Danny Vo
Panel upgrade electrician working in Philadelphia.
- License active
21 jobs on Philadelphia permits, 2021 to 2026: 12 panel upgrades, 6 heat pump installations, 3 home additions. 58th most panel upgrade permits of 126 contractors in Philadelphia.
What the public records show
From the city's license records and the city's permits, one question at a time.
| Question | Records show | Mark |
|---|---|---|
| Licensed? | License 42867, active in the city's records on Sep 24, 2026Contractor | Checks out |
| Jobs on record | 21 jobs on Philadelphia permits, 2021 to 2026: 12 panel upgrades, 6 heat pump installations, 3 home additions58th most panel upgrade permits of 126 licensed contractors in Philadelphia. That counts jobs, not quality.Our Philadelphia permit records cover September 2021 to September 2026. |
Records: the city Department of Licenses and Inspections and City of Philadelphia permits.
Cost and timing
Permit timeline
Across Philadelphia, a panel upgrade permit stays open about about 3 months, from permit to final inspection
This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.
Track record
3 jobs in the last 12 months, down from 5 the year before
Where they work most
- 191456 jobs
- 191213 jobs
- 191462 jobs
- 191282 jobs
- 191421 job
Jobs by kind of work
Latest jobs
Permit values are what the contractor wrote on the permit form, not what the owner paid.
| Date | Work | ZIP | On the permit form |
|---|---|---|---|
| Aug 3, 2026 | AdditionFor the erection of a rear 2nd story addition to an existing attached single-family structure as… | 19146 | not stated |
| Jun 23, 2026 | Panel upgradeInstall 200 amp service and meter socket outside as per nec 2017 | 19142 | not stated |
| Dec 9, 2025 | Panel upgradeInstall 100 amp service and meter socket rewire throughout with switch, lighting, receptacles,… | 19121 | not stated |
| Dec 18, 2024 | Heat pumpEZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork,… | 19140 | not stated |
| Nov 25, 2024 | Panel upgradeInstall and repair one outside light existing panel and existing wire on exterior front door | 19124 | not stated |
| Nov 19, 2024 | Heat pump | 19145 | not stated |
| Nov 18, 2024 | Panel upgradeRewire kitchen and bathroom on existing 100 amp panel as per NEC 2017 | 19145 | not stated |
| Sep 23, 2024 | Panel upgradeInstall 100 amp service and meter socket rewire throughout with switch, lighting, receptacles,… | 19121 | not stated |
| Sep 16, 2024 | Panel upgradeInstall new 100 service panel and rewire kitchen and bathroom as per NEC 2017 | 19145 | not stated |
| Jul 11, 2024 | Panel upgradeRemove old 100 amp panel & replace with new 100 amp panel with breaker on 1st floor as per nec… | 19149 | not stated |
| Mar 11, 2024 | Heat pump | 19146 | not stated |
| Feb 17, 2023 | Heat pumpEZ PERMIT DUCTWORK & WARM-AIR APPLIANCES For the installation of New Ductwork,… | 19145 | not stated |
| Feb 15, 2023 | AdditionFor the erection of a second floor rear addition to an existing attached single family dwelling | 19145 | not stated |
| Dec 1, 2022 | Heat pump | 19126 | not stated |
| Oct 20, 2022 | Panel upgradeInstall 100amp service and meter socket | 19148 | not stated |
| Oct 4, 2022 | Heat pump | 19128 | not stated |
| Sep 27, 2022 | Panel upgradeInstall 200amp service and meter socket | 19128 | not stated |
| Jul 11, 2022 | AdditionFor the erection of a rear addition to an existing attached building | 19145 | not stated |
| May 2, 2022 | Panel upgradeInstall 100 amp service and meter socket rewire throughout with switch, lighting, receptacles,… | 19121 | not stated |
| Sep 27, 2021 | Panel upgradeExisting 100 AMP panel rewire throughout with switch lighting receptacle fixtures interior… | 19120 | not stated |
| Sep 27, 2021 | Panel upgradeExisting 100 AMP panel rewire throughout with switch lighting receptacle fixtures interior… | 19143 | not stated |
What to ask before you hire
About Danny Vo
- Ask what the warranty covers and for how long, in writing.
- Search their name on the Better Business Bureau site, and read their reviews.
Worth asking any panel upgrade electrician
- Can you show me proof of liability insurance and your bond?
- What size panel, and does the utility need to change the service to my house?
- Who arranges the power shutoff with the utility?
- Who pulls the permit, and who meets the inspector?
Get a quote from Danny Vo
Five quick questions. We pass your request to Danny Vo.
Request for Danny Vo
- Where
- Job
- Start
- Budget
- Goes to
You decide who to hire. Your details go only to the contractors you pick. How we use your details
Sent. We have your request.
We pass it to Danny Vo. Replies usually come within a few days.
Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.
Open your job roomMore panel upgrade electricians near 19145 and 19121
- Generation 3 Electric Inc
- Tyree Strickland Electric, LLC
- Vincent Williams
- Beng Ding
- Camelot Contracting LLC
- Dudley Hilton
See all 126 panel upgrade electricians in Philadelphia, ranked by jobs
Run this business? Claim this page to get requests by email and reply to homeowners here.