contractors.fyi
Sign in

Jerahian Araz

ADU builder based in Upland.

  • License 1045340 was not in the state's records on Sep 23, 2026

19 jobs on Los Angeles permits, 2023 to 2025: 14 ADUs, 4 home additions, 1 roofing job.

We could not find an active or renewable license for this business in the state's records on Sep 23, 2026. Check the license with the state before you hire.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1045340 was not in the state's records on Sep 23, 2026Problem
Jobs on record19 jobs on Los Angeles permits, 2023 to 2025: 14 ADUs, 4 home additions, 1 roofing jobThey are based in Upland. Work outside Los Angeles is not in these records.Our Los Angeles permit records cover September 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $80,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What ADU jobs cost in Los Angeles.

Get 2 or 3 written quotes.

Permit timeline

Across Los Angeles, a ADU permit stays open about about 12 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about about 4 months. How long ADU jobs take.

Track record

0 jobs in the last 12 months, down from 8 the year before

Q4 2023: 7 jobsQ2 2024: 1 jobQ3 2024: 4 jobsQ4 2024: 4 jobsQ2 2025: 2 jobsQ3 2025: 1 jobBusiest: 7 jobsLatest: 1 job20242025
Each bar is 3 months of permits. The tallest is 7 jobs, October to December 2023. Across Los Angeles, all contractors together had 1% more ADU jobs in the last 12 months than in the 12 months before.

Where they work most

  • 900035 jobs
  • 900373 jobs
  • 900473 jobs
  • 900442 jobs
  • 900011 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jul 5, 2025ADU2-story attached adu per ordinance90001$112,413
May 16, 2025AdditionConversion of (e) attached garage to an adu, with addition per lamc 190003$50,000
May 16, 2025ADUConversion of (e) attached garage to an adu, with addition per lamc 190003$50,000
Dec 18, 2024ADUNEW 1-STORY ADU PER LAMC 12.22A33 (c)-(d)90037$114,532
Nov 13, 2024AdditionCONVERSION OF EXISTING GARAGE AND ADDITION INTO TWO ADUs for Multifam90047$65,000
Nov 13, 2024ADUCONVERSION OF EXISTING GARAGE AND ADDITION INTO TWO ADUs for Multifam90047$65,000
Oct 1, 2024ADUConvert (E) one-story, three-car garage to Accessory Dwelling Unit per90044$80,000
Sep 25, 2024ADUPROPOSED NEW ONE STORY ADU AT REAR OF LOT (1,200 SF max per Ordinance90047$80,000
Sep 17, 2024ADUPROPOSED NEW 2 ADUS PER CA Govt90003$100,000
Sep 11, 2024ADUConvert existing atached 4 car garrage into an accessory dwelling uni90007$50,000
Aug 19, 2024ADUNEW 34'X34' ONE STORY ADU AT REAR OF THE PROPERTY (1,200 SF max per Or90061$140,000
Jun 24, 2024ADUTwo new 1-story accessory dwelling units per gcs 6585290044$200,000
Dec 30, 2023AdditionConversion of existing sfd w/ att garage to sfd & attached adu per lam90037$67,541
Dec 30, 2023ADUConversion of existing sfd w/ att garage to sfd & attached adu per lam90037$67,541
Nov 27, 2023Reroof, 18 squares (1,800 sq ft)Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq90272$28,600
Nov 26, 2023ADUEXISTING DETACHED GARAGE CONVERSION TO 645 SF ADU PER GCS 65852.2(e)(190062$65,000
Nov 7, 2023AdditionConvert (E) detached one-car garage (12' x 16') to Accessory Dwelling90003$60,000
Nov 7, 2023ADUConvert (E) detached one-car garage (12' x 16') to Accessory Dwelling90003$60,000
Oct 4, 2023ADUNew construction of two detached Accessory Dwelling Units per CA Govt90011$150,000

What to ask before you hire

About Jerahian Araz

  • Do not hire until the contractor shows you an active license.
  • Ask what the warranty covers and for how long, in writing.

Worth asking any ADU builder

  • Can you show me proof of liability insurance and your bond?
  • Do you handle the plans, engineering and utility hookups, or do I?
  • How long from permit to the final inspection on your last three ADUs?
  • What is the payment schedule, and what is extra?

Get a quote from Jerahian Araz

Five quick questions. We pass your request to Jerahian Araz.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Jerahian Araz. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More ADU builders near 90003 and 90037

See all 271 ADU builders in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.