contractors.fyi
Sign in

Green Day Power

Solar installer working in Sacramento.

  • No license matched this business by name in the state's records

33 jobs on Sacramento permits, 2021 to 2024: 29 solar installations, 3 roofing jobs, 1 panel upgrade. 21st most solar system permits of 138 contractors in Sacramento.

What the public records show

From the city's permits, one question at a time.

QuestionRecords showMark
Licensed?No license matched this business by name in the state's recordsAsk them
Jobs on record33 jobs on Sacramento permits, 2021 to 2024: 29 solar installations, 3 roofing jobs, 1 panel upgrade21st most solar system permits of 138 contractors in Sacramento. That counts jobs, not quality.Our Sacramento permit records cover September 2021 to August 2026.Of their 29 solar system permits, 3 mention a battery.

Records: City of Sacramento permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $16,842 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What solar system jobs cost in Sacramento.

Get 2 or 3 written quotes.

Track record

Jobs per quarter

Q4 2021: 8 jobsQ1 2022: 11 jobsQ2 2022: 2 jobsQ4 2022: 1 jobQ1 2023: 3 jobsQ2 2023: 6 jobsQ4 2023: 1 jobQ1 2024: 1 jobBusiest: 11 jobsLatest: 1 job202220232024
Each bar is 3 months of permits. The tallest is 11 jobs, January to March 2022.

Where they work most

  • 958228 jobs
  • 958206 jobs
  • 958385 jobs
  • 958192 jobs
  • 958182 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jan 4, 2024Solar, 7.29 kW95819$37,950
Nov 9, 2023Solar13.5 kWh Energy storage system with a Tesla Powerwall 13.5 kWh battery, a Tesla Gateway, and a 125A…95818$17,400
Jun 26, 2023Solar, 5.6 kW95822$11,228
Jun 21, 2023Reroof, 22 squares (2,200 sq ft)95822$19,403
May 23, 2023Solar, 2.370 kW95815$9,663
May 12, 2023Solar, 8.8 kW95820$47,538
Apr 24, 2023Solar, 3.160 kW95834$12,700
Apr 5, 2023Solar, 4.345 kW95834$17,597
Mar 7, 2023Reroof, 28 squares (2,800 sq ft)95822$20,720
Feb 27, 2023Solar, 2.8 kW95820$12,600
Jan 11, 2023Solar, 8.295 kW95818$35,751
Dec 27, 2022Solar, 5.135 kW95822$22,742
Jun 2, 2022Panel upgradeAA: existing 125 A service - Underground service, new main panel 125 Amps, N/A weather…95838$2,000
Apr 13, 2022Solar, 7.2 kW95822$14,436
Mar 22, 2022Solar, 8.4 kWInstall 8.4kw Roof Top Solar PV System95816$16,842
Mar 18, 2022Solar, 6.4 kW95822$12,832
Mar 7, 2022Solar, 2.36 kW95817$8,800
Mar 6, 2022Solar, 5.07 kW5.07kw Solar PV System95835$10,165
Mar 3, 2022Solar, 4.4 kW95838$11,822
Mar 3, 2022Solar, 8.4 kW95815$16,842
Mar 3, 2022Solar, 4.4 kW95820$8,822
Feb 17, 2022Solar, 10 kW10kw Solar PV System, and 0gal Solar WH System (water heater installed null). ”95838$20,350
Jan 24, 2022Solar, 7.6 kW7.6kw Solar PV System,& UMP 100A TO 125 W/ 225 BUS BAR and 0gal Solar WH System (water heater…95826$17,238
Jan 6, 2022Solar, 3.24 kW95820$17,600
Jan 3, 2022Solar, 2.160 kW95820$4,331
Dec 13, 2021Reroof, 30 squares (3,000 sq ft)95826$9,000
Dec 1, 2021Solar, 4.23 kWInstall 4.23kw Solar PV System, and 0gal Solar WH System (water heater installed null)95838$18,000
Nov 24, 2021Solar, 5.04 kW95822$10,105
Nov 12, 2021Solar, 7.67 kW95820$33,684
Nov 4, 2021Solar, 4.76 kW4.76kw Solar PV System95817$9,544
Oct 20, 2021SolarEPC - Install 10.5 kwh Emphase back-up battery control unit95822$17,000
Oct 14, 2021Solar, 8.45 kW95838$18,942
Oct 12, 2021Solar, 5.525 kW95819$18,737

What to ask before you hire

About Green Day Power

  • Ask for the license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Green Day Power

Five quick questions. We pass your request to Green Day Power.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Green Day Power. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers near 95822 and 95820

See all 138 solar installers in Sacramento, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.