Panel upgrade electrician based in Detroit. Licensed since 2022.

  • License active
  • Workers' comp on file

98 jobs on San Francisco permits, 2023 to 2026: 66 panel upgrades, 30 EV charger installations, 2 solar installations. 44th most panel upgrade permits of 1,063 contractors in San Francisco.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1093949, active in the state's records on Sep 23, 2026General building, electricalNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2022
Jobs on record98 jobs on San Francisco permits, 2023 to 2026: 66 panel upgrades, 30 EV charger installations, 2 solar installationsThey are based in Detroit. Work outside San Francisco is not in these records.44th most panel upgrade permits of 1,063 licensed contractors in San Francisco. That counts jobs, not quality.Our San Francisco permit records cover September 2021 to September 2026.

Records: the state license board and City of San Francisco permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1093949 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $1,999 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in San Francisco.

Get 2 or 3 written quotes.

Permit timeline

Across San Francisco, a panel upgrade permit stays open about 77 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. The permit itself is usually issued the same day. How long panel upgrade jobs take.

Track record

20 jobs in the last 12 months, down from 58 the year before

Q3 2023: 1 jobQ4 2023: 5 jobsQ1 2024: 5 jobsQ2 2024: 2 jobsQ3 2024: 7 jobsQ4 2024: 9 jobsQ1 2025: 14 jobsQ2 2025: 25 jobsQ3 2025: 10 jobsQ4 2025: 13 jobsQ1 2026: 6 jobsQ2 2026: 1 jobBusiest: 25 jobs202420252026
Each bar is 3 months of permits. The tallest is 25 jobs, April to June 2025. Across San Francisco, all contractors together had 21% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 9411014 jobs
  • 9413113 jobs
  • 9411412 jobs
  • 941129 jobs
  • 941189 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jun 16, 2026Solar, 3.5 kWSolar permit: installing 14 solar pv modules, 250 watts per module, total no94122$20,591
Mar 23, 2026Panel upgradeInstall 60a 240v circuit in 100a main panel94112$2,355
Mar 23, 2026EV chargerInstall 60a 240v circuit in 100a main panel94112$2,355
Feb 10, 2026Panel upgradeInstall a 60a 2-pole breaker in the 100a main service panel94110$1,637
Feb 10, 2026EV chargerInstall a 60a 2-pole breaker in the 100a main service panel94110$1,637
Jan 26, 2026Panel upgradeInstall a new 60a ev circuit in the existing exterior 125a meter/main panel to supply the charger94114$1,539
Jan 26, 2026EV chargerInstall a new 60a ev circuit in the existing exterior 125a meter/main panel to supply the charger94114$1,539
Dec 29, 2025SolarSolar permit: ballasted: n, including 1 energy storage unit, of 240 vac, with 13.5 kwh each in…94118$22,450
Dec 22, 2025Panel upgradeInstalling new 100a subpanel94110$1,880
Dec 16, 2025Panel upgradeInstall a 60a 240v circuit in the 125a subpanel.hardwire the chargepoint home flex charger onto the…94112$2,247
Dec 10, 2025Panel upgradeThe proposed wire route is to run wiring from the 200a main panel in the basement, through the…94123$2,298
Oct 23, 2025Panel upgradeNstall iotecha liva charger on interior garage wall using the available, pre-wired 40a 240v circuit…94116$1,547
Oct 23, 2025Panel upgradeInstall a 60a subpanel adjacent to the 100a main panel and relocate multiple 120v circuits into it94132$3,049
Oct 23, 2025Panel upgradeInstall a 30/50 quad breaker in the existing 125a main panel, utilizing the existing 30a 240v dryer…94118$2,166
Oct 23, 2025Panel upgradeNo details on the permit94116$1,984
Oct 23, 2025EV chargerInstall a 30/50 quad breaker in the existing 125a main panel, utilizing the existing 30a 240v dryer…94118$2,166
Oct 16, 2025EV chargerInstall ev charger on left interior garage wall94122$1,547
Oct 15, 2025Panel upgradeInstall new 60a subpanel adjacent to existing 100a main panel94112$2,754
Oct 15, 2025EV chargerInstall new 60a subpanel adjacent to existing 100a main panel94112$2,754
Oct 14, 2025Panel upgradeRemove the existing 50a stove circuit from the 100a bridge panel, as it is no longer needed94131not stated
Sep 8, 2025Panel upgradeInstall (1) 30/50 quad breaker in the 125a main panel, utilizing the existing 30a oven breaker94123$1,771
Sep 8, 2025EV chargerInstall (1) 30/50 quad breaker in the 125a main panel, utilizing the existing 30a oven breaker94123$1,771
Aug 28, 2025Panel upgradeRemove the 30a dryer circuit and install a 20/50 quad with the existing 120v circuits and a new…94127$2,719
Aug 28, 2025EV chargerRemove the 30a dryer circuit and install a 20/50 quad with the existing 120v circuits and a new…94127$2,719
Aug 27, 2025Panel upgradeNo details on the permit94114$1,619
Aug 25, 2025Panel upgradeInstall a 60a 240v circuit in the 200a main panel using an available breaker slot94132$2,362
Aug 25, 2025Panel upgradeInstall a 60a 240v circuit in the 200a main panel using an available breaker slot94121$1,335
Jul 18, 2025Panel upgradeRelocate a few 120v breakers from the 125a main panel to the adjacent 60a subpanel to create space…94127$1,634
Jul 17, 2025Panel upgradeInstall a 60a 240v circuit in the 200a main panel where space is available94114$2,043
Jul 10, 2025Panel upgradeTandem (2) sets of 20a breakers in the 150 subpanel to create space for a 60a 240v circuit94127$2,762
Jun 30, 2025Panel upgradeWe will relocate a few 120v breakers to your existing 50a subpanel to create space and install a…94122$1,449
Jun 25, 2025Panel upgradeWe will tandem a few existing 15a 120v breakers on your 100a main panel to create space and install…94110$1,557
Jun 25, 2025Panel upgradeNo details on the permit94115$9,738
Jun 17, 2025Panel upgradeWe’ll be installing the pulsar plus on the interior garage wall, using the available, pre-wired…94110$2,115
Jun 11, 2025Panel upgradeWe will install (1) 60a, 240v circuit in the main panel94127$1,906
Jun 11, 2025Panel upgradeRemove the existing unused 100a main breaker from the exterior main panel94115$1,850
Jun 11, 2025EV chargerRemove the existing unused 100a main breaker from the exterior main panel94115$1,850
Jun 9, 2025Panel upgradeWe will install (1) 60a sub panel from the existing 70a sub panel in the unit to the left of the…94110$1,589
Jun 3, 2025Panel upgradeWe will install a 50a, 240v circuit in your 70a subpanel94122$3,030
May 20, 2025Panel upgradeWe will install a 60a subpanel adjacent to the main service panel (msp) and transfer multiple 120v…94117$4,281

What to ask before you hire

About Drive Technologies Inc Dba Treehouse

  • Ask what the warranty covers and for how long, in writing.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Drive Technologies Inc Dba Treehouse

Five quick questions. We pass your request to Drive Technologies Inc Dba Treehouse.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Drive Technologies Inc Dba Treehouse. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 94110 and 94131

See all 1,063 panel upgrade electricians in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.