contractors.fyi
Sign in

Summit Remodeling Group Inc

Roofing contractor based in Los Angeles. Licensed since 2023.

  • License active
  • No workers' comp: the business told the state it has no employees

32 jobs on Los Angeles permits, 2024 to 2026: 20 roofing jobs, 10 remodels, 1 home addition, 1 ADU. 381st most roofing permits of 1,313 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1107646, active in the state's records on Sep 23, 2026General buildingNo complaints or citations on the board's public record.Checks out
Workers' comp?No workers' comp: the business told the state it has no employeesThis covers their crew if someone is hurt. It is not insurance for your home.Ask them
In business?Licensed since 2023
Jobs on record32 jobs on Los Angeles permits, 2024 to 2026: 20 roofing jobs, 10 remodels, 1 home addition, 1 ADU381st most roofing permits of 1,313 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover June 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1107646 on CSLB

Cost and timing

Price

About $29,000 for a full roof their typical size (24 squares, 2,400 sq ft)

How we got it: The Remodeling 2025 Cost vs. Value Report (www.costvsvalue.com) estimates $36,417 for a standard 30-square (3,000 sq ft) asphalt shingle roof with two skylights. It is an estimate for one standard job, not a price anyone paid. We scaled it to their typical roof.

The permit form shows a lower figure: $6,200 on their typical permit ($5,600 on the typical Los Angeles roofing permit). The form records a job value for the permit fee, which is usually well below the contract price for every roofer, so it is not a price.

Get 2 or 3 written quotes. What roofing jobs cost in Los Angeles.

Permit timeline

Across Los Angeles, a roofing permit stays open about 26 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long roofing jobs take.

Track record

7 jobs in the last 12 months, down from 15 the year before

Q1 2024: 3 jobsQ2 2024: 4 jobsQ3 2024: 4 jobsQ4 2024: 5 jobsQ1 2025: 2 jobsQ2 2025: 4 jobsQ3 2025: 3 jobsQ4 2025: 4 jobsQ1 2026: 1 jobQ2 2026: 1 jobQ3 2026: 1 jobBusiest: 5 jobsLatest: 1 job202420252026
Each bar is 3 months of permits. The tallest is 5 jobs, October to December 2024.

Where they work most

  • 900436 jobs
  • 900663 jobs
  • 914052 jobs
  • 900192 jobs
  • 900422 jobs

Jobs by kind of work

Latest jobs

DateWorkZIP
Aug 10, 2026RemodelRemodel to (e) sfd which includes a new bathroom, kitchen and bedroom remodel, and new windows per…91405
May 13, 2026AdditionConvert and add to (e) 2-car garage to create a.d.u90043
Jan 5, 2026RemodelRemove (e) enclosed patio and create new addition, same size same location for new bedroom and…90019
Dec 23, 2025ADUNew (37'-6" x 31' Irregular Shape) 2-story (2) Accessory Dwelling Uni90018
Nov 26, 2025Reroof, 9 squares (900 sq ft)90019
Oct 24, 2025Reroof, 34 squares (3,400 sq ft)91307
Oct 23, 2025RemodelBathroom (1) remodel for residential buildings (no structural changes)90046
Aug 25, 2025RemodelProposed remodel to convert (e) 3/4 bathroom to 3/4 bathroom and 1/2 bathroom90066
Jul 23, 2025Reroof, 25 squares (2,500 sq ft)90066
Jul 23, 2025Remodel, 25 squares (2,500 sq ft)90066
Jun 13, 2025RemodelInterior remodel: non structural revise insulation, dry wall90043
May 29, 2025Reroof, 34 squares (3,400 sq ft)91403
May 5, 2025Remodel1 bathroom(s).Bathroom remodel for residential buildings (no structural changes)90043
Apr 24, 2025Remodel8 window(s). Window and door change-out (same size & type) for residential buildings90043
Mar 11, 2025Reroof, 16 squares (1,600 sq ft)Re-roof with Class A or B material weighing less than 6 pounds per sq90028
Feb 24, 2025Reroof90025
Nov 22, 2024Reroof, 21 squares (2,100 sq ft)91405
Nov 17, 2024Reroof, 25 squares (2,500 sq ft)90011
Oct 30, 2024Reroof, 15 squares (1,500 sq ft)90043
Oct 30, 2024Reroof, 3 squares (300 sq ft)90043
Oct 15, 2024Reroof, 16 squares (1,600 sq ft)90042
Sep 23, 2024Reroof, 21 squares (2,100 sq ft)90029
Aug 29, 2024Reroof, 32 squares (3,200 sq ft)90272
Aug 22, 2024Reroof, 31 squares (3,100 sq ft)90272
Jul 1, 2024Remodel1 bathroom(s).Bathroom remodel for residential buildings (no structural changes)90042
Jun 26, 2024Reroof, 24 squares (2,400 sq ft)90057
Jun 14, 2024Reroof"COMPLY WITH DEPARTMENT ORDER effective date07/01/2021. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE…90068
Jun 9, 2024Reroof, 5 squares (500 sq ft)90047
Apr 16, 2024RemodelInterior kitchen remodel/repair (no changes in walls or openings)90710
Mar 11, 2024Reroof, 34 squares (3,400 sq ft)90710
Feb 28, 2024Reroof, 32 squares (3,200 sq ft)90036
Feb 21, 2024Reroof, 17 squares (1,700 sq ft)90247

What to ask before you hire

About Summit Remodeling Group Inc

  • Ask who will do the work. Anyone they pay to work on your home must be covered by workers' comp.
  • Ask what the warranty covers and for how long, in writing.

Worth asking any roofing contractor

  • Can you show me proof of liability insurance and your bond?
  • Will you tear off the old roof or lay the new one over it?
  • What do you charge to replace rotted roof boards, per sheet, if you find any?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Summit Remodeling Group Inc

Five quick questions. We pass your request to Summit Remodeling Group Inc.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Summit Remodeling Group Inc. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More roofing contractors near 90043 and 90066

See all 1,313 roofing contractors in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.