contractors.fyi
Sign in

Carlos A Nunez

Panel upgrade electrician working in Philadelphia.

  • Philadelphia publishes no contractor license list we can check

22 panel upgrade jobs on Philadelphia permits, 2022 to 2026.

What the public records show

From the city's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Philadelphia publishes no contractor license list we can checkThat says nothing about this business either way.Ask them
Jobs on record22 panel upgrade jobs on Philadelphia permits, 2022 to 2026Every permit we have for them is panel upgrade.Our Philadelphia permit records cover September 2021 to September 2026.

Records: the city Department of Licenses and Inspections and City of Philadelphia permits.

Cost and timing

Permit timeline

Across Philadelphia, a panel upgrade permit stays open about about 3 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

6 jobs in the last 12 months, up from 3 the year before

Q1 2022: 1 jobQ4 2022: 1 jobQ1 2023: 1 jobQ3 2023: 4 jobsQ4 2023: 4 jobsQ1 2024: 1 jobQ3 2024: 1 jobQ4 2024: 1 jobQ2 2025: 1 jobQ3 2025: 1 jobQ1 2026: 4 jobsQ2 2026: 2 jobsBusiest: 4 jobsBusiest: 4 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 4 jobs, July to September 2023. Across Philadelphia, all contractors together had 0% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 191258 jobs
  • 191463 jobs
  • 191211 job
  • 191241 job
  • 191401 job

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Apr 29, 2026Panel upgradeReplaced Existing 100 Amp service with a 200 Amp service 40 Circuit19121not stated
Apr 7, 2026Panel upgradeInstall 200 amp service 40 circuit panel only19124not stated
Mar 19, 2026Panel upgradeInstall a 200 amp service 40 circuit panel according 2017 NEC19140not stated
Mar 19, 2026Panel upgradeInstall a 200 amp service with existing sub panel According to NEC 201719143not stated
Mar 16, 2026Panel upgradeInstall 100 amp service with a 30 circuit panel according to NEC 201719120not stated
Jan 7, 2026Panel upgradeReplace Existing 2 Gang meter pack and service Wire only19138not stated
Sep 8, 2025Panel upgradeComplete rewire with 100 amp service to current nec code19125not stated
Jun 20, 2025Panel upgrade19125not stated
Oct 4, 2024Panel upgradeComplete rewire, receptacles, switches, lights, Smoke and carbon monoxide detectors, install 100…19134not stated
Aug 23, 2024Panel upgradeTotal rewired19114not stated
Mar 14, 2024Panel upgrade19125not stated
Dec 20, 2023Panel upgrade19123not stated
Dec 16, 2023Panel upgradeComplete rewiring19146not stated
Dec 7, 2023Panel upgradeComplete rewired19125not stated
Oct 11, 2023Panel upgradeTotal rewired according to NEC 2017, install 200 amp service 40 circuit panel19146not stated
Aug 15, 2023Panel upgradeInstall 200 amp service, 40 circuit panel19125not stated
Aug 15, 2023Panel upgradeInstall 200 amp service with 40 circuit panel19125not stated
Aug 15, 2023Panel upgradeTotal Rewire19125not stated
Aug 15, 2023Panel upgradeComplete Rewired19125not stated
Mar 13, 2023Panel upgradeInstall a 200 amp service19146not stated
Dec 8, 2022Panel upgradeInstall New 100 Amp service According to NEC201719139not stated
Mar 16, 2022Panel upgradeTOTAL REWIRE ACCORDING TO NEC 2014 install 200amp Service19137not stated

What to ask before you hire

About Carlos A Nunez

  • Ask for their license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Carlos A Nunez

Five quick questions. We pass your request to Carlos A Nunez.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Carlos A Nunez. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 19125 and 19146

See all 126 panel upgrade electricians in Philadelphia, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.