Panel upgrade electrician working in Philadelphia.

  • Philadelphia publishes no contractor license list we can check

96 jobs on Philadelphia permits, 2021 to 2026: 95 panel upgrades, 1 EV charger installation.

What the public records show

From the city's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Philadelphia publishes no contractor license list we can checkThat says nothing about this business either way.Ask them
Jobs on record96 jobs on Philadelphia permits, 2021 to 2026: 95 panel upgrades, 1 EV charger installationOur Philadelphia permit records cover September 2021 to September 2026.

Records: the city Department of Licenses and Inspections and City of Philadelphia permits.

Cost and timing

Permit timeline

Across Philadelphia, a panel upgrade permit stays open about about 3 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

19 jobs in the last 12 months, up from 17 the year before

Q4 2021: 6 jobsQ1 2022: 1 jobQ2 2022: 5 jobsQ3 2022: 6 jobsQ4 2022: 3 jobsQ1 2023: 10 jobsQ2 2023: 3 jobsQ3 2023: 9 jobsQ4 2023: 1 jobQ1 2024: 6 jobsQ2 2024: 4 jobsQ3 2024: 6 jobsQ4 2024: 2 jobsQ1 2025: 7 jobsQ2 2025: 3 jobsQ3 2025: 5 jobsQ4 2025: 5 jobsQ1 2026: 5 jobsQ2 2026: 6 jobsQ3 2026: 3 jobsBusiest: 10 jobsLatest: 3 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 10 jobs, January to March 2023. Across Philadelphia, all contractors together had 0% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 1912811 jobs
  • 191119 jobs
  • 191477 jobs
  • 191195 jobs
  • 191245 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Aug 18, 2026Panel upgradeReplace existing 100 amp service complete,30 circuit panel with main,full grounding system,replace…19136not stated
Jul 24, 2026Panel upgradeIn basement laundry/panel room, cut back 10-12 circuits that were burnt, box off and extend back to…19147not stated
Jul 9, 2026Panel upgradeResidential Service Equipment not exceeding a rating of 200 amps WITH AN INCREASE IN SERVICE SIZE…19111not stated
Jun 11, 2026Panel upgrade200 amp service complete,200 amp service drop,200 amp meter disconnect,200 amp ser entrance…19147not stated
May 30, 2026Panel upgrade200 amp service complete with, 200 amp service cable drop, outside meter main, 200 amp ser entrance…19119not stated
May 30, 2026Panel upgrade100 amp service cable drop sleeved in pvc, meter socket, 100 amp service entrance cable19104not stated
May 15, 2026Panel upgrade200 amp service complete, 200 amp service cable drop, outside meter main, 200 amp ser entrance…19148not stated
May 8, 2026Panel upgrade200 amp service complete, outdoor meter main,200 amp sub feeder entrance cable,40 circuit main lug…19120not stated
Apr 27, 2026Panel upgradeReplace misc ungrounded outlets thru out with gfi outlets,install arc fault as needed,disconnect…19119not stated
Mar 17, 2026Panel upgrade100 amp service complete, service cable drop, outside meter socket, service entrance cable, 100 amp…19125not stated
Mar 13, 2026Panel upgrade2nd flr master bedroom, 2-arc fault circuits with 6 outlets, wiring and feeder 4 wall…19119not stated
Feb 27, 2026Panel upgrade200 amp service complete,,service cable drop,meter main,sub feeder,40 circuit panel,full grounding…19143not stated
Feb 9, 2026Panel upgrade200 amp meter main, 200 amp ser entrance cable, plywood backboard, 40 circuit panel, full ground…19139not stated
Jan 22, 2026Panel upgrade200 amp service with service cable drop, meter main,200 amp ser cable to 40 circuit main lug panel,…19127not stated
Dec 16, 2025Panel upgrade200 amp service complete, service cable drop, outside meter main, 200 amp sub-feeder, 40 circuit…19127not stated
Dec 1, 2025Panel upgrade200 amp service complete,outside 200 amp meter main,service cable drop sleeved in pvc conduit,200…19128not stated
Oct 24, 2025Panel upgradeInstall 100 amp electrical service meter socket and the main circuit breaker panel with proper…19128not stated
Oct 22, 2025Panel upgrade19143not stated
Oct 8, 2025Panel upgrade19148not stated
Sep 17, 2025Panel upgradeReplace 100 amp panel with 100 amp 30 circuit panel with main,full grounding system,20 amp arc…19128not stated
Sep 17, 2025Panel upgrade100 amp service complete, 100 amp service cable drop, meter socket, 20 circuit panel with main,…19147not stated
Aug 28, 2025Panel upgrade100 amp service cable drop,meter socket, 100 amp service entrance cable, 100 amp disconnect, 100…19128not stated
Jul 25, 2025Panel upgrade100 amp service complete,service cable drop,meter socket,service entrance cable,30 circuit panel…19114not stated
Jul 3, 2025Panel upgrade200 amp service complete,200 amp service cable drop,200 amp out side meter socket, 200 amp service…19124not stated
Jun 26, 2025Panel upgrade100 amp service cable drop,meter socket,100 amp service entrance cable,100 amp 30 circuit panel…19120not stated
May 23, 2025Panel upgrade200 amp service, 200 amp service drop, outside meter socket, 200 amp service entrance cable, 200…19150not stated
Apr 23, 2025Panel upgrade200 amp service complete, service cable drop,meter socket, service entrance cable,40 circuit panel…19140not stated
Mar 24, 2025Panel upgrade100 amp service cable drop,100 amp meter main,100 amp SER(sub feeder) service entrance cable,100…19134not stated
Feb 27, 2025Panel upgradeReplace 200 amp service cable drop, 3 gang meter socket, 3-100 amp service entrance cables to…19124not stated
Feb 19, 2025Panel upgrade200 amp service complete,200 amp disconnect,200 amp sub feeder,200 amp 40 circuit panel,full…19115not stated
Feb 13, 2025Panel upgradeReplace knob and tube and or ungrounded wiring in following areas with arc fault circuit and…19128not stated
Feb 6, 2025Panel upgrade19111not stated
Feb 3, 2025Panel upgrade200 amp service complete, 200 amp service cable drop,outside meter socket,200 amp service entrance…19141not stated
Jan 30, 2025Panel upgrade19148not stated
Nov 6, 2024Panel upgradeReplace 100 amp service cable drop, replace 100 amp service entrance cable, ground rod19134not stated
Oct 11, 2024Panel upgrade19128not stated
Sep 20, 2024Panel upgradeFurnish and install temporary service with post,meter socket,service drop,ground rod,100 amp 12…19143not stated
Sep 10, 2024Panel upgrade100 amp service complete,service drop,meter socket,service entrance cable,20 circuit panel with…19111not stated
Aug 8, 2024Panel upgradeArc fault circuit and outlet for gas stove kitchen appliance cord for gas stove 100 amp service…19150not stated
Jul 26, 2024Panel upgradeReplace 200 amp service cable drop Replace 2 gang meter socket19124not stated

What to ask before you hire

About Jeffrey Shefsky

  • Ask for their license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Jeffrey Shefsky

Five quick questions. We pass your request to Jeffrey Shefsky.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Jeffrey Shefsky. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 19128 and 19111

See all 126 panel upgrade electricians in Philadelphia, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.