contractors.fyi
Sign in

Danny Vo

Panel upgrade electrician working in Philadelphia.

  • License active

21 jobs on Philadelphia permits, 2021 to 2026: 12 panel upgrades, 6 heat pump installations, 3 home additions. 58th most panel upgrade permits of 126 contractors in Philadelphia.

What the public records show

From the city's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 42867, active in the city's records on Sep 24, 2026ContractorChecks out
Jobs on record21 jobs on Philadelphia permits, 2021 to 2026: 12 panel upgrades, 6 heat pump installations, 3 home additions58th most panel upgrade permits of 126 licensed contractors in Philadelphia. That counts jobs, not quality.Our Philadelphia permit records cover September 2021 to September 2026.

Records: the city Department of Licenses and Inspections and City of Philadelphia permits.

Cost and timing

Permit timeline

Across Philadelphia, a panel upgrade permit stays open about about 3 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

3 jobs in the last 12 months, down from 5 the year before

Q3 2021: 2 jobsQ2 2022: 1 jobQ3 2022: 2 jobsQ4 2022: 3 jobsQ1 2023: 2 jobsQ1 2024: 1 jobQ3 2024: 3 jobsQ4 2024: 4 jobsQ4 2025: 1 jobQ2 2026: 1 jobQ3 2026: 1 jobBusiest: 4 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 4 jobs, October to December 2024. Across Philadelphia, all contractors together had 0% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 191456 jobs
  • 191213 jobs
  • 191462 jobs
  • 191282 jobs
  • 191421 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Aug 3, 2026AdditionFor the erection of a rear 2nd story addition to an existing attached single-family structure as…19146not stated
Jun 23, 2026Panel upgradeInstall 200 amp service and meter socket outside as per nec 201719142not stated
Dec 9, 2025Panel upgradeInstall 100 amp service and meter socket rewire throughout with switch, lighting, receptacles,…19121not stated
Dec 18, 2024Heat pumpEZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork,…19140not stated
Nov 25, 2024Panel upgradeInstall and repair one outside light existing panel and existing wire on exterior front door19124not stated
Nov 19, 2024Heat pump19145not stated
Nov 18, 2024Panel upgradeRewire kitchen and bathroom on existing 100 amp panel as per NEC 201719145not stated
Sep 23, 2024Panel upgradeInstall 100 amp service and meter socket rewire throughout with switch, lighting, receptacles,…19121not stated
Sep 16, 2024Panel upgradeInstall new 100 service panel and rewire kitchen and bathroom as per NEC 201719145not stated
Jul 11, 2024Panel upgradeRemove old 100 amp panel & replace with new 100 amp panel with breaker on 1st floor as per nec…19149not stated
Mar 11, 2024Heat pump19146not stated
Feb 17, 2023Heat pumpEZ PERMIT DUCTWORK & WARM-AIR APPLIANCES For the installation of New Ductwork,…19145not stated
Feb 15, 2023AdditionFor the erection of a second floor rear addition to an existing attached single family dwelling19145not stated
Dec 1, 2022Heat pump19126not stated
Oct 20, 2022Panel upgradeInstall 100amp service and meter socket19148not stated
Oct 4, 2022Heat pump19128not stated
Sep 27, 2022Panel upgradeInstall 200amp service and meter socket19128not stated
Jul 11, 2022AdditionFor the erection of a rear addition to an existing attached building19145not stated
May 2, 2022Panel upgradeInstall 100 amp service and meter socket rewire throughout with switch, lighting, receptacles,…19121not stated
Sep 27, 2021Panel upgradeExisting 100 AMP panel rewire throughout with switch lighting receptacle fixtures interior…19120not stated
Sep 27, 2021Panel upgradeExisting 100 AMP panel rewire throughout with switch lighting receptacle fixtures interior…19143not stated

What to ask before you hire

About Danny Vo

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Danny Vo

Five quick questions. We pass your request to Danny Vo.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Danny Vo. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 19145 and 19121

See all 126 panel upgrade electricians in Philadelphia, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.