contractors.fyi
Sign in

Barnard Electric

Solar installer working in Sacramento.

  • No license matched this business by name in the state's records

33 jobs on Sacramento permits, 2021 to 2024: 32 solar installations, 1 panel upgrade. 19th most solar system permits of 138 contractors in Sacramento.

What the public records show

From the city's permits, one question at a time.

QuestionRecords showMark
Licensed?No license matched this business by name in the state's recordsAsk them
Jobs on record33 jobs on Sacramento permits, 2021 to 2024: 32 solar installations, 1 panel upgrade19th most solar system permits of 138 contractors in Sacramento. That counts jobs, not quality.Our Sacramento permit records cover September 2021 to August 2026.

Records: City of Sacramento permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $13,720 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What solar system jobs cost in Sacramento.

Get 2 or 3 written quotes.

Track record

Jobs per quarter

Q4 2021: 3 jobsQ1 2022: 2 jobsQ2 2022: 6 jobsQ3 2022: 9 jobsQ4 2022: 8 jobsQ1 2023: 1 jobQ2 2023: 3 jobsQ1 2024: 1 jobBusiest: 9 jobsLatest: 1 job202220232024
Each bar is 3 months of permits. The tallest is 9 jobs, July to September 2022.

Where they work most

  • 958226 jobs
  • 958385 jobs
  • 958204 jobs
  • 958314 jobs
  • 958352 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jan 10, 2024Panel upgradeE-Permit: existing 100 A service - Overhead service, new main panel 200 Amps, Replacement weather…95820$2,501
May 9, 2023Solar, 7.6 kW7.6 kw Solar PV System, and 0gal Solar WH System (water heater installed null) & Panel Upgrade95831$15,200
May 5, 2023Solar, 5.8 kW95816$11,600
Apr 20, 2023Solar, 12.8 kW95831$25,600
Jan 11, 2023Solar, 4.015 kW95831$8,030
Nov 10, 2022Solar, 2.19 kW95838$4,380
Nov 9, 2022Solar, 9.125 kW9.125kw Solar PV System & ESS 10KW, & De rated main breaker and 0gal Solar WH System (water heater…95819$28,250
Oct 21, 2022Solar, 11.32 kW95826$25,630
Oct 14, 2022Solar, 7.3 kW95835$24,600
Oct 14, 2022Solar, 6.2 kW6.2kw Solar PV System, MPU, and 0gal Solar WH System (water heater installed null). ” REV TO …95822$14,410
Oct 11, 2022Solar, 4.01 kW4.01kw Solar PV System & MPU , and 0gal Solar WH System (water heater installed null). REV TO…95822$10,030
Oct 5, 2022Solar, 3.6 kW95820$8,000
Oct 4, 2022SolarNo details on the permit95822$10,760
Sep 21, 2022Solar, 10.22 kW95823$16,060
Sep 15, 2022Solar, 12.04 kW95838$24,090
Sep 1, 2022Solar, 8.64 kW95833$18,000
Sep 1, 2022Solar, 8.39 kW95832$16,790
Aug 29, 2022Solar, 4.68 kW95834$9,360
Aug 29, 2022Solar, 6.4 kW95831$14,800
Aug 18, 2022Solar, 4.8 kW95822$9,600
Aug 4, 2022Solar, 5.6 kW5.6kw Solar PV System, & MPU, and 0gal Solar WH System (water heater installed null)95820$13,200
Jul 27, 2022Solar, 6 kW6kw Solar PV System, and 0gal Solar WH System (water heater installed null)95818$12,000
Jun 30, 2022Solar, 3.96 kW95815$7,920
Jun 27, 2022Solar, 12.4 kW95838$24,800
Jun 27, 2022Solar, 4.32 kW95835$8,640
Jun 16, 2022Solar, 6.12 kW6.12kw Solar PV System, & MPU and 0gal Solar WH System (water heater installed null)95838$14,240
Jun 16, 2022Solar, 3.24 kW3.24kw Solar PV System, & MPY and 0gal Solar WH System (water heater installed null). ”95838$8,480
Apr 6, 2022Solar, 7.2 kW7.2kw Solar PV System, changing out existing 100amp service with 100amp main breaker to new 100amp…95820$16,900
Mar 23, 2022Solar, 3.6 kWInstall 3.6kw Solar PV System, and Panel Upgrad- hanging out existing service to new 125amp solar…95823$7,200
Mar 14, 2022Solar, 7.56 kW95815$15,000
Nov 3, 2021Solar, 7.35 kW95822$17,500
Oct 8, 2021Solar, 5325 kW5325kw Solar PV System, and 0gal Solar WH System (water heater installed null)95832$12,000
Oct 5, 2021Solar, 5.25 kW95822$12,000

What to ask before you hire

About Barnard Electric

  • Ask for the license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Barnard Electric

Five quick questions. We pass your request to Barnard Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Barnard Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers near 95822 and 95838

See all 138 solar installers in Sacramento, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.