contractors.fyi
Sign in

Stahl Electric Inc

Panel upgrade electrician working in Philadelphia.

  • License active

52 jobs on Philadelphia permits, 2021 to 2026: 47 panel upgrades, 5 EV charger installations. 30th most panel upgrade permits of 126 contractors in Philadelphia.

What the public records show

From the city's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 18242, active in the city's records on Sep 24, 2026ContractorChecks out
Jobs on record52 jobs on Philadelphia permits, 2021 to 2026: 47 panel upgrades, 5 EV charger installations30th most panel upgrade permits of 126 licensed contractors in Philadelphia. That counts jobs, not quality.Our Philadelphia permit records cover September 2021 to September 2026.

Records: the city Department of Licenses and Inspections and City of Philadelphia permits.

Cost and timing

Permit timeline

Across Philadelphia, a panel upgrade permit stays open about about 3 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

10 jobs in the last 12 months, down from 15 the year before

Q3 2021: 1 jobQ4 2021: 4 jobsQ1 2022: 1 jobQ2 2022: 2 jobsQ3 2022: 2 jobsQ1 2023: 4 jobsQ2 2023: 4 jobsQ3 2023: 2 jobsQ2 2024: 4 jobsQ3 2024: 5 jobsQ4 2024: 2 jobsQ1 2025: 4 jobsQ2 2025: 1 jobQ3 2025: 6 jobsQ4 2025: 2 jobsQ1 2026: 1 jobQ2 2026: 3 jobsQ3 2026: 4 jobsBusiest: 6 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 6 jobs, July to September 2025. Across Philadelphia, all contractors together had 0% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 1911917 jobs
  • 1911813 jobs
  • 191298 jobs
  • 191272 jobs
  • 191062 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 22, 2026Panel upgradeNo details on the permit19119not stated
Sep 22, 2026EV chargerNo details on the permit19119not stated
Sep 21, 2026Panel upgradeNo details on the permit19127not stated
Sep 10, 2026Panel upgradeNo details on the permit19118not stated
Jun 17, 2026Panel upgradeNo details on the permit19119not stated
Jun 16, 2026Panel upgradeNo details on the permit19123not stated
Jun 15, 2026Panel upgradeHallway-replace Federal Pacific panel with 200 amp, 40 position main panel19106not stated
Jan 7, 2026Panel upgradeInstall temporary 200 amp service19118not stated
Nov 18, 2025Panel upgradeNo details on the permit19119not stated
Nov 6, 2025Panel upgradeNo details on the permit19118not stated
Sep 18, 2025EV chargerNo details on the permit19119not stated
Sep 2, 2025Panel upgradeNo details on the permit19119not stated
Aug 6, 2025Panel upgradeReplace service to a 200 amp service with a 60 position breaker box. Including cable and meter…19126not stated
Aug 4, 2025Panel upgradeNo details on the permit19118not stated
Jul 24, 2025EV chargerFront of house-install 240 volt, 60 amp receptacle for car charger19118not stated
Jul 3, 2025Panel upgradeNo details on the permit19129not stated
May 22, 2025Panel upgrade1 Install new 30 amp 240 volt line to pump house Digging about 180' feet and through 5' stone…19118not stated
Mar 19, 2025Panel upgradeReplace service to a 200 amp service with a 40 position breaker box. Including cable and meter…19119not stated
Feb 20, 2025Panel upgradeInstall 100 amp subpanel19118not stated
Feb 17, 2025Panel upgradeNo details on the permit19111not stated
Jan 28, 2025Panel upgradeReplace service to a 200 amp service with a 40/ 60 position breaker box19129not stated
Dec 2, 2024Panel upgradeInstall 200 amp electrical service with proper grounding and bonding19119not stated
Nov 18, 2024Panel upgradeMove and reuse existing 200 amp panel to the right ( away from gas pipe) and extend wires as needed19144not stated
Sep 24, 2024Panel upgradeBasement-Supply and replace 200 amp two gang meter socket Supply and replace existing 100 amp panel…19129not stated
Sep 24, 2024Panel upgradeNo details on the permit19143not stated
Aug 29, 2024Panel upgradeReplace subpanel in garage19126not stated
Jul 25, 2024Panel upgradeNo details on the permit19119not stated
Jul 2, 2024Panel upgrade1st Floor Kitchen and Laundry 9 Install AFCI protected receptacles 11 Install switches 8 Install 3…19118not stated
May 21, 2024Panel upgradeNo details on the permit19119not stated
May 8, 2024Panel upgradeReplace 200 amp service with a 40 position breaker box including cable and meter box19119not stated
Apr 17, 2024Panel upgradeNo details on the permit19128not stated
Apr 2, 2024Panel upgradeReplace service to a 100 amp service with a 20/30 position breaker box. Including cable and meter…19129not stated
Sep 27, 2023Panel upgradeNo details on the permit19129not stated
Jul 17, 2023Panel upgrade, 22 kWOption #1- Generator will be by sun porch Install wiring in pipe to 22 KW Generator (supplied by…19118not stated
Jun 14, 2023Panel upgradeKitchen-install 50 amp 240 volt receptacle for electric oven, wiring through base cabinet19125not stated
May 30, 2023Panel upgradeBasement- Supply and install 2 gang meter socket above end box from PECO Supply and install 40-60…19118not stated
May 8, 2023EV chargerGarage-install 50 amp receptacle for car charger, powered by sub meter in basement19106not stated
May 4, 2023Panel upgradeNo details on the permit19118not stated
Feb 23, 2023Panel upgradeNo details on the permit19119not stated
Feb 14, 2023Panel upgradeNo details on the permit19119not stated

What to ask before you hire

About Stahl Electric Inc

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Stahl Electric Inc

Five quick questions. We pass your request to Stahl Electric Inc.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Stahl Electric Inc. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 19119 and 19118

See all 126 panel upgrade electricians in Philadelphia, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.