All Phase Electrical

licensed 22 years, mostly panel upgrade work

  • 6 jobs in San Francisco, 2022 to 2026
  • Typical job $5,900
  • All 6 jobs are panel upgrades
  • Licensed since 2004
  • Licensed electrician
  • Carries workers' comp

Jobs by type of work

Most recent jobs

DateWorkZIPStated value
2026-06-16Panel upgraderemove existing service panels with 60 amp main breakers and install new 100 amp main breakers panels94131$9,500
2026-03-25Panel upgradewire - 4th floor addition to an existing 3rd floor unit: two bedrooms, two bathrooms, stackable washer/dryer, minisplit ac unit. install new94114not stated
2026-03-10Panel upgradere-wire electrical for unit 1917 (third floor) include following: bedrooms, bathrooms, kitchen, new wiring for appliences/equipment:upgrade 94109not stated
2023-09-26Panel upgraderewire three bathrooms, re-wire lighting, re-wire kitchen replace existing 125 amp distribution panel with new 125 amp panel to accomodate a94107not stated
2023-06-09Panel upgrade1375/ 1377 dolores street; for both units - replase existing 100 amp main electric service meter panels with new 100amp main meter panels94110$2,300
2022-08-10Panel upgradewire tenant improvement for european wax center with six rooms, lobby area, office and two storage rooms. relocate 200 amp 1 phase sub panel94114not stated

More panel upgrade electricians near 94114

Get quotes from up to 3 licensed panel upgrade electricians

Tell us about the job. We pass your request to up to 3 contractors with an active license who do this work near your ZIP code. They contact you, and you decide.

When do you want to start?

Request sent

Up to 3 licensed contractors will get your request. Expect a call or email from them in the next few days.

Paying for your panel upgrade

Most people use a home equity line, a personal loan or the contractor's own financing. Compare the three.

Circuit breakers in a neatly wired electrical panelSee all 1,087 panel upgrade electriciansRanked by jobs in San Francisco