Illuminate Electric Solutions LLC
, mostly ev charger work
- 34 jobs in Sacramento, 2024 to 2026
- Typical permit value $1,750
- 25 of 34 jobs are EV chargers
Sacramento publishes no contractor license list we can check, so this page counts permits only. Ask for the license number and check it with the state before you hire.
Jobs by type of work
Most recent jobs
| Date | Work | ZIP |
|---|---|---|
| 2026-08-21 | EV chargerEV Charger Permit: Install EVCS in garage area. Water conserving fixtures are required to be installed throughout this residence per SB 40 | 95831 |
| 2026-08-13 | EV chargerEPC - EV Charger Permit: Install EV chargers outside. Water conserving fixtures are required to be installed throughout this residence per | 95817 |
| 2026-08-13 | EV chargerEPC - EV Charger Permit: Install EV chargers inside the garage. Water conserving fixtures are required to be installed throughout this resi | 95831 |
| 2026-08-06 | EV chargerEPC - EV Charger Permit: Install EVCS in garage area. Water conserving fixtures are required to be installed throughout this residence per | 95835 |
| 2026-04-05 | Panel upgradeE-Permit: existing 200 A service - Overhead service, new main panel 200 Amps, Replacement weather head/masthead work. | 95819 |
| 2026-03-15 | Panel upgradeE-Permit: existing 100 A service - Overhead service, new main panel 200 Amps, New Install weather head/masthead work. | 95822 |
| 2026-02-05 | Panel upgradeEPC - Upgrade electrical panel from 100amps to 200amps, install Tesla wall connector (EV Charger). Water conserving fixtures are required | 95838 |
| 2026-02-05 | EV chargerEPC - Upgrade electrical panel from 100amps to 200amps, install Tesla wall connector (EV Charger). Water conserving fixtures are required | 95838 |
| 2026-01-28 | Panel upgradeE-Permit: existing 100 A service - Overhead service, new main panel 200 Amps, Replacement weather head/masthead work. | 95838 |
| 2025-12-26 | Panel upgradeInstall EV charger next to main electrical panel located outside. Water conserving fixtures are required to be installed throughout this res | 95816 |
| 2025-12-26 | EV chargerInstall EV charger next to main electrical panel located outside. Water conserving fixtures are required to be installed throughout this res | 95816 |
| 2025-11-30 | Panel upgradeE-Permit: existing 150 A service - Overhead service, new main panel 200 Amps, Replacement weather head/masthead work, rewiring 1244 sq ft. | 95818 |
More EV charger installers near 95831
- Connected Technology
- Bear Copper Electric
- High Energy Electric
- Sagan Electric
- Phe Inc
- E V Electric Residential LLC
Get quotes from up to 3 EV charger installers
Tell us about the job. Within one business day we email you up to 3 contractors who do this work near your ZIP code, and pass your request to them. You decide who to hire.
We got your request
Within one business day we will email you up to 3 contractors who fit, and pass your request to them.
Paying for your EV charger
Most people use a home equity line, a personal loan or the contractor's own financing. Compare the three.
See all 71 EV charger installersRanked by jobs in Sacramento