Dannels Electric Inc

license 480106, mostly panel upgrade work

  • 13 jobs in San Francisco, 2022 to 2026
  • Typical job $38,750

We could not find an active or renewable license for this business in the state's records today. Check the license with the state before you hire.

Jobs by type of work

Most recent jobs

DateWorkZIPStated value
2026-09-11Panel upgradework on entire building -2 units plus house with service upgrade from 125 to 200 3718 20th/3720 20th -full lutron lighting control system in94110not stated
2026-09-11EV chargerwork on entire building -2 units plus house with service upgrade from 125 to 200 3718 20th/3720 20th -full lutron lighting control system in94110not stated
2026-04-16Panel upgradefull renovation of house. -new 400a class 320 service -2 subpanels with 70 circuits -102 outlets / 106 cans / 43 fixture boxes -lutron light94123not stated
2025-07-24Panel upgradehouse panel swap of the old zinsco subpanel. r & r in exact spot. new subpanel and breakers94114$2,000
2025-07-24Panel upgradehouse panel swap of the old federal pacific subpanel. r & r in exact spot. new subpanel and breakers address of subpanel is in the garage of94114$2,000
2025-07-24Panel upgradeadding sub panel on the 2nd floor with 8 circuits. 18 plugs, 10 dimmers, 15 can lights, 10 decorative fixtures94110not stated
2025-07-14EV chargerrewire of unit 2560 and 2562 vallejo. 197 plugs, 70 cans, 75 circuits.12 smoke detectors car charger and elevator. lutron homeworks lighting94123not stated
2024-09-04Panel upgradewhole house remodel. new 600 amp 3 phase tesco switch gear. 4 sub panels, 225 plugs, 120 mono points, 130 decorative fixtures. 80 circuits.94118not stated
2024-09-04Panel upgradereplace fpe sub panel with new 200amp main breaker sub and new breakers for feeders to existing subs in house. existing service to remain.94118$2,500
2024-07-15Panel upgradenew kitchen lights/plugs. new light locations cut into existing ceiling. 25 cut in cans, 15 fixture boxes 4 fans. re pull thhn into 20 exist94115not stated
2023-09-13Panel upgradecomplete rewire of unit 3. 55 plugs, 72 led cans, 7 decorative fixtures, 200amp subpanel, feeder, 32 circuits, 50amp range, 30amp dryer. lut94133$128,000
2023-03-16Panel upgradeservice upgrade to the building, total 4 units. the old is a total mess done in 1954. will have engineered drawings by electrical engineer. 94133$75,000

More panel upgrade electricians near 94110

Get quotes from up to 3 licensed panel upgrade electricians

Tell us about the job. We pass your request to up to 3 contractors with an active license who do this work near your ZIP code. They contact you, and you decide.

When do you want to start?

Request sent

Up to 3 licensed contractors will get your request. Expect a call or email from them in the next few days.

Paying for your panel upgrade

Most people use a home equity line, a personal loan or the contractor's own financing. Compare the three.

Circuit breakers in a neatly wired electrical panelSee all 1,087 panel upgrade electriciansRanked by jobs in San Francisco