Flt Construction, LLC
Panel upgrade electrician working in Cleveland.
- Cleveland publishes no contractor license list we can check
106 jobs on Cleveland permits, 2021 to 2026: 105 panel upgrades, 1 roofing job. 2nd most panel upgrade permits of 124 contractors in Cleveland.
What the public records show
From the city's permits, one question at a time.
| Question | Records show | Mark |
|---|---|---|
| Licensed? | Cleveland publishes no contractor license list we can checkTheir permits give license or registration ELECT18-003149. We could not check it.That says nothing about this business either way. | Ask them |
| Jobs on record | 106 jobs on Cleveland permits, 2021 to 2026: 105 panel upgrades, 1 roofing job2nd most panel upgrade permits of 124 contractors in Cleveland. That counts jobs, not quality.Our Cleveland permit records cover September 2021 to September 2026. |
Records: City of Cleveland permits.
Cost and timing
All panel upgrade jobs in Cleveland: $2,000 to $6,000
Half of 2,007 city permits list an amount in this range. Permit amounts are often lower than what you pay.
- Panel upgrades in Cleveland: $2,100 to $7,000 (1,160 permits)
How to read this range
Contractors write a job value on the permit form, and the city uses it to set the permit fee. It is not the contract price, and it is often lower than what you pay. A quarter of the permits list less than this range, and a quarter list more. Use it to see if a quote is in the normal range.
Permit value (not a price)
Their typical permit lists $4,500 (half list more, half less)
That is the figure written on the permit form, which can be far from what you pay. Kitchen jobs alone: typical permit $8,000 (3 permits, a small sample). What panel upgrade jobs cost in Cleveland.
Get 2 or 3 written quotes.
Track record
28 jobs in the last 12 months, down from 34 the year before
Where they work most
- 4410520 jobs
- 4410820 jobs
- 4412012 jobs
- 441049 jobs
- 441109 jobs
Jobs by kind of work
Latest jobs
Permit values are what the contractor wrote on the permit form, not what the owner paid.
| Date | Work | ZIP | On the permit form |
|---|---|---|---|
| Aug 7, 2026 | Panel upgrade, 200 sq ftINSTALL 200 SQUARE FEET: install 100amp meter base with disconnect and 100 amp Sub Panel | 44105 | $3,000 |
| Jul 2, 2026 | Panel upgrade, 200 sq ftINSTALL 200 SQUARE FEET: install two ground rods and cold water grounding to panels | 44105 | not stated |
| Jun 29, 2026 | Panel upgrade, 750 sq ftINSTALL 750 SQUARE FEET: install 200 Amp Meter base Two 100amp Sub Panel and Rewire | 44105 | $8,000 |
| Jun 22, 2026 | Panel upgradeInstall two 100 amp panels partial rewire | 44105 | $4,000 |
| Jun 15, 2026 | Panel upgradeInstall 200amp Meter Base install two 100 amp sub panels rewire | 44104 | $8,000 |
| Jun 11, 2026 | Panel upgrade, 200 sq ftINSTALL 200 SQUARE FEET: Install 100amp Meter base with disconnect and 100amp Sub Panel | 44128 | $4,000 |
| Jun 3, 2026 | Panel upgrade, 750 sq ftINSTALL 750 SQUARE FEET: install 300amp Meterbase 2) 100 amp Sub Panels 1) 50 amp panel Rewire | 44120 | $8,000 |
| Jun 3, 2026 | Panel upgrade, 700 sq ftINSTALL 700 SQUARE FEET: install 200amp Meterbase and 2)100amp Sub Panels Rewire | 44108 | $8,000 |
| Jun 3, 2026 | Panel upgradeMETER BASE/SERVICE PANEL INSPECTION: install ground wire from cold water main to panel and install… | 44105 | not stated |
| May 28, 2026 | Panel upgradeInstall 100amp Meter base and 100amp Panel | 44128 | $3,200 |
| May 20, 2026 | Panel upgradeInstall 200amp 2 gang meter base and two100amp Sub panels | 44105 | $3,500 |
| May 20, 2026 | Panel upgradeInstall 200amp Mete base and two 100amp sub panels | 44103 | $3,500 |
| May 6, 2026 | Panel upgradeInstall 200 amp meter base install system grounding install (2)100 amp sub panels | 44103 | $6,000 |
| Apr 29, 2026 | Panel upgrade, 200 sq ftINSTALL 200 SQUARE FEET: install 2 ground rods install ground wire from main panel to cold water… | 44111 | not stated |
| Apr 17, 2026 | Panel upgradeInstall grounding for 100 amp Service and 100 amp Panel Secure loose exposed Service Entrance Cable… | 44108 | not stated |
| Mar 18, 2026 | Panel upgrade, 400 sq ftINSTALL 400 SQUARE FEET: install 100 amp meter base with disconnect and 100amp Sub Panel | 44120 | $3,000 |
| Mar 12, 2026 | Panel upgradeInstall 100 amp panel and 100amp meter base | 44105 | $5,000 |
| Feb 13, 2026 | Panel upgrade, 300 sq ftINSTALL 300 SQUARE FEET: 200-amp meter base install two 100amp panels | 44108 | $3,500 |
| Jan 8, 2026 | Panel upgradeInstall 100 amp meter base and 100amp main panel (Sub) | 44128 | $3,000 |
| Dec 30, 2025 | Panel upgrade200 amp meter base (2) 100 amp panel boxes | 44110 | $5,000 |
| Dec 12, 2025 | Panel upgrade, 400 sq ft | 44108 | $12,000 |
| Dec 12, 2025 | ReroofMake int/ext alt | 44108 | $15,000 |
| Dec 1, 2025 | Panel upgradeInstall 3- 100 amp sub panels, 300 amp meterbase | 44127 | $4,500 |
| Nov 24, 2025 | Panel upgrade200 amp meter base, two 100 amp sub panels | 44104 | $4,500 |
| Nov 24, 2025 | Panel upgrade, 1000 sq ft1000 sq ft- rewire 200 amp meter base, two 100 amp sub panels | 44105 | $10,000 |
| Nov 20, 2025 | Panel upgradeMeter based /service panel inspection | 44104 | not stated |
| Sep 26, 2025 | Panel upgradeInstall 2 100 amp panels, install proper grounding | 44110 | $2,500 |
| Sep 26, 2025 | Panel upgradeInstall meter base and sub panel | 44111 | $3,500 |
| Sep 12, 2025 | Panel upgradeInstall (2) ground rods - ground panel 10 water main - install four breakers | 44128 | not stated |
| Sep 5, 2025 | Panel upgradeMeter base/ service panel inspection: 200 amp meterbase two 100amp sub panels | 44105 | $3,800 |
| Aug 12, 2025 | Panel upgrade, 700 sq ft700 sq ft - rewire install 200 amp meter base 200 amp sub panel | 44113 | $9,500 |
| Jul 30, 2025 | Panel upgradeWork order # 772-451985 install 10v amp meterbase install 100amp panel | 44108 | $5,000 |
| Jul 17, 2025 | Panel upgrade, 300 sq ft | 44105 | $3,500 |
| Jul 15, 2025 | Panel upgrade1- 200 amp meterbase, 1-100 ampmeterbase, 3-100 amp sub panels | 44112 | $8,000 |
| Jul 15, 2025 | Panel upgrade, 600 sq ft | 44103 | $10,000 |
| Jul 3, 2025 | Panel upgrade, 100 sq ftPartial rewire 100 square feet install 100 amp meter base and sub panel | 44105 | $4,800 |
| Jul 3, 2025 | Panel upgradeInstall 100 amp meter base install 100 amp sub panel | 44120 | $4,000 |
| Jun 26, 2025 | Panel upgrade, 700 sq ft | 44108 | $9,000 |
| Jun 26, 2025 | Panel upgrade200 amp meterbase/two 100 amp sub panels, 2 ground rods | 44105 | $6,000 |
| Jun 9, 2025 | Panel upgradeInstall 200 amp meter base two 100 amp sub panels | 44108 | $4,500 |
What to ask before you hire
About Flt Construction, LLC
- Ask for their license number and check it with the state.
- Ask what the warranty covers and for how long, in writing.
- Search their name on the Better Business Bureau site, and read their reviews.
Worth asking any panel upgrade electrician
- Can you show me proof of liability insurance and your bond?
- What size panel, and does the utility need to change the service to my house?
- Who arranges the power shutoff with the utility?
- Who pulls the permit, and who meets the inspector?
Get a quote from Flt Construction, LLC
Five quick questions. We pass your request to Flt Construction, LLC.
Request for Flt Construction, LLC
- Where
- Job
- Start
- Budget
- Goes to
You decide who to hire. Your details go only to the contractors you pick. How we use your details
Sent. We have your request.
We pass it to Flt Construction, LLC. Replies usually come within a few days.
Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.
Open your job roomMore panel upgrade electricians near 44105 and 44108
- B.b.c. Electric Co Inc (the)
- A-1 Electric & Development
- Gilbert Electric
- Connected Electrical LLC
- Energize Electric LLC
- Green Integrated Services Inc
See all 124 panel upgrade electricians in Cleveland, ranked by jobs
Run this business? Claim this page to get requests by email and reply to homeowners here.