contractors.fyi
Sign in

No Limit Construction Corp

ADU builder based in Van Nuys. Licensed since 2021.

  • License active
  • No workers' comp: the business told the state it has no employees

10 jobs on Los Angeles permits, 2023 to 2026: 3 ADUs, 2 home additions, 2 remodels, 2 roofing jobs, 1 pool or spa. 236th most ADU permits of 271 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1082982, active in the state's records on Sep 23, 2026General buildingNo complaints or citations on the board's public record.Checks out
Workers' comp?No workers' comp: the business told the state it has no employeesThis covers their crew if someone is hurt. It is not insurance for your home.Ask them
In business?Licensed since 2021
Jobs on record10 jobs on Los Angeles permits, 2023 to 2026: 3 ADUs, 2 home additions, 2 remodels, 2 roofing jobs, 1 pool or spaThey are based in Van Nuys. Work outside Los Angeles is not in these records.236th most ADU permits of 271 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover September 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1082982 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $80,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What ADU jobs cost in Los Angeles.

Get 2 or 3 written quotes.

Permit timeline

Across Los Angeles, a ADU permit stays open about about 12 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about about 4 months. How long ADU jobs take.

Track record

5 jobs in the last 12 months, up from 3 the year before

Q4 2023: 2 jobsQ1 2025: 1 jobQ3 2025: 2 jobsQ4 2025: 1 jobQ1 2026: 3 jobsQ3 2026: 1 jobBusiest: 3 jobs202420252026
Each bar is 3 months of permits. The tallest is 3 jobs, January to March 2026. Across Los Angeles, all contractors together had 1% more ADU jobs in the last 12 months than in the 12 months before.

Where they work most

  • 913453 jobs
  • 913432 jobs
  • 916052 jobs
  • 913061 job
  • 916011 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 2, 2026AdditionRemodel to (e) sfd and convert (e) attached garage into a junior acces91343$200,000
Mar 3, 2026ADUNEW DETACHED ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(b)(1),(c),(d)91345$160,000
Feb 14, 2026Pool or spaNew 28' x 21'-1" swimming pool with 9' x 9' spa per standard plan #26891605$35,000
Jan 16, 2026AdditionConvert detached garage and addition to new two stories 31' 6" x 22' A91306$120,000
Oct 29, 2025RemodelREMODEL TO (E) SFD AND CONVERT (E) ATTACHED GARAGE INTO A JUNIOR ACCESSORY DWELLING TO COMPLY WITH…91343$200,000
Aug 11, 2025Reroof, 25 squares (2,500 sq ft)Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq91345$5,000
Jul 8, 2025ADU(n) 25' x 31' one story accessory dwelling unit per gcs 65852.291345$52,500
Mar 24, 2025Reroof, 20 squares (2,000 sq ft)Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq91601$4,000
Dec 6, 2023ADUNew 1 story detached accessory dwelling unit (25' x 25') per wfpp91605$80,000
Nov 14, 2023RemodelFire damage repair and remodel to (e) s.f.d90047$40,000

What to ask before you hire

About No Limit Construction Corp

  • Ask who will do the work. Anyone they pay to work on your home must be covered by workers' comp.
  • Ask what the warranty covers and for how long, in writing.

Worth asking any ADU builder

  • Can you show me proof of liability insurance and your bond?
  • Do you handle the plans, engineering and utility hookups, or do I?
  • How long from permit to the final inspection on your last three ADUs?
  • What is the payment schedule, and what is extra?

Get a quote from No Limit Construction Corp

Five quick questions. We pass your request to No Limit Construction Corp.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to No Limit Construction Corp. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More ADU builders near 91345 and 91343

See all 271 ADU builders in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.