contractors.fyi
Sign in

David L Davis

Panel upgrade electrician working in Philadelphia.

  • License 29321, inactive in the city's records on Sep 24, 2026

61 panel upgrade jobs on Philadelphia permits, 2021 to 2025.

The state showed this license as "inactive" on Sep 24, 2026. Do not hire until that is cleared.

What the public records show

From the city's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 29321, inactive in the city's records on Sep 24, 2026ContractorProblem
Jobs on record61 panel upgrade jobs on Philadelphia permits, 2021 to 2025Every permit we have for them is panel upgrade.Our Philadelphia permit records cover September 2021 to September 2026.

Records: the city Department of Licenses and Inspections and City of Philadelphia permits.

Cost and timing

Permit timeline

Across Philadelphia, a panel upgrade permit stays open about about 3 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q4 2021: 4 jobsQ1 2022: 1 jobQ2 2022: 8 jobsQ3 2022: 1 jobQ4 2022: 3 jobsQ1 2023: 2 jobsQ3 2023: 9 jobsQ4 2023: 8 jobsQ1 2024: 4 jobsQ2 2024: 12 jobsQ3 2024: 7 jobsQ4 2024: 1 jobQ2 2025: 1 jobBusiest: 12 jobs2022202320242025
Each bar is 3 months of permits. The tallest is 12 jobs, April to June 2024.

Where they work most

  • 191397 jobs
  • 191437 jobs
  • 191515 jobs
  • 191425 jobs
  • 191404 jobs

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jun 19, 2025Panel upgrade200amp service-200amp cable-200amp disconnect-200amp meter-b0ard-299amp panel-(2) ground rods-cold…19120not stated
Oct 10, 2024Panel upgradeInstall 200amp service19140not stated
Sep 25, 2024Panel upgradeRepair/replace 100amp service cable-install FD 100amp disconnect19134not stated
Sep 4, 2024Panel upgradeRemove 100 amp damage service cable and circuit breaker panel19134not stated
Aug 29, 2024Panel upgradeReplace existing circuit breaker panel with new 100 amp circuit breaker panel19104not stated
Aug 8, 2024Panel upgradeReplace damage 100 amp service cable, meter box and disconnect according to the 2017 nec19136not stated
Jul 25, 2024Panel upgradeReplace damaged breaker panel with new 100amp panel-reconnect existing circuits to new panel19150not stated
Jul 19, 2024Panel upgradeAmmended 12/16/24 Actual work done was to change an 200amp panel not a 100amp panel Replace…19121not stated
Jul 19, 2024Panel upgradeReplace old service with new 100amp service-run new circuit to 2nd fl bath to include: GFI …19133not stated
Jun 24, 2024Panel upgradeAMEND Replace damaged service cable & Meter Board REPLACE 100 AMP SERVICE CABLE AND CIRCUIT…19116not stated
Jun 24, 2024Panel upgrade19139not stated
Jun 5, 2024Panel upgrade19151not stated
May 20, 2024Panel upgradeInstall new 200amp service19148not stated
May 13, 2024Panel upgrade19116not stated
Apr 30, 2024Panel upgradeReplace damaged electrical panel with new 100amp panel19111not stated
Apr 22, 2024Panel upgrade19142not stated
Apr 16, 2024Panel upgrade200amp service/rewire building19122not stated
Apr 15, 2024Panel upgrade19121not stated
Apr 15, 2024Panel upgrade19139not stated
Apr 12, 2024Panel upgradeReplace old damaged 100amp panel with new 100amp panel19142not stated
Apr 2, 2024Panel upgradeReplace damaged 100amp electric panel with new 100amp electric panel19143not stated
Feb 15, 2024Panel upgrade19140not stated
Jan 24, 2024Panel upgradeReplace repair damaged 100amp service cable & 100amp meter-board19146not stated
Jan 4, 2024Panel upgradeReplace damaged 100amp panel with new 100amp panel-reconnect existing circuits to new panel AS PER…19135not stated
Jan 4, 2024Panel upgradeReplace damaged 100amp panel with new 100amp panel reconnect existing circuits to new panel AS PER…19138not stated
Dec 13, 2023Panel upgradeReplace damaged 200amp panel with new 200amp panel. as per nec 201719128not stated
Nov 28, 2023Panel upgradeReplace damaged 100amp service cable & meter-board with new 100amp service cable and meter-board AS…19144not stated
Nov 17, 2023Panel upgradeReplace damaged 200amp service cable with new 200amp service cable. Replace damaged 200amp…19143not stated
Nov 13, 2023Panel upgrade19111not stated
Nov 13, 2023Panel upgrade19143not stated
Oct 31, 2023Panel upgrade19143not stated
Oct 27, 2023Panel upgrade19142not stated
Oct 19, 2023Panel upgrade19139not stated
Sep 25, 2023Panel upgradeReplace damaged 2-gang meter-board with new 2-gang meter-board and 1-100amp disconnect/reconnect…19149not stated
Sep 22, 2023Panel upgradeInstall 200amp service grounding system, new light fixtures, outlets, switches, smoke and cd…19151not stated
Sep 12, 2023Panel upgradeReplace damaged 100amp panel in basement with new 100amp panel-reconnect existing circuits to new…19148not stated
Sep 7, 2023Panel upgradeReplace existing damaged electrical panel with new 100amp panel AS PER NEC 201719139not stated
Aug 9, 2023Panel upgradeReplace damaged 100amp panel in basement with new 100amp panel-reconnect existing circuits to new…19140not stated
Aug 2, 2023Panel upgradeReplace damaged 100amp panel with new 100amp panel-reconnect existing circuits to new…19134not stated
Jul 28, 2023Panel upgrade19142not stated

What to ask before you hire

About David L Davis

  • Do not hire until the state shows the license as active.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from David L Davis

Five quick questions. We pass your request to David L Davis.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to David L Davis. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 19139 and 19143

See all 126 panel upgrade electricians in Philadelphia, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.