contractors.fyi
Sign in

Alpha Construction & Solutions Inc.

Panel upgrade electrician based in San Francisco. Licensed since 2019.

  • License active
  • Workers' comp on file

39 jobs on San Francisco permits, 2021 to 2026: 20 panel upgrades, 15 remodels, 2 heat pump installations, 1 seismic retrofit, 1 roofing job. 168th most panel upgrade permits of 1,063 contractors in San Francisco.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1057565, active in the state's records on Sep 23, 2026General building, electrical, plumbingNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2019
Jobs on record39 jobs on San Francisco permits, 2021 to 2026: 20 panel upgrades, 15 remodels, 2 heat pump installations, 1 seismic retrofit, 1 roofing job168th most panel upgrade permits of 1,063 licensed contractors in San Francisco. That counts jobs, not quality.Our San Francisco permit records cover September 2021 to September 2026.

Records: the state license board and City of San Francisco permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1057565 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $3,800 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in San Francisco.

Get 2 or 3 written quotes.

Permit timeline

Across San Francisco, a panel upgrade permit stays open about 77 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. The permit itself is usually issued the same day. How long panel upgrade jobs take.

Track record

7 jobs in the last 12 months, about the same as 7 the year before

Q4 2021: 1 jobQ1 2022: 1 jobQ2 2022: 1 jobQ3 2022: 4 jobsQ4 2022: 1 jobQ1 2023: 2 jobsQ2 2023: 2 jobsQ3 2023: 2 jobsQ4 2023: 5 jobsQ1 2024: 2 jobsQ2 2024: 2 jobsQ3 2024: 2 jobsQ4 2024: 2 jobsQ1 2025: 1 jobQ2 2025: 4 jobsQ4 2025: 3 jobsQ2 2026: 4 jobsBusiest: 5 jobsLatest: 4 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 5 jobs, October to December 2023. Across San Francisco, all contractors together had 21% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 941217 jobs
  • 941126 jobs
  • 941346 jobs
  • 941225 jobs
  • 941104 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jun 12, 2026RemodelIn-kind remodeling of 2 bathroom(s) in 2nd fl, 3rd fl with 1 shower pan(s)94110$15,000
May 1, 2026Remodel527, 3rd fl - remodel (e) kitchen, 1 full bath, & (1) half bath with same layout94121$80,000
May 1, 2026Panel upgradeUnit #527, 3/f: rewire per code, add (1) sub-panel at designated location94121not stated
May 1, 2026Panel upgradeUpgrade 100amp dual electrical main panel to 200amp (100amp/100amp)94121not stated
Nov 4, 2025Panel upgradeUpgrade existing overhead electrical main panel to 200 amp94112$5,000
Oct 17, 2025RemodelRemodeling (e) kitchen (no wall moving) in-kind; add dishwasher94112$50,000
Oct 17, 2025Panel upgradeRemodeling of (e) kitchen, and remodeling of existing bathroom, 2 bedrooms, one living room and…94112$73,000
Jun 9, 2025Heat pumpWork category: 11p; install the electric heat pump split unit system94116not stated
Jun 4, 2025Heat pumpWork category: 11p; install the electric heat pump split unit system and heat pump water heater per…94134not stated
Apr 14, 2025Panel upgradeUpgrade (e) kitchen and bathroom electrical per code94134not stated
Apr 2, 2025Panel upgradeUpgrade existing underground electrical main panel to 400 amp94115$8,000
Mar 31, 2025Panel upgradeUpgrade existing main electrical panel to 200 amp94127$3,800
Oct 24, 2024RemodelRemodel to the main level of the home94116$80,000
Oct 24, 2024Panel upgradeRewire house per plan94116not stated
Aug 23, 2024RemodelNo details on the permit94122$80,000
Aug 23, 2024Panel upgradeUpgrade existing main electrical main panel (200amp), no adding load94122not stated
May 30, 2024RemodelNo details on the permit94121$18,000
Apr 25, 2024Panel upgradeRemodel ground floor unit #1 electrical, adding one subpanel at unit#194110not stated
Mar 25, 2024Panel upgradeUpgrade existing overhead main panel to 200 amp only94131$3,800
Jan 12, 2024Remodel1st/f remodel: add 2 bedrooms, bathroom, kitchenette, entertainment rm94134$50,000
Dec 20, 2023Seismic retrofitGround floor unit #1. remodel in a 3 story residential bldg94110$30,000
Dec 20, 2023RemodelGround floor unit #1. remodel in a 3 story residential bldg94110$30,000
Dec 18, 2023RemodelKitchen and bath remodel; replace 4 windows within existing openings (not visible from the street)94115$50,000
Dec 18, 2023Panel upgradeRemodel kitchen & bathroom94115not stated
Oct 16, 2023Panel upgradeUpdate the existing 100 amp main electrical panel to 200 amp only94124$3,800
Sep 29, 2023RemodelRemodeling (e) bathroom with same layout94121$12,000
Jul 11, 2023Panel upgradeUpgrade existing 100 amp underground main electrical panel to 200 amp94112$15,000
Apr 20, 2023RemodelRemodel 1-kitchen & 1-bathroom with same location at the unit94121$25,000
Apr 20, 2023Panel upgradeAdd one new 60 amp subpanel at the garage94121not stated
Jan 17, 2023RemodelRemodel bath on 2nd fl like for like94112$25,000
Jan 17, 2023Panel upgradeUpgrade (e) electrical with code at second floor only94112not stated
Dec 27, 2022RemodelRemodel kitchen on 2/f94134$15,000
Sep 23, 2022RemodelRemodeling one bathroom at 2nd floor non structural94127$12,000
Sep 14, 2022ReroofNo details on the permit94134$12,000
Aug 23, 2022Panel upgradeEmergency repair of the main panel only94122$3,500
Aug 19, 2022Panel upgradeRewire electrical wiring in the unit, and add one subpanel to the unit94103$18,000
Jun 7, 2022RemodelApt #3: (1) remodeling of existing kitchen cabinets with same layout94122$28,000
Jan 31, 2022Panel upgradeUpgrade existing main panel to 200 amp main panel94134$3,500
Nov 18, 2021Panel upgradeUpgrade existing panel to 200 amp only94122$3,800

What to ask before you hire

About Alpha Construction & Solutions Inc.

  • Ask what the warranty covers and for how long, in writing.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Alpha Construction & Solutions Inc.

Five quick questions. We pass your request to Alpha Construction & Solutions Inc..

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Alpha Construction & Solutions Inc.. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 94121 and 94112

See all 1,063 panel upgrade electricians in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.