contractors.fyi
Sign in

Kwong Associates

Panel upgrade electrician based in San Francisco. Licensed since 2008.

  • License active
  • Workers' comp on file

37 jobs on San Francisco permits, 2021 to 2026: 19 panel upgrades, 16 remodels, 1 heat pump installation, 1 roofing job. 186th most panel upgrade permits of 1,063 contractors in San Francisco.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 913553, active in the state's records on Sep 23, 2026General building, electrical, plumbingNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2008
Jobs on record37 jobs on San Francisco permits, 2021 to 2026: 19 panel upgrades, 16 remodels, 1 heat pump installation, 1 roofing job186th most panel upgrade permits of 1,063 licensed contractors in San Francisco. That counts jobs, not quality.Our San Francisco permit records cover September 2021 to September 2026.

Records: the state license board and City of San Francisco permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 913553 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $11,500 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in San Francisco.

Get 2 or 3 written quotes.

Permit timeline

Across San Francisco, a panel upgrade permit stays open about 77 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. The permit itself is usually issued the same day. How long panel upgrade jobs take.

Track record

6 jobs in the last 12 months, down from 13 the year before

Q3 2021: 1 jobQ4 2021: 2 jobsQ1 2022: 1 jobQ2 2022: 4 jobsQ4 2022: 2 jobsQ3 2023: 2 jobsQ1 2024: 4 jobsQ2 2024: 2 jobsQ4 2024: 1 jobQ1 2025: 3 jobsQ2 2025: 4 jobsQ3 2025: 5 jobsQ4 2025: 4 jobsQ1 2026: 2 jobsBusiest: 5 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 5 jobs, July to September 2025. Across San Francisco, all contractors together had 21% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 941228 jobs
  • 941166 jobs
  • 941104 jobs
  • 941154 jobs
  • 941184 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Mar 10, 2026Panel upgradeRewire electrical for upper (2nd) floor only, add sub-panel94122not stated
Jan 29, 2026RemodelIn-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd…94116$68,000
Oct 24, 2025RemodelIn-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s)94122$11,000
Oct 21, 2025RemodelWork on 1117 kirkham only: remodel kitchen and 2nd floor bathroom94122$110,000
Oct 21, 2025Panel upgradeRewire 1117 kirkham only throughout94122not stated
Oct 10, 2025Panel upgradeUpgrade main panel to 200amp service94122$8,000
Sep 4, 2025RemodelReduce scope of work for permit # 202506158727: in kind remodel ktichen (no bathroom work)94132not stated
Jul 21, 2025Panel upgradeInstall new apartment unit meter main panels and one house by-pass meter main panel per insurance…94117$25,000
Jul 8, 2025RemodelRemodel home, rewire entire home, new plumbing94110$250,000
Jul 8, 2025Panel upgradeReplace main panel to 125amps94110not stated
Jul 8, 2025Heat pumpInstall mini split hvac system in habitable rooms94110not stated
Jun 15, 2025Remodel94132$28,000
Jun 6, 2025Remodel2/f: remodel (e) kitchen and remodel (e) bath and closet to fill bath and toilet room94122$9,700
May 16, 2025Panel upgradeRenew green tag for pg&e service upgrade94115not stated
Apr 30, 2025Panel upgradeUpgrade electrical service to 200 amp94116not stated
Mar 5, 2025Remodel94110$95,000
Mar 4, 2025RemodelIn-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with…94118$23,000
Feb 3, 2025Remodel94116$22,000
Dec 19, 2024RemodelIn-kind remodeling of 1 kitchen(s) in 1st fl94122$38,000
Jun 13, 2024Panel upgradeRef ew202202251679- kitchen and 2x bathroom remodel and upgrade main panel to 125amps94102not stated
Apr 5, 2024ReroofNo details on the permit94116$20,000
Mar 11, 2024RemodelRemodel 2nd floor residential apartment94118$60,000
Mar 11, 2024Panel upgradeRewire apartment94118not stated
Feb 14, 2024Panel upgradeRemove and replace (e) federal pacific (fp) 400amp main breaker assembly with a new 400amp main…94122$25,000
Jan 23, 2024Panel upgradeRemove and replace (e) federal pacific (fp) 400amp main breaker assembly with a seimens 400amp main…94118$8,000
Sep 6, 2023RemodelRemodel kitchen and bathroom94133$30,000
Aug 3, 2023Panel upgradeReplace main panel in garage94133$15,000
Oct 19, 2022Panel upgradeRemodel 2nd floor94115not stated
Oct 19, 2022Panel upgradeRemodel apartment94115not stated
May 24, 2022Panel upgradeKitchen remodel, add (n) sub-panel for new circuits94116not stated
Apr 28, 2022Remodel1st fl: interior remodel, kitchen and bath remodel94115$200,000
Apr 28, 2022Panel upgradeRewire kitchen94117$2,000
Apr 9, 2022Panel upgradeSfr dwelling: upgrade electrical system94121$20,000
Feb 25, 2022Panel upgradeRemodel kitchen and (e) bathroom94102not stated
Dec 10, 2021RemodelRemodel kitchen and bathroom on 2nd floor94116$75,000
Oct 4, 2021Panel upgradeRewire bedroom, add arc fault circuit breaker to panel94121$1,000
Sep 27, 2021RemodelRepair fire damage exterior siding in kind94103$125,000

What to ask before you hire

About Kwong Associates

  • Ask what the warranty covers and for how long, in writing.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Kwong Associates

Five quick questions. We pass your request to Kwong Associates.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Kwong Associates. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 94122 and 94116

See all 1,063 panel upgrade electricians in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.