contractors.fyi
Sign in

Imkat Construction Corp

ADU builder working in Sacramento. Licensed since 2022.

  • License active
  • Workers' comp on file

60 jobs on Sacramento permits, 2021 to 2026: 51 ADUs, 5 remodels, 2 panel upgrades, 2 home additions. 2nd most ADU permits of 47 contractors in Sacramento.

What the records show vs. what they say

The public record next to the business's own words.

QuestionRecords showThey sayMark
Licensed?License 1094866, active in the state's records on Sep 23, 2026General buildingNo disciplinary case on the state's file.We found this license by the business name. No other active license has that name.Shows license 1094866 on its websiteChecks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2022
Jobs on record60 jobs on Sacramento permits, 2021 to 2026: 51 ADUs, 5 remodels, 2 panel upgrades, 2 home additions2nd most ADU permits of 47 contractors in Sacramento. That counts jobs, not quality.Our Sacramento permit records cover September 2021 to August 2026.

In their words

  • Services: ADU design engineering and construction, Detached ADUs, Attached ADUs, Garage conversions
    and 4 morePool house ADUs, Tiny homes, Retirement ADUs, Pre-construction (design engineering permitting)
  • Offers $5000 discount on custom ADUs (limited-time promotion)
  • Has offices in Sacramento and Pleasanton
  • Certified: BBB Accredited Business (a maker's or trade group's program; each lists its members on its own website)
  • Certified: HomeAdvisor Top Rated
  • Certified: SRBX certified
  • Works in: Sacramento, Bay Area, Alameda, Antioch, Berkeley, Concord, Cupertino, Danville and 9 more

Records: the state license board and City of Sacramento permits. They say: imkatconstruction.com, read October 2026, summed up by us. We checked the site is theirs (it shows their license on record). We have not checked that the claims are true.

Cost and timing

Permit value (not a price)

Their typical permit lists $180,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. Kitchen jobs alone: typical permit $221,030 (8 permits, a small sample). What ADU jobs cost in Sacramento.

Get 2 or 3 written quotes.

Track record

27 jobs in the last 12 months, up from 17 the year before

Q4 2021: 2 jobsQ2 2023: 2 jobsQ3 2023: 3 jobsQ4 2023: 3 jobsQ1 2024: 1 jobQ2 2024: 1 jobQ3 2024: 8 jobsQ4 2024: 2 jobsQ1 2025: 3 jobsQ2 2025: 6 jobsQ3 2025: 6 jobsQ4 2025: 5 jobsQ1 2026: 11 jobsQ2 2026: 5 jobsQ3 2026: 2 jobsBusiest: 11 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 11 jobs, January to March 2026. Across Sacramento, all contractors together had 17% more ADU jobs in the last 12 months than in the 12 months before.

Where they work most

  • 9581812 jobs
  • 958228 jobs
  • 958207 jobs
  • 958177 jobs
  • 958195 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Aug 11, 2026ADUEXPEDITED - EPC - New 462 sf with 68 sf porch 1 bed 1 bath detached ADU with laundry, full kitchen…95822$109,091
Jul 7, 2026ADUEXPEDITED - EPC - Build a new 748 sf 2 bed 2 bath detached ADU with solar95820$151,500
Jun 29, 2026ADU, 719 sq ftEPC - EXPEDITED - ATTACHED ADU SINGLE STORY 719 SQ. FT. WITH 9 SQ FT UTILITY CLOSET. 2 BEDROOM 1…95832$133,552
Jun 18, 2026ADU, 599 sq ftEpc - expedited - commercial meter setup duplex adu first floor unit 1 599 sq ft, porch /stair 84…95831$208,770
Jun 15, 2026ADUEPC - EXPEDITED - Build a new 749sf 1 bed 1.5 bath detached ADU with full kitchen in place of…95815$151,007
May 8, 2026ADU, 493 sq ftEPC - EXPEDITED - NEW DETACHED ADU (493 SQ. FT.) PORCH 136 SQ. FT.UTILITY AREA: 7.5 SQ. FT. 1 Bed…95831$121,066
May 4, 2026ADUEPC - EXPEDITED - Build a new 1,119 sf 2-unit ADU Duplex with 1-bed 1-bath each, detached ADU with…95818$299,945
Mar 30, 2026ADU, 601 sq ftEpc - expedited - 601 sq ft adu95833$124,552
Mar 20, 2026ADU, 440 sq ftEPC - EXPEDITED - ADU conditioned 440 sq ft , utility room 8 sq ft and 45 sq ft porch95820$111,218
Mar 19, 2026Remodel, 170 sq ftRemodel Permit Removal of a 170 sq95820$1,000
Mar 19, 2026ADU, 170 sq ftRemodel Permit Removal of a 170 sq95820$1,000
Mar 13, 2026ADUEPC - EXPEDITED - Build a new 701 sf 2 bed 1 bath detached ADU with full kitchen and laundry95834$125,526
Feb 26, 2026ADU, 516 sq ftEPC - EXPEDITED - 516 sq ft ADU, 92 sq ft porch95820$106,714
Feb 19, 2026ADU, 7 sq ftEPC - EXPEDITED - Build a new 493 sf 1 bed 1 bath detached ADU with full kitchen95820$162,059
Jan 27, 2026ADUEPC - EXPEDITED - DUPLEX ADU Build a new 1200 sf 2 unit detached 2 STORY ADU. Each unit will be…95818$304,715
Jan 20, 2026Panel upgradeE-Permit: existing 100 A service - Underground service, new main panel 200 Amps, N/A weather…95818$2,111
Jan 15, 2026ADU, 474 sq ftEPC - EXPEDITED - NEW CONSTRUCTION OF A 474 SQ. FT. ADU. Proposed 474 SQ.FT LIVABLE. Utility…95816$163,578
Jan 12, 2026ADU, 2.46 kWEPC - EXPEDITED - Construction of 2 BED/1BATH 900 SF 2 STORY DETACHED ADU, ALL ELECTRIC WITH 2.46KW…95817$260,929
Dec 3, 2025ADU, 2.05 kWEPC - EXPEDITED - Build a new 400 sf 1 bed 1 bath ADU above new 400 sf garage with 48 sf deck and…95817$200,000
Nov 7, 2025ADU, 480 sq ftExpedited - epc - demolition of existing structure under a separate permit, and construction of a 1…95819$180,000
Oct 29, 2025ADUEPC - EXPEDITED - Shared Plans (2) Build a new all electric 1200 sf ADU duplex95818$329,400
Oct 21, 2025ADUEPC - EXPEDITED - DETACHED ADU 798 SF. 2 Bedrooms, 2 Bathrooms, Front Porch 126 S/F. All electric95822$230,286
Oct 3, 2025ADUEXPEDITED - EPC - New construction of a 1 bed, 1 bath detached 690 sf ADU with a 10 sf…95817$180,000
Sep 23, 2025ADUEPC - EXPEDITED - New construction of a detached 1 bed, 1 bath 432 sf ADU with a 45 sf uncovered…95818$150,000
Sep 12, 2025ADUEPC - Construct a new 2 bed, 2 bath, 840 SF ADU with Solar95822$240,937
Sep 11, 2025ADUEPC - EXPEDITED - New Construction of a detached 1078 SF Two-Story ADU with two dwellings. Ground…95811$326,990
Aug 26, 2025ADU, 200 sq ftEPC - Build new ADUs (2) stacked95816$280,000
Jul 28, 2025ADU, 345 squares (34,500 sq ft)EPC - EXPEDITED - 1st floor 345 sq f , 2nd floor 197 sq ft total 542 SF 2-story ADU. Solar exempt95818$216,715
Jul 1, 2025ADUEPC - EXPEDITED - New detached 2-story duplex ADU, 1200 SF total95816$318,160
May 27, 2025ADU, 650 squares (65,000 sq ft)EPC - New construction of a detached 2 bed, 1 bath 650 sq ADU with 2.46 PV solar95822$179,470
Apr 30, 2025ADU, 12 sq ftEPC - New 2 bed, 1 bath 585 SQF ADU with 12 sq ft utility room and 2.87 kw PV system95815$164,214
Apr 16, 2025ADUEPC - New construction of a 490-sqft detached ADU, 10-sqft utility closet, and 30-sqft porch cover95820$168,285
Apr 16, 2025ADU, 583 sq ftEPC - New construction of a 1 bed, 1 bath detached ADU 583 sq ft95819$185,978
Apr 14, 2025ADUEPC - 1 bed, 1 bath 569 SF ADU. Water conserving fixtures are required to be installed…95823$181,087
Apr 9, 2025ADU, 747 sq ftEPC - SHELF READY ADU. HABITABLE LIVING AREA: 747 SQ FT / COVERED PORCH: 44 SQ FT / UTILITY…95818$165,000
Jan 30, 2025ADU, 597 sq ftEPC - New 2-Story Detached ADU including two ADU's each 2 bed, 1 bath 597 square feet for a total…95822$201,841
Jan 14, 2025ADU, 747 sq ftEPC - SHELF READY ADU PLANS HABITABLE LIVING AREA: 747 SQ FT COVERED PORCH: 44 SQ FT UTILITY…95817$195,334
Jan 2, 2025ADUEPC - Install new detached ADU 597 SQF and Second level 597 SQF 2 bedroom and 1 bathroom -…95811$200,280
Nov 20, 2024RemodelKitchen Remodel, Bathroom remodel, Minor plumbing, Minor electrical, New Tankless water heater,…95822$40,000
Nov 14, 2024ADU, 1198 sq ftEPC - New detached 1198 sq95818$205,477

What to ask before you hire

About Imkat Construction Corp

  • Ask what the warranty covers and for how long, in writing.
  • Check each certification on the maker's or group's own website. Contractors must renew them.

Worth asking any ADU builder

  • Can you show me proof of liability insurance and your bond?
  • Do you handle the plans, engineering and utility hookups, or do I?
  • How long from permit to the final inspection on your last three ADUs?
  • What is the payment schedule, and what is extra?

Get a quote from Imkat Construction Corp

Five quick questions. We pass your request to Imkat Construction Corp.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Imkat Construction Corp. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More ADU builders near 95818 and 95822

See all 47 ADU builders in Sacramento, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.