contractors.fyi
Sign in

Golden Bay Electric

Panel upgrade electrician working in San Francisco. Licensed since 2021.

  • License active
  • Workers' comp on file

14 jobs on San Francisco permits, 2023 to 2026: 13 panel upgrades, 1 EV charger installation. 271st most panel upgrade permits of 1,063 contractors in San Francisco.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1083447, active in the state's records on Sep 23, 2026ElectricalNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2021
Jobs on record14 jobs on San Francisco permits, 2023 to 2026: 13 panel upgrades, 1 EV charger installation271st most panel upgrade permits of 1,063 licensed contractors in San Francisco. That counts jobs, not quality.Our San Francisco permit records cover September 2021 to September 2026.

Records: the state license board and City of San Francisco permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1083447 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $4,500 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in San Francisco.

Get 2 or 3 written quotes.

Permit timeline

Across San Francisco, a panel upgrade permit stays open about 77 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. The permit itself is usually issued the same day. How long panel upgrade jobs take.

Track record

2 jobs in the last 12 months, down from 5 the year before

Q1 2023: 2 jobsQ1 2024: 2 jobsQ2 2024: 3 jobsQ4 2024: 1 jobQ2 2025: 1 jobQ3 2025: 3 jobsQ3 2026: 2 jobsBusiest: 3 jobsLatest: 2 jobs2023202420252026
Each bar is 3 months of permits. The tallest is 3 jobs, April to June 2024. Across San Francisco, all contractors together had 21% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 941175 jobs
  • 941144 jobs
  • 941161 job
  • 941101 job
  • 941311 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Aug 17, 2026Panel upgradeReplace existing sub panel with new sub panel94114not stated
Aug 17, 2026Panel upgradeReplacement of existing sub panel with new94114not stated
Sep 15, 2025Panel upgradeUnit 204: correct wiring from main panel to sub panel94117$1,500
Sep 12, 2025Panel upgradeRe-wire existing knob and tube locations with new romex ul listed wire, install new 100-amp…94114$25,000
Jul 9, 2025Panel upgradeRemove existing 100a sub panel94116$6,500
Jun 10, 2025Panel upgradeInstallation of new wiring to accommodate new receptacle and lighting locations94110not stated
Dec 13, 2024Panel upgradeBasement remodel94114not stated
May 29, 2024Panel upgradeInstall new wiring through the building per drawings to accommodate receptacles and lighting94117$30,000
May 29, 2024EV chargerInstall new wiring through the building per drawings to accommodate receptacles and lighting94117$30,000
Apr 30, 2024Panel upgradeReplace an existing 100a service panel with a new 200a service panel94131$4,500
Mar 13, 2024Panel upgradeReplace 3 zinsco sub panels w/ 3 new ul listed sub panels94117$4,500
Mar 13, 2024Panel upgradeReplace 2 zinsco sub panels w/ 2 new ul listed sub panels94117$2,850
Mar 30, 2023Panel upgrade#101: install new dedicated circuits, fridge, micro, hood, range, all fed from existing subpanel94109$3,500
Mar 2, 2023Panel upgradeInstall new 50/60a sub panel, approx within 10ft from main meter panel, install 3 new designated…94122$3,500

What to ask before you hire

About Golden Bay Electric

  • Ask what the warranty covers and for how long, in writing.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Golden Bay Electric

Five quick questions. We pass your request to Golden Bay Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Golden Bay Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 94117 and 94114

See all 1,063 panel upgrade electricians in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.