contractors.fyi
Sign in

Short Circuit Electrical LLC

Panel upgrade electrician working in Philadelphia.

  • Philadelphia publishes no contractor license list we can check

3 panel upgrade jobs on Philadelphia permits, 2024 to 2026.

What the public records show

From the city's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Philadelphia publishes no contractor license list we can checkThat says nothing about this business either way.Ask them
Jobs on record3 panel upgrade jobs on Philadelphia permits, 2024 to 2026Every permit we have for them is panel upgrade.Our Philadelphia permit records cover September 2021 to September 2026.

Records: the city Department of Licenses and Inspections and City of Philadelphia permits.

Cost and timing

Permit timeline

Across Philadelphia, a panel upgrade permit stays open about about 3 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

Where they work most

  • 191471 job
  • 191141 job
  • 191451 job

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Mar 10, 2026Panel upgradeUpgrade existing 100A electrical service to new 200A service19147not stated
Sep 23, 2025Panel upgradeUpgrade 100 amp service to 200 amp service19114not stated
Apr 11, 2024Panel upgradeAdd house panel, and wire the addition third floor per NEC 201719145not stated

What to ask before you hire

About Short Circuit Electrical LLC

  • Ask for their license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Short Circuit Electrical LLC

Five quick questions. We pass your request to Short Circuit Electrical LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Short Circuit Electrical LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 19147 and 19114

See all 126 panel upgrade electricians in Philadelphia, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.