contractors.fyi
Sign in

Johlco

ADU builder working in Raleigh.

  • Raleigh publishes no contractor license list we can check

14 jobs on Raleigh permits, 2023 to 2026: 7 ADUs, 4 remodels, 3 home additions. 5th most ADU permits of 21 contractors in Raleigh.

What the public records show

From the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Raleigh publishes no contractor license list we can checkThat says nothing about this business either way.Ask them
Jobs on record14 jobs on Raleigh permits, 2023 to 2026: 7 ADUs, 4 remodels, 3 home additions5th most ADU permits of 21 contractors in Raleigh. That counts jobs, not quality.Our Raleigh permit records cover October 2021 to September 2026.

Records: City of Raleigh permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $225,312 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What ADU jobs cost in Raleigh.

Get 2 or 3 written quotes.

Track record

4 jobs in the last 12 months, down from 5 the year before

Q1 2023: 1 jobQ4 2023: 2 jobsQ1 2024: 1 jobQ3 2024: 1 jobQ4 2024: 2 jobsQ1 2025: 1 jobQ3 2025: 2 jobsQ2 2026: 1 jobQ3 2026: 3 jobsBusiest: 3 jobs2023202420252026
Each bar is 3 months of permits. The tallest is 3 jobs, July to September 2026. Across Raleigh, all contractors together had 31% more ADU jobs in the last 12 months than in the 12 months before.

Where they work most

  • 276103 jobs
  • 276093 jobs
  • 276133 jobs
  • 276062 jobs
  • 276121 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 16, 2026ADU2 Story ADU in Frequent Transit Zone ADU27610$184,932
Aug 18, 2026Addition2 Story Addition to Rear of Building ADDITION27612$178,045
Jul 9, 2026Addition2 Story Addition in Rear of Existing Building27609$317,824
May 1, 2026ADUTwo Story ADU (DEMO-025164-2025). 1004 1/2 S Person St Unit 101 and Unit 201. 8/25/26:JM: I have…27601$245,480
Aug 7, 2025ADUREVISED 3/5/25: (Removed ADU, only New Duplex) Initial Description : Construct New Duplex and attach27606$686,920
Aug 4, 2025ADUNo details on the permit27610$225,312
Feb 6, 2025RemodelWe will be remodeling bathrooms, kitchen, removing non structural wall between kitchen and living ro27613$68,640
Oct 23, 2024RemodelThe scope of work for the 721 Currituck remodel includes replacing drywall and upgrading the…27609$317,151
Oct 23, 2024AdditionThe scope of work for the 721 Currituck remodel includes replacing drywall and upgrading the…27609$317,151
Jul 23, 2024ADUFOR RENT ADU's Build Stacked ADU's at the rear on Method Street Lot27607$232,176
Jan 11, 2024RemodelInterior remodel: remove wall between living room and kitchen, add half bath downstairs27606$36,280
Nov 28, 2023RemodelFOR RENT ADU - Remodeling the existing garage into an attached ADU to the primary home27613$144,820
Nov 28, 2023ADUFOR RENT ADU - Remodeling the existing garage into an attached ADU to the primary home27613$144,820
Feb 27, 2023ADUFOR RENT ADU Lansing Crawl Verify soffit per 2018 NCRC R302.1.1 ADU27610$96,221

What to ask before you hire

About Johlco

  • Ask for their license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any ADU builder

  • Can you show me proof of liability insurance and your bond?
  • Do you handle the plans, engineering and utility hookups, or do I?
  • How long from permit to the final inspection on your last three ADUs?
  • What is the payment schedule, and what is extra?

Get a quote from Johlco

Five quick questions. We pass your request to Johlco.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Johlco. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More ADU builders near 27610 and 27609

See all 21 ADU builders in Raleigh, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.