Drijon Gjoni
Panel upgrade electrician working in Philadelphia.
- Philadelphia publishes no contractor license list we can check
31 jobs on Philadelphia permits, 2022 to 2026: 17 solar installations, 10 panel upgrades, 4 EV charger installations.
What the public records show
From the city's license records and the city's permits, one question at a time.
| Question | Records show | Mark |
|---|---|---|
| Licensed? | Philadelphia publishes no contractor license list we can checkThat says nothing about this business either way. | Ask them |
| Jobs on record | 31 jobs on Philadelphia permits, 2022 to 2026: 17 solar installations, 10 panel upgrades, 4 EV charger installationsOur Philadelphia permit records cover September 2021 to September 2026. |
Records: the city Department of Licenses and Inspections and City of Philadelphia permits.
Cost and timing
Permit timeline
Across Philadelphia, a panel upgrade permit stays open about about 3 months, from permit to final inspection
This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.
Track record
5 jobs in the last 12 months, up from 4 the year before
Where they work most
- 191464 jobs
- 191434 jobs
- 191473 jobs
- 191193 jobs
- 191303 jobs
Jobs by kind of work
- Solar
- Panel upgrade
- EV charger
Latest jobs
Permit values are what the contractor wrote on the permit form, not what the owner paid.
| Date | Work | ZIP | On the permit form |
|---|---|---|---|
| Mar 5, 2026 | Panel upgradeInstall one (1) electric vehicle charger, including associated wiring, overcurrent protection,… | 19146 | not stated |
| Mar 5, 2026 | EV chargerInstall one (1) electric vehicle charger, including associated wiring, overcurrent protection,… | 19146 | not stated |
| Mar 2, 2026 | EV chargerInstall (1) EV charger (1)50A Generator Load Shedding Module | 19129 | not stated |
| Jan 30, 2026 | Solar | 19146 | not stated |
| Oct 30, 2025 | Solar, 7.2 kWInstallation of rooftop mounted 7.2 kw solar photovoltaic pv system according to the 2017 nec and… | 19147 | not stated |
| Aug 6, 2025 | Panel upgradeInstall 200amp 2 gang meter socket - Install 100amp main breaker panel for the first floor… | 19147 | not stated |
| Nov 14, 2024 | Panel upgradeRewire house, install 200amp service, outlets, switches, lights and 110 smokes according to… | 19143 | not stated |
| Oct 23, 2024 | Panel upgradeRewire 100 amp existing electrical panel | 19143 | not stated |
| Oct 18, 2024 | Panel upgradeWiring throuhout the house as per code 2017. 200 amp service entrance | 19134 | not stated |
| Sep 3, 2024 | Solar, 13.8 kWInstallation of rooftop mounted 13.8kw solar photovoltaic pv system according to the 2017 nec and | 19119 | not stated |
| Feb 18, 2024 | Solar | 19107 | not stated |
| Dec 21, 2023 | Solar | 19146 | not stated |
| Nov 27, 2023 | Solar, 6 kWInstallation of rooftop mounted 6kw solar photovoltaic pv system according to the 2017 nec and per… | 19143 | not stated |
| Nov 13, 2023 | Solar | 19130 | not stated |
| Oct 16, 2023 | Solar | 19148 | not stated |
| Sep 25, 2023 | Solar | 19125 | not stated |
| Aug 4, 2023 | Solar | 19119 | not stated |
| Jul 20, 2023 | Solar | 19128 | not stated |
| Jul 20, 2023 | Solar | 19152 | not stated |
| Jul 20, 2023 | Solar | 19128 | not stated |
| May 22, 2023 | EV chargerInstallation of one (1) hard-wired Wallbox Universal Chargers. -Installation of (1)(N) 2-pole 60A… | 19147 | not stated |
| May 22, 2023 | Solar | 19130 | not stated |
| May 12, 2023 | Solar | 19128 | not stated |
| May 4, 2023 | Solar, 5.18 kW | 19130 | not stated |
| May 4, 2023 | Solar | 19152 | not stated |
| Apr 18, 2023 | Panel upgradeInstall new service line and 200 A panel upgrade as per 2017 nec | 19143 | not stated |
| Jan 18, 2023 | Panel upgradeReplacing 100 AMP existing panel, New Wiring throughout the house , outlets, Light fixtures,… | 19119 | not stated |
| Jan 5, 2023 | Panel upgradeBrand New 200 AMP service | 19148 | not stated |
| Nov 9, 2022 | Panel upgradeInstall (1) Tesla electric vehicle charger and 100 amp sub panel as per 2014 nec | 19118 | not stated |
| Nov 9, 2022 | EV chargerInstall (1) Tesla electric vehicle charger and 100 amp sub panel as per 2014 nec | 19118 | not stated |
| Jun 15, 2022 | Panel upgradeRewiring all house as for nec 2017. New electrical panel 200 amp | 19123 | not stated |
What to ask before you hire
About Drijon Gjoni
- Ask for their license number and check it with the state.
- Ask what the warranty covers and for how long, in writing.
- Search their name on the Better Business Bureau site, and read their reviews.
Worth asking any panel upgrade electrician
- Can you show me proof of liability insurance and your bond?
- What size panel, and does the utility need to change the service to my house?
- Who arranges the power shutoff with the utility?
- Who pulls the permit, and who meets the inspector?
Get a quote from Drijon Gjoni
Five quick questions. We pass your request to Drijon Gjoni.
Request for Drijon Gjoni
- Where
- Job
- Start
- Budget
- Goes to
You decide who to hire. Your details go only to the contractors you pick. How we use your details
Sent. We have your request.
We pass it to Drijon Gjoni. Replies usually come within a few days.
Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.
Open your job roomMore panel upgrade electricians near 19146 and 19143
- Generation 3 Electric Inc
- Tyree Strickland Electric, LLC
- Vincent Williams
- Arber Sulaj
- Barry J Yeslow
- Bsf Electrical Contractors LLC
See all 126 panel upgrade electricians in Philadelphia, ranked by jobs
Run this business? Claim this page to get requests by email and reply to homeowners here.