contractors.fyi
Sign in

Cardell Stevenson Jr

Panel upgrade electrician working in Philadelphia.

  • License 051336, inactive in the city's records on Sep 24, 2026

18 jobs on Philadelphia permits, 2022 to 2026: 14 panel upgrades, 3 EV charger installations, 1 home addition.

The state showed this license as "inactive" on Sep 24, 2026. Do not hire until that is cleared.

What the public records show

From the city's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 051336, inactive in the city's records on Sep 24, 2026ContractorProblem
Jobs on record18 jobs on Philadelphia permits, 2022 to 2026: 14 panel upgrades, 3 EV charger installations, 1 home additionOur Philadelphia permit records cover September 2021 to September 2026.

Records: the city Department of Licenses and Inspections and City of Philadelphia permits.

Cost and timing

Permit timeline

Across Philadelphia, a panel upgrade permit stays open about about 3 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

7 jobs in the last 12 months, about the same as 7 the year before

Q3 2022: 1 jobQ4 2023: 1 jobQ1 2024: 1 jobQ2 2024: 1 jobQ4 2024: 2 jobsQ2 2025: 5 jobsQ4 2025: 2 jobsQ1 2026: 1 jobQ2 2026: 4 jobsBusiest: 5 jobs2023202420252026
Each bar is 3 months of permits. The tallest is 5 jobs, April to June 2025. Across Philadelphia, all contractors together had 0% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 191442 jobs
  • 191152 jobs
  • 191192 jobs
  • 191432 jobs
  • 191222 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jun 17, 2026Panel upgradeAMEND 09-01-2026 Total re-wire & panel change19121not stated
Jun 5, 2026Panel upgradeInstall a new 60A standard circuit breaker inside of the 200A main panel inside of the garage . The…19128not stated
Jun 5, 2026Panel upgradeInstall a new 60A Standard circuit breaker in your 200A interior garage panel using the available…19144not stated
Jun 5, 2026EV chargerInstall a new 60A Standard circuit breaker in your 200A interior garage panel using the available…19144not stated
Mar 30, 2026Panel upgradeNew 200 AMP service19142not stated
Oct 20, 2025Panel upgradeInstall a new 60A, 240V circuit in the existing 100A main panel, utilizing an available breaker slot19115not stated
Oct 20, 2025EV chargerInstall a new 60A, 240V circuit in the existing 100A main panel, utilizing an available breaker slot19115not stated
Jun 10, 2025Panel upgrade* The station will be installed in the rear of the property, in the property's driveway * Install…19119not stated
Jun 10, 2025EV charger* The station will be installed in the rear of the property, in the property's driveway * Install…19119not stated
May 22, 2025Panel upgradeInstall 200A service wire & 200A panel, rewire entire dwelling, switches, and receptacles19143not stated
May 20, 2025AdditionInterior renovation of an existing three story attached structure to create a two family dwelling…19122not stated
Apr 23, 2025Panel upgrade* Install new 200amp complete service* * 200amp Service Line * 200amp Meter Socket. * 200amp 40…19140not stated
Nov 27, 2024Panel upgrade* Install new 200amp service line * Install new 200amp meter socket * Install new 200amp main…19151not stated
Oct 7, 2024Panel upgradeInstall new 100amp service line & 100amp meter socket only19122not stated
Apr 19, 2024Panel upgrade200amp Panel Only add additional grounding rod19146not stated
Mar 26, 2024Panel upgradeInstall circuit breaker panel with proper grounding19134not stated
Dec 14, 2023Panel upgradeInstall 200A service wire & 200A panel, rewire entire dwelling, switches, and receptacles19143not stated
Jul 26, 2022Panel upgradeInstall 200amp System, * New 200amp service line * New 200amp meter socket 4awg wire for the…19140not stated

What to ask before you hire

About Cardell Stevenson Jr

  • Do not hire until the state shows the license as active.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Cardell Stevenson Jr

Five quick questions. We pass your request to Cardell Stevenson Jr.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Cardell Stevenson Jr. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 19144 and 19115

See all 126 panel upgrade electricians in Philadelphia, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.