contractors.fyi
Sign in

All Star Electrical Services LLC

Panel upgrade electrician working in Philadelphia.

  • License active

34 jobs on Philadelphia permits, 2021 to 2026: 32 panel upgrades, 2 EV charger installations. 33rd most panel upgrade permits of 126 contractors in Philadelphia.

What the public records show

From the city's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 46503, active in the city's records on Sep 24, 2026ContractorChecks out
Jobs on record34 jobs on Philadelphia permits, 2021 to 2026: 32 panel upgrades, 2 EV charger installations33rd most panel upgrade permits of 126 licensed contractors in Philadelphia. That counts jobs, not quality.Our Philadelphia permit records cover September 2021 to September 2026.

Records: the city Department of Licenses and Inspections and City of Philadelphia permits.

Cost and timing

Permit timeline

Across Philadelphia, a panel upgrade permit stays open about about 3 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

9 jobs in the last 12 months, up from 7 the year before

Q4 2021: 1 jobQ2 2022: 4 jobsQ4 2022: 1 jobQ1 2023: 3 jobsQ2 2023: 1 jobQ3 2023: 1 jobQ4 2023: 1 jobQ1 2024: 2 jobsQ2 2024: 2 jobsQ3 2024: 2 jobsQ4 2024: 5 jobsQ1 2025: 1 jobQ3 2025: 1 jobQ4 2025: 2 jobsQ1 2026: 1 jobQ2 2026: 3 jobsQ3 2026: 3 jobsBusiest: 5 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 5 jobs, October to December 2024. Across Philadelphia, all contractors together had 0% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 191474 jobs
  • 191433 jobs
  • 191252 jobs
  • 191492 jobs
  • 191352 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Aug 7, 2026Panel upgrade200 amp panel only replacement19125not stated
Jul 27, 2026Panel upgradeUpgrade to 100 amp electrical service and the main circuit breaker panel with proper grounding and…19132not stated
Jul 14, 2026Panel upgrade200 amp panel only replacement19125not stated
Jun 22, 2026EV chargerNo details on the permit19147not stated
Jun 16, 2026Panel upgradeInstall 200 amp electrical service and the main circuit breaker panel with proper grounding and…19149not stated
May 15, 2026Panel upgradeInstall 200 amp service riser with 2 gang meter base, disconnect, and 2 - 100 amp panels19135not stated
Feb 12, 2026Panel upgrade200 amp service upgrade19118not stated
Dec 22, 2025EV chargerInstallation of an EVC System to a single family or two-family dwelling with existing onsite parking19131not stated
Oct 24, 2025Panel upgradeInstall 200 amp electrical service, meter socket and main circuit breaker panel with proper…19143not stated
Jul 8, 2025Panel upgrade200 amp service upgrade19129not stated
Jan 17, 2025Panel upgradePartial rewire to include the following areas only : 2nd floor all 3 bedrooms ,bathroom and hall…19150not stated
Dec 27, 2024Panel upgradeInstall 200 amp electrical service and 3 meter packs with proper grounding and bonding19143not stated
Dec 19, 2024Panel upgrade100 amp complete service upgrade to include outside service, main panel and grounding system19153not stated
Dec 10, 2024Panel upgradeComplete 200 amp service upgrade with main panel, outside service and grounding system19111not stated
Dec 10, 2024Panel upgrade100 amp complete service, new panel ,outside cable , meter base and full grounding system19134not stated
Oct 11, 2024Panel upgradeInstall 200 amp main panel,meter socket ,grounding package and gfci outlet next to the panel19103not stated
Jul 29, 2024Panel upgradeComplete 200amp service upgrade19145not stated
Jul 22, 2024Panel upgradeComplete 200 amp service upgrade19129not stated
Jun 26, 2024Panel upgrade200 amp riser, 2 gang meter base 100 amp for each position, 2 - 100 amp main breaker panels,…19152not stated
Apr 10, 2024Panel upgrade200 amp overhead outside service with new 200 amp main breaker panel, complete grounding package…19128not stated
Feb 13, 2024Panel upgradeComplete 200 amp service replacement to include outside cable, meter , main 200 amp panel and…19119not stated
Feb 5, 2024Panel upgradeInstall 200 amp overhead service with new riser, meter ,panel and grounding, also add 2 new lines…19104not stated
Oct 2, 2023Panel upgrade100 amp complete service upgrade with 30 space panel and complete grounding system. AS PER NEC 201719138not stated
Sep 10, 2023Panel upgradeInstall 3 gang meter base and replace 3 100 amp panels AS PER NEC 201719111not stated
Jun 12, 2023Panel upgrade100 amp complete service upgrade with grounding system19149not stated
Mar 29, 2023Panel upgrade100 amp panel replacement and grounding package as per 2017 Nec19135not stated
Mar 20, 2023Panel upgrade200 amp complete service upgrade as per 2017 Nec19147not stated
Mar 20, 2023Panel upgrade200 amp complete service upgrade as per 2017 Nec19147not stated
Dec 29, 2022Panel upgrade200 amp complete service upgrade as per 2017 NEC19147not stated
Jun 21, 2022Panel upgrade200 amp complete service upgrade, as per 2014 NEC19124not stated
Jun 5, 2022Panel upgradeReplace 100 amp panel and install grounding19148not stated
May 24, 2022Panel upgrade100 amp complete service , 30 space panel , outside service, complete grounding as per 2014 Nec19140not stated
Apr 5, 2022Panel upgrade200 amp complete service upgrade, 40 space 200 amp main breaker panel with grounding package us per…19128not stated
Nov 17, 2021Panel upgrade200 amp complete service upgrade19143not stated

What to ask before you hire

About All Star Electrical Services LLC

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from All Star Electrical Services LLC

Five quick questions. We pass your request to All Star Electrical Services LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to All Star Electrical Services LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 19147 and 19143

See all 126 panel upgrade electricians in Philadelphia, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.