contractors.fyi
Sign in

J I Electric

Solar installer working in Los Angeles. Licensed since 2019.

  • License active
  • Workers' comp on file

12 solar system jobs on Los Angeles permits, 2023 to 2026. 264th most solar system permits of 561 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1050414, active in the state's records on Sep 23, 2026ElectricalThe board's public record lists 1 item. See the record below.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2019
Jobs on record12 solar system jobs on Los Angeles permits, 2023 to 2026Every permit we have for them is solar system.264th most solar system permits of 561 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover June 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

State license board record

1 citation.
How to read this

The Contractors State License Board lists complaints it has sent for legal action, citations it has issued, and warning letters. A complaint or accusation is an allegation, not a finding. A citation is the board's finding that a rule was broken; the contractor can appeal it. Complaints closed in the contractor's favor are never listed. Most contractors have no items.

  • CitationNov 30, 2021 · Citation 2 2021 1575

    The board issued a citation on Nov 30, 2021.

    Listed: failed to report the employment of a registered salesperson; contr has recvd/reqstd more money than work completed

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1050414 on CSLB

Cost and timing

Permit timeline

Across Los Angeles, a solar system permit stays open about about 8 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 62 days. How long solar system jobs take.

Track record

3 jobs in the last 12 months, about the same as 3 the year before

Q2 2023: 1 jobQ2 2024: 4 jobsQ3 2024: 1 jobQ1 2025: 1 jobQ2 2025: 1 jobQ3 2025: 1 jobQ4 2025: 2 jobsQ3 2026: 1 jobBusiest: 4 jobsLatest: 1 job202420252026
Each bar is 3 months of permits. The tallest is 4 jobs, April to June 2024.

Where they work most

  • 913421 job
  • 916071 job
  • 914361 job
  • 913061 job
  • 900651 job

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jul 22, 2026SolarInstallation of roof-mounted Central/String inverter solar photovoltaic (PV) system interconnected…91342not stated
Nov 17, 2025Solar, 38.4 kW91607not stated
Oct 24, 2025Solar, 38.4 kW91436not stated
Aug 7, 2025Solar, 10 kWInstallation of an AC Coupled Energy Storage System with a rating not exceeding 10 kW…91306not stated
Jun 17, 2025Solar, 38.4 kW90065not stated
Jan 6, 2025Solar, 38.4 kW91325not stated
Aug 29, 2024Solar, 38.4 kW91335not stated
Jun 13, 2024Solar, 10.9 kW12kWDC/ 10.9KW AC roof mount solar system add on to an existing solar system with 30 modules/…90027not stated
Jun 6, 2024Solar, 3.5 kWNew roof mounted solar PV1 system with (11) modules/microinverters and (1) combiner box90003not stated
Apr 24, 2024Solar[ePlan] New roof-mounted solar PV1 system installed alongside existing PV. Scope includes (21)…90732not stated
Apr 17, 2024Solar, 38.4 kW90045not stated
Jun 21, 2023Solar[eplan] new rooftop mounted pv1 installation with (24) modules, (1) central inverter all…90272not stated

What to ask before you hire

About J I Electric

  • Ask what the warranty covers and for how long, in writing.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from J I Electric

Five quick questions. We pass your request to J I Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to J I Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers near 91342 and 91607

See all 561 solar installers in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.