contractors.fyi
Sign in

Electro Integrity

Panel upgrade electrician working in San Francisco. Licensed since 2005.

  • License active
  • Workers' comp on file

260 jobs on San Francisco permits, 2021 to 2026: 196 panel upgrades, 64 EV charger installations. 9th most panel upgrade permits of 1,063 contractors in San Francisco.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 861751, active in the state's records on Sep 23, 2026ElectricalNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2005
Jobs on record260 jobs on San Francisco permits, 2021 to 2026: 196 panel upgrades, 64 EV charger installations9th most panel upgrade permits of 1,063 licensed contractors in San Francisco. That counts jobs, not quality.Our San Francisco permit records cover September 2021 to September 2026.

Records: the state license board and City of San Francisco permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 861751 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $6,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. Over their last 12 months (46 permits) it was $10,000. Kitchen jobs alone: typical permit $13,000 (18 permits). What panel upgrade jobs cost in San Francisco.

Get 2 or 3 written quotes.

Permit timeline

Across San Francisco, a panel upgrade permit stays open about 77 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. The permit itself is usually issued the same day. How long panel upgrade jobs take.

Track record

61 jobs in the last 12 months, about the same as 57 the year before

Q3 2021: 1 jobQ4 2021: 8 jobsQ1 2022: 9 jobsQ2 2022: 13 jobsQ3 2022: 8 jobsQ4 2022: 14 jobsQ1 2023: 12 jobsQ2 2023: 25 jobsQ3 2023: 6 jobsQ4 2023: 18 jobsQ1 2024: 11 jobsQ2 2024: 15 jobsQ3 2024: 2 jobsQ4 2024: 13 jobsQ1 2025: 16 jobsQ2 2025: 12 jobsQ3 2025: 16 jobsQ4 2025: 11 jobsQ1 2026: 19 jobsQ2 2026: 14 jobsQ3 2026: 17 jobsBusiest: 25 jobsLatest: 17 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 25 jobs, April to June 2023. Across San Francisco, all contractors together had 21% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 9411454 jobs
  • 9413136 jobs
  • 9411033 jobs
  • 9412225 jobs
  • 9411720 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Aug 25, 2026Panel upgradeTap existing 200a service equipment per applicable nec requirements94110$2,500
Aug 25, 2026EV chargerTap existing 200a service equipment per applicable nec requirements94110$2,500
Aug 21, 2026EV chargerWire 60a/240v circuit, install ev charger " emporia pro" with pmm94110$2,100
Aug 11, 2026Panel upgradeScope - tap from existing 125a oh panel - run surface-mounted ¾ emt (approximately 40 ft length…94114$2,000
Aug 11, 2026Panel upgrade200a panel replacement with new siemens murray 30/40 panel94122$20,000
Aug 11, 2026EV chargerScope - tap from existing 125a oh panel - run surface-mounted ¾ emt (approximately 40 ft length…94114$2,000
Aug 5, 2026Panel upgradeNo details on the permit94114$10,000
Jul 31, 2026EV chargerTesla ev charger with dynamic control94132$2,500
Jul 30, 2026Panel upgrade00a overhead service upgrade94127$22,500
Jul 30, 2026Panel upgrade200a service upgrade / oh94114$8,500
Jul 28, 2026EV chargerInstall ev charger "emporia pro" with pmm94117$1,900
Jul 28, 2026EV chargerWire and install rivan ev charger94131$1,900
Jul 26, 2026Panel upgrade94114$15,000
Jul 25, 2026Panel upgrade200a service upgrade and whole house rewiring94110$32,000
Jul 23, 2026Panel upgradeTap from existing nm 6/3 cable (run by others) - install 8/16 sub-panel (outdoor listed) directly…94123$4,500
Jul 14, 2026Panel upgradeKnob and tube rewiring: replace fuse panel, install 20/40 slot panel, 80a/240v main, ground per nec94112$11,000
Jul 6, 2026Panel upgradeLiving room: central light, 3 four inch recessed wall washer leds, 4 wall sconces, all on switches94102$13,500
Jun 13, 2026Panel upgradeTap from an existing 100a square d subpanel and install two dedicated circuits using nm and emt…94107$5,000
Jun 7, 2026Panel upgradeHouse rewiring with new 60a/240v sub-panel94116$15,000
Jun 7, 2026Panel upgrade94114$9,000
Jun 4, 2026Panel upgradeInstall an 8-16 subpanel beside the existing panel on a 60a 240v breaker94127$4,250
Jun 4, 2026EV chargerInstall an 8-16 subpanel beside the existing panel on a 60a 240v breaker94127$4,250
May 31, 2026EV chargerReplace existing 2/4 slots 100a disconnect with 4/8 (re-route and re-connect 1 ¼ emt) - run…94117$7,000
May 28, 2026Panel upgradeRun new surface-mounted ¾ conduit from1443 fulton str94117$3,000
May 28, 2026EV chargerRun new surface-mounted ¾ conduit from1443 fulton str94117$3,000
May 12, 2026Panel upgradeApartment rewiring and new 30/48 slots 90a panel94114$20,000
May 2, 2026Panel upgradeNo details on the permit94110$25,000
Apr 29, 2026EV chargerWire and install ev charger "emporia" with pmm (50a/240v circuit)94107$1,500
Apr 16, 2026EV chargerInstall “emporia pro” ev charger (provided by the client) – plug-in94122$1,500
Apr 14, 2026EV chargerRun surface-mounted ¾ emt (approximately 35 ft length feeding conductors #6 thhn) - install…94131$1,300
Apr 12, 2026Panel upgrade200a service upgrade (oh) and house rewiring94112$25,000
Mar 31, 2026Panel upgradeReroute existing circuits, open slots for an additional 2-pole breaker - install a 12/24 slots…94131$4,000
Mar 27, 2026Panel upgradeTap from the existing 100a sub- panel - run surface-mounted ¾ emt (approximately 40 ft length…94114$2,000
Mar 27, 2026Panel upgradeNo details on the permit94114$2,000
Mar 27, 2026EV chargerTap from the existing 100a sub- panel - run surface-mounted ¾ emt (approximately 40 ft length…94114$2,000
Mar 27, 2026EV chargerNo details on the permit94114$2,000
Mar 19, 2026Panel upgradeEntry landing exterior central light and exterior light with 2 pico controls, living room central…94110$10,000
Mar 10, 2026Panel upgrade94122$10,000
Mar 9, 2026Panel upgrade94127$10,000
Feb 21, 2026Panel upgrade94131$12,000

What to ask before you hire

About Electro Integrity

  • Ask what the warranty covers and for how long, in writing.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Electro Integrity

Five quick questions. We pass your request to Electro Integrity.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Electro Integrity. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 94114 and 94131

See all 1,063 panel upgrade electricians in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.