328 Construction

Panel upgrade electrician based in Daly City. Licensed since 2004.

  • License active
  • Workers' comp on file

16 jobs on San Francisco permits, 2022 to 2026: 12 panel upgrades, 3 remodels, 1 EV charger installation. 283rd most panel upgrade permits of 1,063 contractors in San Francisco.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 851213, active in the state's records on Sep 23, 2026General building, electrical, plumbingNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2004
Jobs on record16 jobs on San Francisco permits, 2022 to 2026: 12 panel upgrades, 3 remodels, 1 EV charger installationThey are based in Daly City. Work outside San Francisco is not in these records.283rd most panel upgrade permits of 1,063 licensed contractors in San Francisco. That counts jobs, not quality.Our San Francisco permit records cover September 2021 to September 2026.

Records: the state license board and City of San Francisco permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 851213 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $1,500 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in San Francisco.

Get 2 or 3 written quotes.

Permit timeline

Across San Francisco, a panel upgrade permit stays open about 77 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. The permit itself is usually issued the same day. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q3 2022: 1 jobQ4 2022: 2 jobsQ1 2023: 1 jobQ2 2023: 2 jobsQ4 2023: 2 jobsQ1 2024: 4 jobsQ1 2025: 1 jobQ2 2025: 2 jobsQ1 2026: 1 jobBusiest: 4 jobsLatest: 1 job2023202420252026
Each bar is 3 months of permits. The tallest is 4 jobs, January to March 2024.

Where they work most

  • 941225 jobs
  • 941174 jobs
  • 941163 jobs
  • 941312 jobs
  • 941181 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Mar 5, 2026Panel upgradeNew wiring for kitchen and new circuit to bathroom gfci , install smoke detectors, replace and…94131not stated
Jun 13, 2025Panel upgradeReplace weatherhead cap, replace weatherhead wires, and repair corrosion in the panel94122$1,200
May 20, 2025Panel upgradeNew wiring for all new addition construction and upgrade wiring for all existing, electrical…94131not stated
Feb 26, 2025Panel upgradeReplace and relocation of three residential panels for unit 1, 2, 4 replace 1 house panel at garage…94118$3,000
Mar 19, 2024Panel upgrade (×2, same day)New wiring and service upgrade94117not stated
Mar 19, 2024Panel upgradeNew wiring and service upgrade for unit a94117not stated
Mar 19, 2024Panel upgradeNew wiring and service upgrade for unit b94117not stated
Oct 21, 2023Panel upgradeReplace existing electrical panel (100a ) with 100a new panel94116$1,500
Oct 7, 2023EV chargerInstall one 40a ev charger94116not stated
Jun 21, 2023Panel upgradeReplace existing federal pacific panel at existing location with surge protective, fix all loose…94116$5,000
Jun 21, 2023Panel upgradeChange seven existing 70a/2p sub-main breakers to new breakers, replace all federal pacific…94114$1,200
Feb 21, 2023Panel upgradeAdd work scope on electrical permit ew202212167899. add an electrical sub-panel on the garage, new…94122not stated
Dec 14, 2022RemodelG/f add new half bath; 2/f remodel (e) kitchen & bathroom; add (1) new skylight94122$20,000
Oct 27, 2022RemodelRemodeling exisitng bathroom on first floor94122$6,000
Aug 23, 2022RemodelRemodel bathroom on 2nd floor94122$6,000

What to ask before you hire

About 328 Construction

  • Ask what the warranty covers and for how long, in writing.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from 328 Construction

Five quick questions. We pass your request to 328 Construction.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to 328 Construction. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 94122 and 94117

See all 1,063 panel upgrade electricians in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.