contractors.fyi
Sign in

Sharp Builders & Son

Roofing contractor based in Porter Ranch.

  • License 1058253 was not in the state's records on Sep 23, 2026

8 jobs on Los Angeles permits, 2023 to 2025: 3 roofing jobs, 2 remodels, 1 seismic retrofit, 1 home addition, 1 ADU.

We could not find an active or renewable license for this business in the state's records on Sep 23, 2026. Check the license with the state before you hire.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1058253 was not in the state's records on Sep 23, 2026Problem
Jobs on record8 jobs on Los Angeles permits, 2023 to 2025: 3 roofing jobs, 2 remodels, 1 seismic retrofit, 1 home addition, 1 ADUThey are based in Porter Ranch. Work outside Los Angeles is not in these records.Our Los Angeles permit records cover June 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

Cost and timing

Price

About $36,417 for a full shingle roof replacement in Los Angeles

How we got it: The Remodeling 2025 Cost vs. Value Report (www.costvsvalue.com) estimates $36,417 for a standard 30-square (3,000 sq ft) asphalt shingle roof with two skylights. It is an estimate for one standard job, not a price anyone paid.

The permit form shows a lower figure: $10,000 on their typical permit ($5,600 on the typical Los Angeles roofing permit). The form records a job value for the permit fee, which is usually well below the contract price for every roofer, so it is not a price.

Get 2 or 3 written quotes. What roofing jobs cost in Los Angeles.

Permit timeline

Across Los Angeles, a roofing permit stays open about 26 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long roofing jobs take.

Track record

0 jobs in the last 12 months, down from 6 the year before

Q4 2023: 1 jobQ3 2024: 1 jobQ1 2025: 3 jobsQ2 2025: 2 jobsQ3 2025: 1 jobBusiest: 3 jobs20242025
Each bar is 3 months of permits. The tallest is 3 jobs, January to March 2025.

Where they work most

  • 900262 jobs
  • 900342 jobs
  • 900491 job
  • 916061 job
  • 913431 job

Jobs by kind of work

Latest jobs

DateWorkZIP
Jul 17, 2025Seismic retrofitSoft-Story seismic retrofit per LABC Chapter 93: Verify proposed worked done under ADU conversion…90049
May 30, 2025Reroof, 5 squares (500 sq ft)Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq90026
May 22, 2025RemodelKitchen/bathroom (1 ) remodel for residential buildings (no structural changes)91606
Mar 4, 2025AdditionAddition and converting (e) 4-attached garages to one adu in existing90034
Mar 4, 2025ADUAddition and converting (e) 4-attached garages to one adu in existing90034
Mar 3, 2025RemodelAddition and interior remodel to (e) sfd w/ attahced garage91343
Aug 29, 2024ReroofRe-roof with Class A or B roof covering material weighing less than 6 pounds per sq91356
Dec 1, 2023Reroof, 15 squares (1,500 sq ft)Re-roof with Class A or B material weighing less than 6 pounds per sq90026

What to ask before you hire

About Sharp Builders & Son

  • Do not hire until the contractor shows you an active license.
  • Ask what the warranty covers and for how long, in writing.

Worth asking any roofing contractor

  • Can you show me proof of liability insurance and your bond?
  • Will you tear off the old roof or lay the new one over it?
  • What do you charge to replace rotted roof boards, per sheet, if you find any?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Sharp Builders & Son

Five quick questions. We pass your request to Sharp Builders & Son.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Sharp Builders & Son. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More roofing contractors near 90026 and 90034

See all 1,313 roofing contractors in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.