contractors.fyi
Sign in

Rios & Burke Electric Inc

EV charger installer working in Sacramento. Licensed since 2021.

  • License active
  • Workers' comp on file

47 jobs on Sacramento permits, 2024 to 2026: 28 EV charger installations, 18 panel upgrades, 1 solar installation. 17th most EV charger permits of 71 contractors in Sacramento.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1079349, active in the state's records on Sep 23, 2026General building, electricalNo disciplinary case on the state's file.We found this license by the business name. No other active license has that name.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2021
Jobs on record47 jobs on Sacramento permits, 2024 to 2026: 28 EV charger installations, 18 panel upgrades, 1 solar installation17th most EV charger permits of 71 contractors in Sacramento. That counts jobs, not quality.Our Sacramento permit records cover September 2021 to August 2026.Of their 28 EV charger permits, 6 mention a panel upgrade.

Records: the state license board and City of Sacramento permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $1,312 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What EV charger jobs cost in Sacramento.

Get 2 or 3 written quotes.

Track record

22 jobs in the last 12 months, up from 18 the year before

Q2 2024: 6 jobsQ3 2024: 2 jobsQ4 2024: 5 jobsQ1 2025: 3 jobsQ2 2025: 5 jobsQ3 2025: 5 jobsQ4 2025: 1 jobQ1 2026: 3 jobsQ2 2026: 8 jobsQ3 2026: 9 jobsBusiest: 9 jobs20252026
Each bar is 3 months of permits. The tallest is 9 jobs, July to September 2026. Across Sacramento, all contractors together had 14% fewer EV charger jobs in the last 12 months than in the 12 months before.

Where they work most

  • 9583511 jobs
  • 958319 jobs
  • 958225 jobs
  • 958164 jobs
  • 958184 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Aug 21, 2026EV charger40a ev circuit for level two plug in EV charger95816$1,950
Aug 21, 2026Panel upgradeEVSE backside panel in garage 40A max95838$1,250
Aug 21, 2026EV chargerEVSE backside panel in garage 40A max95838$1,250
Aug 18, 2026Solar, 0 kW0kw Solar PV System, 13.5 kw PV Storage System Size and 0gal Solar WH System (water heater…95818$20,000
Jul 27, 2026Panel upgradeAA: - Overhead service, main breaker replacement95816$10,000
Jul 10, 2026Panel upgradeEPC - EVSE 40a hardwired garage backside panel95835$1,000
Jul 10, 2026EV chargerEPC - EVSE 40a hardwired garage backside panel95835$1,000
Jul 9, 2026Panel upgrade95822$5,000
Jul 9, 2026Panel upgrade95815$4,275
Jun 15, 2026EV chargerEVSE hardwired in garage 40A max95835$2,300
Jun 2, 2026Panel upgradeLvl 1 20A EVSE . Lvl 2 40a EVSE  both in garage feed from 200A main panel95831$3,000
Jun 2, 2026EV chargerLvl 1 20A EVSE . Lvl 2 40a EVSE  both in garage feed from 200A main panel95831$3,000
May 14, 2026Panel upgradeEVSE hardwired in garage 40A. EVSE hardwired charger approximately 60ft away from 200-amp panel95831$2,300
May 14, 2026EV chargerEVSE hardwired in garage 40A. EVSE hardwired charger approximately 60ft away from 200-amp panel95831$2,300
May 13, 2026Panel upgradeEVSE hardwired charger approximately 60ft away from 200-amp panel95831$2,300
May 13, 2026EV chargerEVSE hardwired charger approximately 60ft away from 200-amp panel95831$2,300
May 13, 2026Panel upgradeE-Permit: existing 125 A service - Underground service, new main panel 125 Amps, N/A weather…95833$5,050
Mar 24, 2026Panel upgrade95831$2,461
Mar 3, 2026EV chargerEPC - EVSE 32A. Water conserving fixtures are required to be installed throughout this residence…95818not stated
Jan 13, 2026EV chargerEVSE Hardwired Charger95825not stated
Oct 2, 2025Panel upgrade95822$13,500
Aug 28, 2025EV chargerInstall EVSE Hardwired Charger95835not stated
Aug 14, 2025Panel upgrade95817$14,375
Jul 29, 2025EV chargerInstall EV charger in garage, hardwired95835not stated
Jul 18, 2025EV chargerInstall EV charger in garage, hardwired95835$1,250
Jul 8, 2025EV chargerInstall EV charger in the garage95831$1,250
Jun 20, 2025EV chargerInstall EV charger in garage95817$1,350
Jun 18, 2025Panel upgrade95817$4,256
Jun 13, 2025EV chargerInstall hardwired EV charger in garage, 32a95835$1,250
Apr 24, 2025EV chargerInstall 32a hardwired EV charger in garage95835$1,028
Apr 14, 2025EV chargerInstall 32a hardwired EV charger95819$1,275
Mar 27, 2025EV chargerInstall hardwired EV Charger on exterior of home95818$1,422
Mar 3, 2025EV chargerNo details on the permit95835$1,418
Jan 27, 2025EV chargerInstall 32a hardwired EV charger on exterior of home95818not stated
Dec 12, 2024EV chargerInstall 32a hardwired EV charger in garage95816not stated
Nov 14, 2024EV chargerInstall a hardwired 32a evse95835not stated
Nov 14, 2024EV chargerEv charger 32a Tesla Hardwired Ev charger 32a Tesla Hardwired Wall connector95831$1,900
Nov 5, 2024EV chargerInstall a level 2 evse 32A max output95834not stated
Oct 10, 2024EV chargerEV Charger Permit: Install a 32 amp EVSE Nema 14-50R. Water conserving fixtures are required to be…95838$1,200
Sep 13, 2024EV chargerEV Charger Permit: Install a 32A EVSE Nema 14-50R. Water conserving fixtures are required to be…95816$1,200

What to ask before you hire

About Rios & Burke Electric Inc

  • Ask what the warranty covers and for how long, in writing.

Worth asking any EV charger installer

  • Can you show me proof of liability insurance and your bond?
  • Is my panel big enough, or does it need an upgrade first?
  • Where will the wire run, and what does each extra foot cost?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Rios & Burke Electric Inc

Five quick questions. We pass your request to Rios & Burke Electric Inc.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Rios & Burke Electric Inc. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More EV charger installers near 95835 and 95831

See all 71 EV charger installers in Sacramento, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.