contractors.fyi
Sign in

J M A General Contractor

ADU builder based in Woodland Hills. Licensed since 2007.

  • License active
  • No workers' comp: the business told the state it has no employees

10 jobs on Los Angeles permits, 2024 to 2026: 4 ADUs, 3 home additions, 2 remodels, 1 pool or spa. 140th most ADU permits of 271 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 893018, active in the state's records on Sep 23, 2026General buildingNo complaints or citations on the board's public record.Checks out
Workers' comp?No workers' comp: the business told the state it has no employeesThis covers their crew if someone is hurt. It is not insurance for your home.Ask them
In business?Licensed since 2007
Jobs on record10 jobs on Los Angeles permits, 2024 to 2026: 4 ADUs, 3 home additions, 2 remodels, 1 pool or spaThey are based in Woodland Hills. Work outside Los Angeles is not in these records.140th most ADU permits of 271 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover September 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 893018 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $73,100 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What ADU jobs cost in Los Angeles.

Get 2 or 3 written quotes.

Permit timeline

Across Los Angeles, a ADU permit stays open about about 12 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about about 4 months. How long ADU jobs take.

Track record

4 jobs in the last 12 months, about the same as 4 the year before

Q3 2024: 3 jobsQ4 2024: 1 jobQ1 2025: 2 jobsQ3 2025: 1 jobQ4 2025: 1 jobQ1 2026: 2 jobsBusiest: 3 jobsLatest: 2 jobs20252026
Each bar is 3 months of permits. The tallest is 3 jobs, July to September 2024. Across Los Angeles, all contractors together had 1% more ADU jobs in the last 12 months than in the 12 months before.

Where they work most

  • 913162 jobs
  • 900192 jobs
  • 900681 job
  • 900491 job
  • 913031 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Mar 12, 2026Remodel1 bathroom(s).Bathroom remodel for residential buildings (no structural changes)90068$12,000
Jan 10, 2026AdditionADD 9'x14'-6" (115.4 SF) TO THE MASTER BEDROOM AND 10'x14'-6" (151.691316$60,000
Nov 4, 2025ADU(n) 20' x 11'6" detached accessory dwelling unit as per gcs 65852.2(e)90049$25,000
Sep 18, 2025ADUCONVERT THE EXIST. 18' x 20' DETACHED GARAGE IN AN ACCESSORY DWELLING91303$20,000
Mar 28, 2025Pool or spaNew swimming pool on piles91436$50,000
Jan 15, 2025Addition(n) 7' x 16'10" addition to (e) detached garage & convert to (n) acces91335$30,000
Nov 12, 2024ADU(N) 1-STORY ACCESSORY DWELLING UNIT PER LAMC 12.22.A.33.(c)-(d)91356$121,200
Sep 24, 2024RemodelAdd 1,009 ft to SFD through a comprehensive interior remodel AND DEMO 17'X16' ATTACHED PATIO COVER91316$150,000
Sep 7, 2024AdditionAdd new adu addition attached to (e) existing two car garage per city90019$150,000
Sep 7, 2024ADUAdd new adu addition attached to (e) existing two car garage per city90019$150,000

What to ask before you hire

About J M A General Contractor

  • Ask who will do the work. Anyone they pay to work on your home must be covered by workers' comp.
  • Ask what the warranty covers and for how long, in writing.

Worth asking any ADU builder

  • Can you show me proof of liability insurance and your bond?
  • Do you handle the plans, engineering and utility hookups, or do I?
  • How long from permit to the final inspection on your last three ADUs?
  • What is the payment schedule, and what is extra?

Get a quote from J M A General Contractor

Five quick questions. We pass your request to J M A General Contractor.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to J M A General Contractor. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More ADU builders near 91316 and 90019

See all 271 ADU builders in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.