contractors.fyi
Sign in

Charles Wright

Panel upgrade electrician working in Philadelphia.

  • Philadelphia publishes no contractor license list we can check

51 jobs on Philadelphia permits, 2021 to 2026: 48 panel upgrades, 2 solar installations, 1 EV charger installation.

What the public records show

From the city's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Philadelphia publishes no contractor license list we can checkThat says nothing about this business either way.Ask them
Jobs on record51 jobs on Philadelphia permits, 2021 to 2026: 48 panel upgrades, 2 solar installations, 1 EV charger installationOur Philadelphia permit records cover September 2021 to September 2026.

Records: the city Department of Licenses and Inspections and City of Philadelphia permits.

Cost and timing

Permit timeline

Across Philadelphia, a panel upgrade permit stays open about about 3 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

19 jobs in the last 12 months, up from 10 the year before

Q4 2021: 4 jobsQ1 2022: 1 jobQ2 2022: 1 jobQ4 2022: 1 jobQ1 2023: 2 jobsQ2 2023: 2 jobsQ3 2023: 6 jobsQ1 2024: 3 jobsQ2 2024: 1 jobQ3 2024: 1 jobQ4 2024: 2 jobsQ1 2025: 3 jobsQ2 2025: 1 jobQ3 2025: 5 jobsQ4 2025: 5 jobsQ1 2026: 4 jobsQ2 2026: 5 jobsQ3 2026: 4 jobsBusiest: 6 jobsLatest: 4 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 6 jobs, July to September 2023. Across Philadelphia, all contractors together had 0% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 191197 jobs
  • 191294 jobs
  • 191254 jobs
  • 191284 jobs
  • 191473 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 16, 2026Panel upgrade19106not stated
Sep 16, 2026Panel upgrade19147not stated
Sep 14, 2026Panel upgrade19129not stated
Aug 8, 2026Panel upgradeRewire bathroom to new layout19148not stated
May 29, 2026Panel upgradeNew 225 amp service with new grounding as per 2017NEC Rewire of entire building, addition, and…19125not stated
May 28, 2026Panel upgrade100 Amp service Replacement19146not stated
May 13, 2026Panel upgradeRewire house to 2017 NEC requirements19145not stated
May 6, 2026Panel upgradeNew 200 amp service with updated grounding and 40 circuit panel19128not stated
Apr 24, 2026Panel upgrade200 amp Service upgrade with new updated grounding and new 40 circuit 200 amp main breaker panel19119not stated
Mar 25, 2026Panel upgrade200 Amp service drop with a two gang 100 amp per position meter socket19151not stated
Mar 24, 2026Panel upgrade100 Amp panel replacement and grounding upgrade19129not stated
Feb 9, 2026Panel upgrade200 amp service upgrade with new 40 circuit panel and new grounding19128not stated
Feb 5, 2026Panel upgrade200 amp service replacement with new exterior wire meter socket and disconnect and grounding19128not stated
Dec 10, 2025Panel upgradeKnob and tube removal and rewire of affected devices19145not stated
Nov 24, 2025Panel upgradeKnob and tube removal and rewire of affected devices19143not stated
Oct 29, 2025Panel upgrade100 amp Service replacement with new exterior line and new 30 circuit 100 amp main breaker panel19151not stated
Oct 15, 2025Panel upgradeKnob and tube removal and rewire of existing devices19128not stated
Oct 15, 2025Panel upgradeKitchen rewire to 2017 NEC requirements and 100 amp service replacement19140not stated
Sep 25, 2025Panel upgradeKitchen remodel rewiring and 100 amp panel replacement to 30 circuit panel19119not stated
Jul 7, 2025Panel upgrade100 Amp service replacement and update of grounding to 2017 NEC19126not stated
Jul 3, 2025Panel upgradeReplace damaged exterior service line and meter socket 100 amps19141not stated
Jul 3, 2025Panel upgrade100 amp service panel replacement19138not stated
Jul 2, 2025Panel upgradeExisting service to remain the same19118not stated
May 15, 2025Panel upgradeKnob and tube removal and rewire of existing devices to 2107 NEC code19129not stated
Mar 24, 2025Panel upgradeKnob and Tube removal and rewire all all affected devices19119not stated
Mar 16, 2025Panel upgradeReplace existing 100 amp service panel with new 100 amp 30 circuit main breaker panel19151not stated
Mar 16, 2025Panel upgrade200 Amp Service upgrade with new 40 circuit panel19130not stated
Dec 3, 2024Panel upgradeInstall 320 amp service with meter socket and prorer grounding and bonding19119not stated
Dec 3, 2024EV chargerInstall 320 amp service with meter socket and prorer grounding and bonding19119not stated
Aug 30, 2024Panel upgradeKitchen and laundry room remodel19118not stated
May 7, 2024Panel upgrade200 Amp service Upgrade. New 200 amp 40 circuit main breaker panel with new exterior meter socket…19147not stated
Mar 12, 2024Panel upgrade200 amp service replacement19146not stated
Feb 12, 2024Panel upgrade200 amp Service upgrade19118not stated
Feb 6, 2024Panel upgradeNew 200 Amp service with 2 100 amp sub panels19143not stated
Sep 29, 2023Panel upgradeDisconnect and remove all remaining knob and tube wiring and rewire affected devices19130not stated
Sep 6, 2023Panel upgrade200 Amp service upgrade with new 40 circuit main breaker panel and updated grounding19125not stated
Aug 22, 2023Panel upgradeRemove all knob and tube and ungrounded wiring throughout house19103not stated
Aug 16, 2023Panel upgradeReplace existing 100 amp service cable, meter socket, and main breaker panel with new equipment19150not stated
Aug 8, 2023Panel upgradeDisconnect and remove all remaining cloth 2 conductor wiring19119not stated
Aug 1, 2023Panel upgrade100 Amp Service replacement19125not stated

What to ask before you hire

About Charles Wright

  • Ask for their license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Charles Wright

Five quick questions. We pass your request to Charles Wright.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Charles Wright. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 19119 and 19129

See all 126 panel upgrade electricians in Philadelphia, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.