contractors.fyi
Sign in

Solar States LLC

Panel upgrade electrician working in Philadelphia.

  • License active

569 jobs on Philadelphia permits, 2021 to 2026: 555 solar installations, 8 EV charger installations, 6 panel upgrades.

What the public records show

From the city's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 052728, active in the city's records on Sep 24, 2026ContractorChecks out
Jobs on record569 jobs on Philadelphia permits, 2021 to 2026: 555 solar installations, 8 EV charger installations, 6 panel upgradesOur Philadelphia permit records cover September 2021 to September 2026.

Records: the city Department of Licenses and Inspections and City of Philadelphia permits.

Cost and timing

Permit timeline

Across Philadelphia, a panel upgrade permit stays open about about 3 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

138 jobs in the last 12 months, up from 107 the year before

Q3 2021: 1 jobQ4 2021: 24 jobsQ1 2022: 47 jobsQ2 2022: 27 jobsQ3 2022: 39 jobsQ4 2022: 12 jobsQ1 2023: 36 jobsQ2 2023: 26 jobsQ3 2023: 22 jobsQ4 2023: 33 jobsQ1 2024: 21 jobsQ2 2024: 12 jobsQ3 2024: 26 jobsQ4 2024: 22 jobsQ1 2025: 18 jobsQ2 2025: 33 jobsQ3 2025: 38 jobsQ4 2025: 65 jobsQ1 2026: 24 jobsQ2 2026: 28 jobsQ3 2026: 15 jobsBusiest: 65 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 65 jobs, October to December 2025. Across Philadelphia, all contractors together had 0% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 1914366 jobs
  • 1911961 jobs
  • 1914746 jobs
  • 1912840 jobs
  • 1913038 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 22, 2026Solar19123not stated
Sep 22, 2026Solar19130not stated
Sep 21, 2026Solar19119not stated
Sep 11, 2026Solar, 12.150 kW19128not stated
Aug 26, 2026SolarPer the Historical Commission: Conduit on side wall shall be mounted close to downspout and painted…19147not stated
Aug 18, 2026Solar19145not stated
Aug 17, 2026SolarInstallation of a 5.720kWp PV system GP-2026-00449919121not stated
Aug 12, 2026Solar19104not stated
Jul 28, 2026Solar, 80 kWInstallation of rooftop mounted 8,80 kw solar photovoltaic pv system according to the 2017 nec and19103not stated
Jul 28, 2026Solar19142not stated
Jul 27, 2026Solar, 5.95 kW19138not stated
Jul 27, 2026SolarResidential Service Equipment not exceeding a rating of 200 amps WITH NO INCREASE IN SERVICE SIZE…19143not stated
Jul 27, 2026Solar19146not stated
Jul 24, 2026Solar19125not stated
Jul 15, 2026Solar19145not stated
Jun 29, 2026Solar, 21.6 kW19119not stated
Jun 16, 2026Solar, 6.88 kWAMEND 08/27/2026 System size slight change - System Size: 6.88 kW DC, 6.08 kW AC PV Modules: 16…19146not stated
Jun 11, 2026Solar, 9.00 kW19149not stated
Jun 9, 2026Solar, 8.80 kWInstallation of a 8.80 kW solar system, consisting of (20) JA SOLAR: JAM54D41-440/MB, AND (20)…19118not stated
Jun 8, 2026Solar, 3.690 kW19129not stated
Jun 8, 2026Solar, 8.8 kW19119not stated
Jun 3, 2026Solar19129not stated
Jun 3, 2026Solar19148not stated
Jun 2, 2026Solar, 10.80 kW19140not stated
Jun 1, 2026Solar, 10.560 kWInstallation of a 10.560 kW DC system19118not stated
May 26, 2026Solar, 3.52 kW19130not stated
May 21, 2026Solar, 10.560 kWInstallation of a 10.560 kW DC consisting of (24) JA SOLAR JAM54D41-440/MB, and (24) ENPHASE…19118not stated
May 20, 2026Solar19148not stated
May 19, 2026Solar19130not stated
May 15, 2026Solar, 15.840 kWInstall a 15.840 kW photovoltaic (PV) solar energy system19106not stated
May 12, 2026Solar, 3.960 kWInstallation of a 3.960 kW DC, 11.5kW AC & 15.00KWH solar system, consisting of (9) JA SOLAR…19119not stated
May 8, 2026Solar19146not stated
May 4, 2026Solar19103not stated
Apr 30, 2026EV chargerFurnish and install one (1) Grizzl-E EV Charger19104not stated
Apr 30, 2026Solar, 9.315 kWInstallation of a 9.315 kW solar system, consisting of (23) SOLARSPACE LUMINA I : SS8-54HSB-405M,…19121not stated
Apr 23, 2026Solar19144not stated
Apr 21, 2026Solar, 7.6 kWInstallation of a 5.280 kwdc solar system, consisting of (12) JA SOLAR JAM54D41-440/LR AND (1)…19123not stated
Apr 20, 2026Solar19125not stated
Apr 17, 2026Solar19141not stated
Apr 15, 2026Solar, 4.400 kW19103not stated

What to ask before you hire

About Solar States LLC

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Solar States LLC

Five quick questions. We pass your request to Solar States LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Solar States LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 19143 and 19119

See all 126 panel upgrade electricians in Philadelphia, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.