contractors.fyi
Sign in

Precision Air Systems Inc

Panel upgrade electrician based in San Leandro. Licensed since 2003.

  • License active
  • Workers' comp on file

11 jobs on San Francisco permits, 2021 to 2026: 6 panel upgrades, 4 heat pump installations, 1 remodel. 589th most panel upgrade permits of 1,063 contractors in San Francisco.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 817255, active in the state's records on Sep 23, 2026General building, boilers, electrical, heating and airNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2003
Jobs on record11 jobs on San Francisco permits, 2021 to 2026: 6 panel upgrades, 4 heat pump installations, 1 remodelThey are based in San Leandro. Work outside San Francisco is not in these records.589th most panel upgrade permits of 1,063 licensed contractors in San Francisco. That counts jobs, not quality.Our San Francisco permit records cover September 2021 to September 2026.

Records: the state license board and City of San Francisco permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 817255 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $7,500 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in San Francisco.

Get 2 or 3 written quotes.

Permit timeline

Across San Francisco, a panel upgrade permit stays open about 77 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. The permit itself is usually issued the same day. How long panel upgrade jobs take.

Track record

6 jobs in the last 12 months, up from 0 the year before

Q4 2021: 1 jobQ3 2022: 1 jobQ2 2023: 1 jobQ4 2023: 1 jobQ1 2024: 1 jobQ1 2026: 3 jobsQ3 2026: 3 jobsBusiest: 3 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 3 jobs, January to March 2026. Across San Francisco, all contractors together had 21% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 941153 jobs
  • 941233 jobs
  • 941183 jobs
  • 941141 job
  • 941171 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Aug 25, 2026RemodelIn kind bath remodel, new cabinet, new tile, new shower glass94115$15,000
Aug 25, 2026Panel upgradeInstall fixtures, move panel, install new 200a panel94115$14,500
Aug 25, 2026Heat pumpWork category: 1m; installation of heat pump and air handler94115$44,500
Mar 11, 2026Panel upgradeSupply and isntall additional circuit, run conduit from existing main panel to subpanel inside of…94123$5,000
Mar 11, 2026Panel upgradeSupply and install additional circuit, run conduit from existing main panel to subpanel inside of…94123$5,000
Feb 12, 2026Panel upgradeSupply and install additional circuits for (3) units, run conduit from existing main panel to…94123$30,000
Jan 23, 2024Heat pumpWork category: 1m; installation of heat pumps and mini split system94114$35,500
Nov 2, 2023Heat pumpWork category: 1m; installation of roof top heat pump unit with duct system94118not stated
May 16, 2023Heat pumpWork category: 1m; new return air system, change out heating system with new heat pump and air…94118$45,000
Aug 31, 2022Panel upgradeSupply and install recessed light fixtures, panel relocation with pge, receptacles and updated…94118$10,000
Oct 18, 2021Panel upgradeReplace subpanel94117$2,000

What to ask before you hire

About Precision Air Systems Inc

  • Ask what the warranty covers and for how long, in writing.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Precision Air Systems Inc

Five quick questions. We pass your request to Precision Air Systems Inc.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Precision Air Systems Inc. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 94115 and 94123

See all 1,063 panel upgrade electricians in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.