contractors.fyi
Sign in

Lec-tron

Panel upgrade electrician working in Philadelphia.

  • License active

165 panel upgrade jobs on Philadelphia permits, 2021 to 2026. 7th most panel upgrade permits of 126 contractors in Philadelphia.

What the public records show

From the city's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 16725, active in the city's records on Sep 24, 2026ContractorChecks out
Jobs on record165 panel upgrade jobs on Philadelphia permits, 2021 to 2026Every permit we have for them is panel upgrade.7th most panel upgrade permits of 126 licensed contractors in Philadelphia. That counts jobs, not quality.Our Philadelphia permit records cover September 2021 to September 2026.

Records: the city Department of Licenses and Inspections and City of Philadelphia permits.

Cost and timing

Permit timeline

Across Philadelphia, a panel upgrade permit stays open about about 3 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

16 jobs in the last 12 months, down from 31 the year before

Q3 2021: 1 jobQ4 2021: 2 jobsQ1 2022: 2 jobsQ2 2022: 6 jobsQ3 2022: 7 jobsQ4 2022: 4 jobsQ1 2023: 4 jobsQ2 2023: 5 jobsQ3 2023: 16 jobsQ4 2023: 20 jobsQ1 2024: 18 jobsQ2 2024: 22 jobsQ3 2024: 11 jobsQ4 2024: 13 jobsQ1 2025: 9 jobsQ2 2025: 5 jobsQ3 2025: 6 jobsQ4 2025: 4 jobsQ1 2026: 3 jobsQ2 2026: 5 jobsQ3 2026: 2 jobsBusiest: 22 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 22 jobs, April to June 2024. Across Philadelphia, all contractors together had 0% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 1913214 jobs
  • 1912113 jobs
  • 1914312 jobs
  • 1914811 jobs
  • 1913411 jobs

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 16, 2026Panel upgradeResidential Service Equipment not exceeding a rating of 200 amps WITH AN INCREASE IN SERVICE SIZE…19148not stated
Aug 27, 2026Panel upgradeInstalling a 200 amp service complete replacing 100amp existing service replacing defective…19139not stated
Jun 24, 2026Panel upgradeREPLACING A 100AMP ELECTRICAL PANEL COMPLETE. INSTALLING (5) 20AMP CIRCUITS FOR APPLIANCEs19149not stated
May 27, 2026Panel upgradeReplacing 100 amp panel complete. installing (5) 15/20 amp circuits for appliances. (all fished &…19144not stated
May 19, 2026Panel upgradeInstalling a 100 amp service complete19148not stated
May 18, 2026Panel upgradeReplacing a 100 amp panel complete19149not stated
Apr 13, 2026Panel upgradeReplacing a 100amp panel complete. installing 15/20amp circuits for 2nd floor bathroom for…19144not stated
Mar 26, 2026Panel upgrade19140not stated
Mar 9, 2026Panel upgrade19145not stated
Feb 9, 2026Panel upgradeInstalling 100amp panel board complete. installing (5) 15/20 amp circuits to 2nd floor bathroom…19121not stated
Dec 11, 2025Panel upgrade19134not stated
Nov 10, 2025Panel upgrade19121not stated
Oct 16, 2025Panel upgradeReplacing 1 100amp panel complete. replacing various defective switches,fixtures,etc. installing…19120not stated
Oct 7, 2025Panel upgrade(replace 100amp service complete) as well as Installing two switches, lights, and heaters with…19143not stated
Sep 25, 2025Panel upgradeAMEND 11-10-2025 Upgraded to a 200amp service REPLACING A 100AMP PANEL COMPLETE. INSTALLING (3)…19124not stated
Sep 24, 2025Panel upgradeInstalling a 100amp service complete with disconnect19135not stated
Aug 27, 2025Panel upgrade19132not stated
Aug 13, 2025Panel upgrade19134not stated
Aug 13, 2025Panel upgradeInstalling a 100amp sub-panel complete. installing (3) 15/20 amp circuits to a 1st floor bathroom…19142not stated
Jul 24, 2025Panel upgradeReplacing a 100amp service complete. installing a 20amp circuit for a stair glide. (all fished &…19150not stated
Jun 23, 2025Panel upgradeReplacing a 100amp panel. installing (3) 15/20amp circuits to 2nd floor bathroom…19138not stated
Jun 18, 2025Panel upgrade19132not stated
May 12, 2025Panel upgradeReplacing a 100amp panel complete. installing a 15/20amp circuit for a stair lift. (all fished &…19152not stated
Apr 24, 2025Panel upgradeAmended 4/30/25 Eliminating 100amp panel change and installing new 200amp service complete with…19121not stated
Apr 4, 2025Panel upgradeReplacing a 100amp panel complete. instaaling a 20amp circuit for chair lift (gfci) installing…19124not stated
Mar 21, 2025Panel upgradeInstalling a 100amp service complete . installing (3) 15/20amp circuits for 2nd floor bath for…19143not stated
Mar 20, 2025Panel upgrade19121not stated
Mar 3, 2025Panel upgradeInstalling a 100amp service complete. installing a 20amp circuit complete for a stair…19139not stated
Feb 26, 2025Panel upgradeReplacing a 100amp panel. installing (3) 15/20 amp circuits to 2nd floor bathroom for…19146not stated
Feb 13, 2025Panel upgradeReplacing a 100amp panel complete> installing a dedicated 20amp circuit for a stair glide. install…19151not stated
Feb 13, 2025Panel upgradeReplacing a 100amp panel complete. installing a 20amp circuit fro stair glide & (3) battery smoke…19141not stated
Jan 30, 2025Panel upgrade19141not stated
Jan 28, 2025Panel upgradeReplacing a 100amp panel complete (30circuit) installing a dedicated circuit for a stair glide…19140not stated
Jan 21, 2025Panel upgrade19132not stated
Dec 20, 2024Panel upgrade19142not stated
Dec 19, 2024Panel upgrade19153not stated
Nov 19, 2024Panel upgrade19151not stated
Nov 18, 2024Panel upgrade19111not stated
Nov 18, 2024Panel upgradeRplacing a 100amp panel complete. replacing various defective switches,fixtures,etc. installing (4)…19119not stated
Nov 15, 2024Panel upgradeReplacing a 100amp service complete. replacing various defective switches,fixtures,etc. installing…19142not stated

What to ask before you hire

About Lec-tron

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Lec-tron

Five quick questions. We pass your request to Lec-tron.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Lec-tron. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 19132 and 19121

See all 126 panel upgrade electricians in Philadelphia, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.