contractors.fyi
Sign in

Astrit Miraka

Panel upgrade electrician working in Philadelphia.

  • License 058773, inactive in the city's records on Sep 24, 2026

89 panel upgrade jobs on Philadelphia permits, 2021 to 2026.

The state showed this license as "inactive" on Sep 24, 2026. Do not hire until that is cleared.

What the public records show

From the city's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 058773, inactive in the city's records on Sep 24, 2026ContractorProblem
Jobs on record89 panel upgrade jobs on Philadelphia permits, 2021 to 2026Every permit we have for them is panel upgrade.Our Philadelphia permit records cover September 2021 to September 2026.

Records: the city Department of Licenses and Inspections and City of Philadelphia permits.

Cost and timing

Permit timeline

Across Philadelphia, a panel upgrade permit stays open about about 3 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

12 jobs in the last 12 months, up from 8 the year before

Q4 2021: 8 jobsQ1 2022: 7 jobsQ2 2022: 3 jobsQ3 2022: 7 jobsQ4 2022: 2 jobsQ1 2023: 9 jobsQ2 2023: 2 jobsQ3 2023: 10 jobsQ4 2023: 6 jobsQ1 2024: 8 jobsQ2 2024: 3 jobsQ3 2024: 4 jobsQ1 2025: 5 jobsQ3 2025: 4 jobsQ4 2025: 3 jobsQ1 2026: 2 jobsQ2 2026: 1 jobQ3 2026: 5 jobsBusiest: 10 jobsLatest: 5 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 10 jobs, July to September 2023. Across Philadelphia, all contractors together had 0% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 191206 jobs
  • 191246 jobs
  • 191396 jobs
  • 191436 jobs
  • 191465 jobs

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 17, 2026Panel upgradeResidential Service Equipment not exceeding a rating of 200 amps WITH NO INCREASE IN SERVICE SIZE…19120not stated
Sep 16, 2026Panel upgradeNo Upgrade on the service amps Replace existing service including 100 amp service cable from…19136not stated
Sep 2, 2026Panel upgradeWiring for a new pool Supply and install new sup panel 50 amp for the pool equipment Run 50 amp…19128not stated
Aug 3, 2026Panel upgradeReplace 200 amp electrical service and main circuit breaker panel with proper grounding and bonding19146not stated
Jul 9, 2026Panel upgrade19146not stated
May 20, 2026Panel upgradePermits and inspections with the city Replace 100 amp service including 100 amp service cable…19138not stated
Mar 10, 2026Panel upgradeInstall 200 amp electrical service, meter socket and main circuit breaker panel with proper…19128not stated
Jan 6, 2026Panel upgrade19120not stated
Dec 16, 2025Panel upgrade19124not stated
Dec 12, 2025Panel upgrade19149not stated
Nov 4, 2025Panel upgradeReplace the existing 200 amp underground service Including 200 amp meter socket 200 amp service…19139not stated
Sep 29, 2025Panel upgradePermits and inspection Replace 200 amp electrical panel and breakers Replace electrical jumper19115not stated
Aug 1, 2025Panel upgrade19147not stated
Jul 16, 2025Panel upgradePermits and inspection with the city Replace 100 amp service cable Replace 100 amp meter socket…19139not stated
Jul 16, 2025Panel upgradePermits and inspection with the city Replace 100 amp service cable Replace 100 amp meter socket…19126not stated
Feb 12, 2025Panel upgrade19120not stated
Feb 12, 2025Panel upgradeReplace outside parts of the service including: 100 amp service cable 100 amp meter socket…19130not stated
Feb 3, 2025Panel upgradeWire the hot tub as per code including: 50 amp GFCI protected disconnect 50 amp line from panel to…19148not stated
Jan 28, 2025Panel upgrade19134not stated
Jan 7, 2025Panel upgradeReplace 100 amp service cable to meter sockets19143not stated
Sep 16, 2024Panel upgradePermits and inspection fees with the city of Philadelphia Install 200 amp service including: 200…19148not stated
Aug 9, 2024Panel upgradePermits and inspection Replace outside parts of the service including : 100 amp service cable…19134not stated
Aug 8, 2024Panel upgradeInstall 200 amp electrical service, meter socket and circuit breaker panel with proper grounding…19144not stated
Aug 8, 2024Panel upgradePermit and Inspection Replace the service entrance cable 200 amp from peco lines to the meter…19136not stated
May 13, 2024Panel upgradeReplace 100 amp service cable from PECO lines to the meter socket Relocate the meter socket…19146not stated
May 3, 2024Panel upgradeInstall new 30 amp branch circuit with gfci protection to subpanel for swimming pool19114not stated
Apr 15, 2024Panel upgradeWire the duplex building as per 2017 code Install 2 gang meter socket 100 amp each position…19143not stated
Mar 25, 2024Panel upgradeInstall 200 amp electrical service, with proper grounding and circuit breaker panel according to…19122not stated
Mar 23, 2024Panel upgradeReplace 100 amp service cable and meter socket according to the 2017 nec19132not stated
Mar 21, 2024Panel upgradeInstall 100 amp electrical service with proper grounding, meter socket and circuit breaker panel…19124not stated
Feb 17, 2024Panel upgradeReplace existing 200 amp service including 200 amp underground meter socket 200 amp 40 circuit…19118not stated
Feb 8, 2024Panel upgrade19124not stated
Feb 8, 2024Panel upgradeReplace 100 amp main electrical service including: 100 amp service cable 100 amp meter socket…19128not stated
Feb 2, 2024Panel upgradeReplace the service outside and inside Service cable from peco line to the meter socket 100 amp…19135not stated
Jan 22, 2024Panel upgradeReplace outside parts of the service including: 100 amp service cable 100 amp meter socket…19145not stated
Dec 29, 2023Panel upgradeUpgrade the electrical service including : 100 amp service cable 100 amp meter socket 100 amp 20…19120not stated
Dec 14, 2023Panel upgradeInstall 200 amp service cable from peco to the meter socket Install 200 amp meter socket Install…19135not stated
Nov 21, 2023Panel upgrade19115not stated
Nov 1, 2023Panel upgradeReplace he electric panel 100 amp , Replace the 100 amp service cable from the meter socket to…19116not stated
Oct 30, 2023Panel upgradeUpgrade the main electrical service as per code 200 amp service cable 200 amp meter socket 200…19103not stated

What to ask before you hire

About Astrit Miraka

  • Do not hire until the state shows the license as active.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Astrit Miraka

Five quick questions. We pass your request to Astrit Miraka.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Astrit Miraka. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 19120 and 19124

See all 126 panel upgrade electricians in Philadelphia, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.