contractors.fyi
Sign in

Smart Eye Construction Corp

ADU builder based in Inglewood. Licensed since 2021.

  • License active
  • Workers' comp on file

7 jobs on Los Angeles permits, 2024 to 2026: 3 ADUs, 2 remodels, 1 roofing job, 1 home addition. 257th most ADU permits of 271 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1077004, active in the state's records on Sep 23, 2026General buildingNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2021
Jobs on record7 jobs on Los Angeles permits, 2024 to 2026: 3 ADUs, 2 remodels, 1 roofing job, 1 home additionThey are based in Inglewood. Work outside Los Angeles is not in these records.257th most ADU permits of 271 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover September 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1077004 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $60,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What ADU jobs cost in Los Angeles.

Get 2 or 3 written quotes.

Permit timeline

Across Los Angeles, a ADU permit stays open about about 12 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about about 4 months. How long ADU jobs take.

Track record

4 jobs in the last 12 months, up from 2 the year before

Q3 2024: 1 jobQ2 2025: 2 jobsQ4 2025: 1 jobQ1 2026: 1 jobQ3 2026: 2 jobsBusiest: 2 jobsBusiest: 2 jobs20252026
Each bar is 3 months of permits. The tallest is 2 jobs, April to June 2025. Across Los Angeles, all contractors together had 1% more ADU jobs in the last 12 months than in the 12 months before.

Where they work most

  • 900262 jobs
  • 900452 jobs
  • 900161 job
  • 900681 job
  • 900481 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 17, 2026Reroof, 26 squares (2,600 sq ft)Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq90016$5,200
Sep 9, 2026AdditionConvert (e) dettached garage with addition to accessory dwell90068$50,298
Jan 30, 2026ADUNEW DETACHED ADU PER CA GOVT. CODE 65852.2(e)(1)(B) AND APPLIC90026$70,000
Dec 18, 2025ADUConvert existing garage into (n) accessory dwelling unit per gcs 6585290026$60,000
Apr 2, 2025RemodelNo details on the permit90045$130,000
Apr 2, 2025Remodel4-Kitchen/4-bathroom remodel for residential buildings (no structural changes) 4-door change-out…90045$200,000
Sep 17, 2024ADUConvert (E) permitted garage and pool cabana into an ADU per CA GCS 6590048$30,000

What to ask before you hire

About Smart Eye Construction Corp

  • Ask what the warranty covers and for how long, in writing.

Worth asking any ADU builder

  • Can you show me proof of liability insurance and your bond?
  • Do you handle the plans, engineering and utility hookups, or do I?
  • How long from permit to the final inspection on your last three ADUs?
  • What is the payment schedule, and what is extra?

Get a quote from Smart Eye Construction Corp

Five quick questions. We pass your request to Smart Eye Construction Corp.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Smart Eye Construction Corp. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More ADU builders near 90026 and 90045

See all 271 ADU builders in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.