contractors.fyi
Sign in

All Bay Solar

Roofing contractor based in San Francisco. Licensed since 2011.

  • License active
  • Workers' comp on file

164 jobs on San Francisco permits, 2021 to 2026: 74 roofing jobs, 73 panel upgrades, 10 solar installations, 7 EV charger installations. 56th most roofing permits of 303 contractors in San Francisco.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 962034, active in the state's records on Sep 23, 2026General building, electrical, roofing, solarNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2011
Jobs on record164 jobs on San Francisco permits, 2021 to 2026: 74 roofing jobs, 73 panel upgrades, 10 solar installations, 7 EV charger installations56th most roofing permits of 303 licensed contractors in San Francisco. That counts jobs, not quality.Our San Francisco permit records cover September 2021 to September 2026.Of their 74 roofing permits, 1 mention a flat or low-slope roof.

Records: the state license board and City of San Francisco permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 962034 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $16,950 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What roofing jobs cost in San Francisco.

Get 2 or 3 written quotes.

Permit timeline

Across San Francisco, a roofing permit stays open about 28 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. The permit itself is usually issued the same day. How long roofing jobs take.

Track record

17 jobs in the last 12 months, down from 32 the year before

Q3 2021: 1 jobQ4 2021: 6 jobsQ1 2022: 12 jobsQ2 2022: 12 jobsQ3 2022: 12 jobsQ4 2022: 8 jobsQ1 2023: 13 jobsQ2 2023: 8 jobsQ3 2023: 4 jobsQ4 2023: 7 jobsQ1 2024: 9 jobsQ2 2024: 13 jobsQ3 2024: 13 jobsQ4 2024: 4 jobsQ1 2025: 6 jobsQ2 2025: 5 jobsQ3 2025: 14 jobsQ4 2025: 3 jobsQ1 2026: 4 jobsQ2 2026: 6 jobsQ3 2026: 4 jobsBusiest: 14 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 14 jobs, July to September 2025. Across San Francisco, all contractors together had 37% fewer new roof jobs in the last 12 months than in the 12 months before.

Where they work most

  • 9411224 jobs
  • 9413123 jobs
  • 9412118 jobs
  • 9411617 jobs
  • 9411016 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 4, 2026Solar, 3.52 kW94115$5,000
Sep 2, 2026EV charger(1) universal wall connector 1734412-xx-y level 2 ev charger94112$1,500
Aug 4, 2026SolarSolar permit: ballasted: n, including 1 energy storage unit, of 240 vac, with 13.5 kwh each in…94131not stated
Jul 8, 2026EV charger, 9.6 kWInstalling an enphase iq ev charger (9.6 kw / 40a, level 2)94132$1,000
Jun 18, 2026EV chargerOnline electrical permit: category 4a: installation of fire warning and controlled devices of up to…94131not stated
Jun 18, 2026EV chargerInstalling a 60a tesla ev charger94131not stated
Jun 1, 2026Reroof94116$27,500
May 19, 2026Reroof94131$27,900
May 8, 2026Reroof94131$3,641
May 8, 2026Solar, 12.035 kW94121$35,000
Mar 6, 2026SolarSolar permit: mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 15 kwh…94121$20,000
Feb 26, 2026Reroof94122$25,900
Feb 19, 2026Solar, 6.88 kW94131$26,000
Jan 21, 2026SolarSolar permit: ballasted: n, including 1 energy storage unit, of 240 vac, with 10 kwh each in…94121not stated
Dec 15, 2025Panel upgradeReplacing a like-like main service panel with a 125 rating and a 100-amp breaker94127$3,500
Dec 8, 2025Panel upgradeReplace existing 100a main panel with a 200a leviton smart panel94107not stated
Nov 7, 2025Panel upgrade200a main panel upgrade94131$3,600
Sep 19, 2025Reroof94118$17,500
Sep 17, 2025Reroof94121$15,800
Sep 17, 2025Reroof94121$15,600
Sep 17, 2025Panel upgrade94107$1,500
Sep 5, 2025Panel upgradeInstalling a 200a main panel94116$3,500
Aug 27, 2025EV charger· (01) enphase iq 50 ev charger94131$1,500
Aug 25, 2025Reroof94122$16,900
Aug 22, 2025Panel upgrade· (01) nema 14-50 outlet · (01) main service panel · (01) surge protector94132$2,000
Aug 22, 2025EV charger· (01) nema 14-50 outlet · (01) ev charger94131$1,500
Aug 18, 2025Reroof94134$19,990
Aug 18, 2025Reroof94112$14,900
Aug 18, 2025Reroof94131$13,400
Aug 13, 2025Reroof94131$20,250
Aug 13, 2025Panel upgrade94122$3,500
Jun 16, 2025Reroof94116$16,500
May 27, 2025Reroof94121$20,000
May 1, 2025Panel upgrade(01) new main service panel 200a (01) new nema 14-50 outlet94118$3,000
Apr 17, 2025Panel upgrade94122$3,000
Apr 11, 2025Panel upgradeNo details on the permit94109$25,000
Mar 27, 2025Reroof94118$21,000
Mar 27, 2025ReroofRe-roofing with hot works94107$16,000
Feb 18, 2025Reroof94112$4,800
Feb 12, 2025Reroof94132$19,000

What to ask before you hire

About All Bay Solar

  • Ask what the warranty covers and for how long, in writing.

Worth asking any roofing contractor

  • Can you show me proof of liability insurance and your bond?
  • Will you tear off the old roof or lay the new one over it?
  • What do you charge to replace rotted roof boards, per sheet, if you find any?
  • Who pulls the permit, and who meets the inspector?

Get a quote from All Bay Solar

Five quick questions. We pass your request to All Bay Solar.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to All Bay Solar. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More roofing contractors near 94112 and 94131

Also on our Marin County list.

See all 303 roofing contractors in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.