgrade, 750 sq ftINSTALL 750 SQUARE FEET: install 300amp Meterbase 2) 100 amp Sub Panels 1) 50 amp panel Rewire44120$8,000
Jun 3, 2026Panel upgrade, 700 sq ftINSTALL 700 SQUARE FEET: install 200amp Meterbase and 2)100amp Sub Panels Rewire44108$8,000
Jun 3, 2026Panel upgradeMETER BASE/SERVICE PANEL INSPECTION: install ground wire from cold water main to panel and install…44105not stated
May 28, 2026Panel upgradeInstall 100amp Meter base and 100amp Panel44128$3,200
May 20, 2026Panel upgradeInstall 200amp 2 gang meter base and two100amp Sub panels44105$3,500
May 20, 2026Panel upgradeInstall 200amp Mete base and two 100amp sub panels44103$3,500
May 6, 2026Panel upgradeInstall 200 amp meter base install system grounding install (2)100 amp sub panels44103$6,000
Apr 29, 2026Panel upgrade, 200 sq ftINSTALL 200 SQUARE FEET: install 2 ground rods install ground wire from main panel to cold water…44111not stated
Apr 17, 2026Panel upgradeInstall grounding for 100 amp Service and 100 amp Panel Secure loose exposed Service Entrance Cable…44108not stated
Mar 18, 2026Panel upgrade, 400 sq ftINSTALL 400 SQUARE FEET: install 100 amp meter base with disconnect and 100amp Sub Panel44120$3,000
Mar 12, 2026Panel upgradeInstall 100 amp panel and 100amp meter base44105$5,000
Feb 13, 2026Panel upgrade, 300 sq ftINSTALL 300 SQUARE FEET: 200-amp meter base install two 100amp panels44108$3,500
Jan 8, 2026Panel upgradeInstall 100 amp meter base and 100amp main panel (Sub)44128$3,000
Dec 30, 2025Panel upgrade200 amp meter base (2) 100 amp panel boxes44110$5,000
Dec 12, 2025Panel upgrade, 400 sq ft44108$12,000
Dec 12, 2025ReroofMake int/ext alt44108$15,000
Dec 1, 2025Panel upgradeInstall 3- 100 amp sub panels, 300 amp meterbase44127$4,500
Nov 24, 2025Panel upgrade200 amp meter base, two 100 amp sub panels44104$4,500
Nov 24, 2025Panel upgrade, 1000 sq ft1000 sq ft- rewire 200 amp meter base, two 100 amp sub panels44105$10,000
Nov 20, 2025Panel upgradeMeter based /service panel inspection44104not stated
Sep 26, 2025Panel upgradeInstall 2 100 amp panels, install proper grounding44110$2,500
Sep 26, 2025Panel upgradeInstall meter base and sub panel44111$3,500
Sep 12, 2025Panel upgradeInstall (2) ground rods - ground panel 10 water main - install four breakers44128not stated
Sep 5, 2025Panel upgradeMeter base/ service panel inspection: 200 amp meterbase two 100amp sub panels44105$3,800
Aug 12, 2025Panel upgrade, 700 sq ft700 sq ft - rewire install 200 amp meter base 200 amp sub panel44113$9,500
Jul 30, 2025Panel upgradeWork order # 772-451985 install 10v amp meterbase install 100amp panel44108$5,000
Jul 17, 2025Panel upgrade, 300 sq ft44105$3,500
Jul 15, 2025Panel upgrade1- 200 amp meterbase, 1-100 ampmeterbase, 3-100 amp sub panels44112$8,000
Jul 15, 2025Panel upgrade, 600 sq ft44103$10,000
Jul 3, 2025Panel upgrade, 100 sq ftPartial rewire 100 square feet install 100 amp meter base and sub panel44105$4,800
Jul 3, 2025Panel upgradeInstall 100 amp meter base install 100 amp sub panel44120$4,000
Jun 26, 2025Panel upgrade, 700 sq ft44108$9,000
Jun 26, 2025Panel upgrade200 amp meterbase/two 100 amp sub panels, 2 ground rods44105$6,000
Jun 9, 2025Panel upgradeInstall 200 amp meter base two 100 amp sub panels44108$4,500

What to ask before you hire

About Flt Construction, LLC

  • Ask for their license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Flt Construction, LLC

Five quick questions. We pass your request to Flt Construction, LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Flt Construction, LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 44105 and 44108

See all 124 panel upgrade electricians in Cleveland, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.