contractors.fyi
Sign in

Newman Lewis

Panel upgrade electrician working in Philadelphia.

  • License active

77 panel upgrade jobs on Philadelphia permits, 2022 to 2026. 21st most panel upgrade permits of 126 contractors in Philadelphia.

What the public records show

From the city's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 053689, active in the city's records on Sep 24, 2026ContractorChecks out
Jobs on record77 panel upgrade jobs on Philadelphia permits, 2022 to 2026Every permit we have for them is panel upgrade.21st most panel upgrade permits of 126 licensed contractors in Philadelphia. That counts jobs, not quality.Our Philadelphia permit records cover September 2021 to September 2026.

Records: the city Department of Licenses and Inspections and City of Philadelphia permits.

Cost and timing

Permit timeline

Across Philadelphia, a panel upgrade permit stays open about about 3 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

22 jobs in the last 12 months, up from 19 the year before

Q1 2022: 1 jobQ2 2022: 2 jobsQ3 2022: 3 jobsQ1 2023: 6 jobsQ2 2023: 3 jobsQ3 2023: 9 jobsQ4 2023: 6 jobsQ1 2024: 4 jobsQ3 2024: 2 jobsQ4 2024: 5 jobsQ1 2025: 3 jobsQ2 2025: 4 jobsQ3 2025: 7 jobsQ4 2025: 3 jobsQ1 2026: 5 jobsQ2 2026: 8 jobsQ3 2026: 6 jobsBusiest: 9 jobsLatest: 6 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 9 jobs, July to September 2023. Across Philadelphia, all contractors together had 0% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 191437 jobs
  • 191216 jobs
  • 191326 jobs
  • 191396 jobs
  • 191335 jobs

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 11, 2026Panel upgradeResidential Service Equipment not exceeding a rating of 200 amps WITH AN INCREASE IN SERVICE SIZE…19151not stated
Sep 9, 2026Panel upgradeReplace electrical devices throughout, Install AFCI protection for existing circuits19133not stated
Aug 10, 2026Panel upgrade100 amp service19142not stated
Aug 4, 2026Panel upgradeInstall 200 AMP service, 30 space panel box and rewire the residence throughout19131not stated
Jul 22, 2026Panel upgradeReplace existing 200amp service19141not stated
Jul 22, 2026Panel upgradeINSTALL 200 AMP ELECTRICAL SERVICE, METER SOCKET AND CIRCUIT BREAKER PANEL WITH PROPER GROUNDING…19140not stated
Jun 4, 2026Panel upgradeRewire throughout install 150 amp service19141not stated
Jun 1, 2026Panel upgrade200 AMP NEW SERVICE, New rewire, new panel box19125not stated
May 28, 2026Panel upgrade200 amp service installation19120not stated
May 28, 2026Panel upgradeReplace existing 200 amp service install two gang meter socket install 60 amp panel in garage…19141not stated
May 1, 2026Panel upgradeRewire throughout, install 100 amp service, and install grounding and bonging19121not stated
May 1, 2026Panel upgradeNew 200 amp service, replace number 2 SEU aluminum cable with number 2 SCR cable to existing sub…19111not stated
Apr 14, 2026Panel upgradeInstall 200 AMP service line, three gang meter socket, grounding and bonding19126not stated
Apr 2, 2026Panel upgradeFull rewire with 100 amp service19121not stated
Mar 3, 2026Panel upgradeRough in of a two family home, new wires all around, new panels and breakers19143not stated
Feb 25, 2026Panel upgradeInstall 200 amp electrical service, two meter socket with proper grounding and bonding19121not stated
Jan 22, 2026Panel upgradeRewire throughout, install 200 amp service (Fishing wirees)19121not stated
Jan 13, 2026Panel upgradeRewire throughout the fishing wires19129not stated
Jan 7, 2026Panel upgradeNew 200 amp service Installing high hats in first and second floor Installing baseboard heaters…19132not stated
Nov 18, 2025Panel upgradeChange out electrical panel to 100 AMP, 30/30 panel, add grounding and bonding19129not stated
Oct 29, 2025Panel upgradeInstall 200 Amp service, grounding and bonging included19121not stated
Oct 16, 2025Panel upgradeFixing all electrical issues in main panel box, adding a 100amp sub panel box19119not stated
Sep 17, 2025Panel upgradeRough in of a two family home19140not stated
Sep 17, 2025Panel upgradeReplace old existing 200amp service with new 200amp service, grounding and bonding19131not stated
Aug 22, 2025Panel upgradeInstallation of 100 amp service, interior rewire19151not stated
Jul 23, 2025Panel upgradeReplace 100 amp panel, install two kitchen counter top reccptles, and replace all kitchen outlets19151not stated
Jul 18, 2025Panel upgradeRewire through out, install 100 amp service and 30 spacer panel19143not stated
Jul 3, 2025Panel upgradeRewire bathroom, 1 bedroom, hallway and laundry room on third floor19144not stated
Jul 2, 2025Panel upgradeRe-wire entire house19119not stated
Jun 23, 2025Panel upgradeInstall 100 amp Service19104not stated
Jun 4, 2025Panel upgradeInstall recess lights through out, update existing outlets to tampered resistance19111not stated
Apr 22, 2025Panel upgradeRewire through out only second floor apt, install 150 amp service subpanel on second floor, add…19143not stated
Apr 22, 2025Panel upgradeRewire through out, install new 100 amp service19133not stated
Mar 13, 2025Panel upgradeInstall 100 Amp service, install 15amp circuit to bathroom light19130not stated
Feb 26, 2025Panel upgradeRewire throughout19139not stated
Jan 22, 2025Panel upgradeRewire throughout and install 200 AMP service19132not stated
Dec 19, 2024Panel upgradeRewire throughout install 100amp service 20 spacer panel box19120not stated
Nov 21, 2024Panel upgradeRewire throughout, install 100amp service19141not stated
Nov 8, 2024Panel upgradeInstallation of a new 200 AMP 30 space electrical service panel, grounding and bonding19131not stated
Oct 24, 2024Panel upgradeInstall 200 AMP service, grounding, bonding and 30 space panel box19143not stated

What to ask before you hire

About Newman Lewis

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Newman Lewis

Five quick questions. We pass your request to Newman Lewis.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Newman Lewis. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 19143 and 19121

See all 126 panel upgrade electricians in Philadelphia, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.