Gto Contractors Inc

, mostly remodel work

  • 15 jobs in Sacramento, 2021 to 2026
  • Typical permit value $100,000

Sacramento publishes no contractor license list we can check, so this page counts permits only. Ask for the license number and check it with the state before you hire.

Jobs by type of work

Most recent jobs

DateWorkZIPStated value
2026-04-22RemodelEPC - HDB 25-027915 - New 705 SQ. FT. addition to the existing house and remodel existing house kitchen, bathroom, and laundry per plans. 95822$120,414
2026-04-22AdditionEPC - HDB 25-027915 - New 705 SQ. FT. addition to the existing house and remodel existing house kitchen, bathroom, and laundry per plans. 95822$120,414
2025-08-18ADUEPC - ATTACHED ADU UNIT WITH ONE BEDROOM, ONE BATHROOM, KITCHEN/DINING/LIVING ROOM WITH 174 SQ FT COVERED PATIO AND MINI SPLIT. “Any 95815$101,404
2025-08-18Heat pumpEPC - ATTACHED ADU UNIT WITH ONE BEDROOM, ONE BATHROOM, KITCHEN/DINING/LIVING ROOM WITH 174 SQ FT COVERED PATIO AND MINI SPLIT. “Any 95815$101,404
2025-05-19ReroofREROOF. "Tear off existing composition roofing and replace with new composition material on existing sheathing," E-Permit: Tear Off - Yes, 95818$6,000
2024-07-10RemodelBathroom Remodel Permit: Replace tub/shower, toilet, sink/vanity, tile and light/fan fixtures. Remodel construction is replace in kind the95816$3,400
2024-05-07Panel upgradeTransfer Electrical main drop from over head to underground sub feed. Main electrical panel to remain as Sub panel and Smud meter to be drop95816$2,500
2024-03-14RemodelRemodel upstairs hall bathroom and master bathroom repipe all plumbing in existing locations in both bathrooms, update electrical to code, a95818$25,000
2024-01-29ADUEPC - Duplex ADU 2-story: 1st floor 246 sqft garage, 474 sqft ADU (1 bed, 1 bath). 2nd floor 720 sqft ADU (2 bed, 1 bath). 18 sqft exterior95816$214,222
2023-05-03ReroofE-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 17 squares of 30yr Laminated Dimensional Composition. In-progress inspection required if95822$6,000
2023-04-28ADURESIDENTIAL ELECTRICAL METER PANEL CHANGE OUT ON 3974 AND 3976 CHANGE OUT 100 AMP TO NEW 100 AMP AND ADD NEW 100 AMP FOR NEW ADU. ADU IS ON 95819$3,000
2023-04-28Panel upgradeRESIDENTIAL ELECTRICAL METER PANEL CHANGE OUT ON 3974 AND 3976 CHANGE OUT 100 AMP TO NEW 100 AMP AND ADD NEW 100 AMP FOR NEW ADU. ADU IS ON 95819$3,000

More remodeling contractors near 95816

Get quotes from up to 3 remodeling contractors

Tell us about the job. Within one business day we email you up to 3 contractors who do this work near your ZIP code, and pass your request to them. You decide who to hire.

When do you want to start?

We got your request

Within one business day we will email you up to 3 contractors who fit, and pass your request to them.

Paying for your remodel

Most people use a home equity line, a personal loan or the contractor's own financing. Compare the three.

A bright remodeled kitchen with a marble island and woven stoolsSee all 194 remodeling contractorsRanked by jobs in Sacramento