contractors.fyi
Sign in

Robert Monk

Panel upgrade electrician working in Philadelphia.

  • License 39522, inactive in the city's records on Sep 24, 2026

42 jobs on Philadelphia permits, 2022 to 2025: 37 solar installations, 4 panel upgrades, 1 EV charger installation.

The state showed this license as "inactive" on Sep 24, 2026. Do not hire until that is cleared.

What the public records show

From the city's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 39522, inactive in the city's records on Sep 24, 2026ContractorProblem
Jobs on record42 jobs on Philadelphia permits, 2022 to 2025: 37 solar installations, 4 panel upgrades, 1 EV charger installationOur Philadelphia permit records cover September 2021 to September 2026.

Records: the city Department of Licenses and Inspections and City of Philadelphia permits.

Cost and timing

Permit timeline

Across Philadelphia, a panel upgrade permit stays open about about 3 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

0 jobs in the last 12 months, down from 6 the year before

Q1 2022: 1 jobQ3 2022: 2 jobsQ1 2023: 6 jobsQ2 2023: 9 jobsQ3 2023: 3 jobsQ4 2023: 3 jobsQ1 2024: 5 jobsQ2 2024: 4 jobsQ3 2024: 3 jobsQ4 2024: 5 jobsQ2 2025: 1 jobBusiest: 9 jobsLatest: 1 job2022202320242025
Each bar is 3 months of permits. The tallest is 9 jobs, April to June 2023. Across Philadelphia, all contractors together had 0% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 1914311 jobs
  • 191305 jobs
  • 191284 jobs
  • 191484 jobs
  • 191473 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Jun 23, 2025Panel upgradeUPGRADE TO 200 AMP ELECTRICAL SERVICE AND INSTALL 100 AMP SUBPANEL ON 2nd FLOOR. CLEAN UP ANY…19125not stated
Oct 28, 2024Solar19127not stated
Oct 28, 2024Solar, 4.4 kWRooftop Solar Array 4.4kW Solar Electric System featuring Axitec 400W Premium Black Solar Panels;…19147not stated
Oct 28, 2024Solar, 6 kWRooftop Solar Array: 6kW Solar Electric System featuring Axitec 400W Black Premium Solar Panels,…19143not stated
Oct 28, 2024Solar, 3.6 kWRooftop Solar Array: 3.6kW Solar Electric System featuring Axitec 400W Black Premium Solar Panels,…19147not stated
Oct 2, 2024Solar, 8 kWRooftop Solar Array 8kW Solar Electric System featuring 400W Axitec Black Premium Solar Panels,…19104not stated
Sep 19, 2024Solar19128not stated
Sep 19, 2024Solar19148not stated
Aug 30, 2024Solar19130not stated
May 30, 2024Solar19130not stated
May 28, 2024Solar19143not stated
May 28, 2024Solar19125not stated
May 9, 2024Solar19130not stated
Mar 13, 2024Solar19148not stated
Mar 13, 2024Solar19130not stated
Mar 13, 2024Solar19104not stated
Mar 13, 2024Solar19148not stated
Mar 13, 2024Solar19143not stated
Dec 29, 2023Panel upgrade200A service upgrade; kitchen rewire; 2FL bath rewire; about (18) recessed lights at dining room…19143not stated
Oct 13, 2023Solar19130not stated
Oct 11, 2023Solar19128not stated
Aug 30, 2023Solar (×2, same day)19139not stated
Aug 10, 2023Solar19145not stated
Jun 17, 2023Panel upgradeUpgrade to 200 amp electrical service with circuit breaker panel19143not stated
May 19, 2023Solar19147not stated
May 19, 2023Solar19127not stated
May 19, 2023Solar19148not stated
May 19, 2023Solar19145not stated
May 19, 2023Solar19143not stated
May 18, 2023Solar19143not stated
Apr 19, 2023Solar19104not stated
Apr 4, 2023Solar19128not stated
Mar 30, 2023Solar19143not stated
Mar 23, 2023Solar19129not stated
Mar 20, 2023Solar19143not stated
Mar 14, 2023Solar19128not stated
Jan 8, 2023Panel upgradeNo details on the permit19103not stated
Jan 8, 2023EV chargerNo details on the permit19103not stated
Sep 19, 2022Solar19143not stated
Jul 25, 2022Solar19143not stated

What to ask before you hire

About Robert Monk

  • Do not hire until the state shows the license as active.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Robert Monk

Five quick questions. We pass your request to Robert Monk.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Robert Monk. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 19143 and 19130

See all 126 panel upgrade electricians in Philadelphia, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.