contractors.fyi
Sign in

Skytech Construction Inc

Panel upgrade electrician based in San Francisco. Licensed since 2020.

  • License active
  • Workers' comp on file

16 jobs on San Francisco permits, 2021 to 2026: 9 panel upgrades, 4 remodels, 2 ADUs, 1 seismic retrofit. 420th most panel upgrade permits of 1,063 contractors in San Francisco.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1062339, active in the state's records on Sep 23, 2026General building, electrical, plumbingNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2020
Jobs on record16 jobs on San Francisco permits, 2021 to 2026: 9 panel upgrades, 4 remodels, 2 ADUs, 1 seismic retrofit420th most panel upgrade permits of 1,063 licensed contractors in San Francisco. That counts jobs, not quality.Our San Francisco permit records cover September 2021 to September 2026.

Records: the state license board and City of San Francisco permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1062339 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $1,500 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in San Francisco.

Get 2 or 3 written quotes.

Permit timeline

Across San Francisco, a panel upgrade permit stays open about 77 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. The permit itself is usually issued the same day. How long panel upgrade jobs take.

Track record

2 jobs in the last 12 months, down from 5 the year before

Q4 2021: 3 jobsQ1 2022: 1 jobQ2 2022: 1 jobQ3 2022: 1 jobQ4 2022: 1 jobQ3 2023: 2 jobsQ2 2025: 5 jobsQ1 2026: 1 jobQ3 2026: 1 jobBusiest: 5 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 5 jobs, April to June 2025. Across San Francisco, all contractors together had 21% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 941215 jobs
  • 941124 jobs
  • 941072 jobs
  • 941342 jobs
  • 941331 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Aug 7, 2026RemodelUnit 881a: bathroom remodel, replace vanity94133$15,000
Jan 14, 2026RemodelUnit 532: remodel two bathrooms, 1 tub to shower conversion94115$35,000
Jun 26, 2025Panel upgrade (×4, same day)94121$1,500 each
Apr 16, 2025Panel upgradeUpgrade service to 250amp, replace switch gear or hot gutter with 5 meters; replace 5 electrical…94121$15,000
Sep 5, 2023ADUResponse to bid nov#202310120 dated 7/5/2023, adu water damage repaired in-kind94107$70,000
Jul 26, 2023RemodelConstruct 2 bedroom, media room, bathroom, & wet bar at g/f94118$520,000
Oct 6, 2022Panel upgradeInstall new 400a subpanel; connect two hvac units94107not stated
Jul 28, 2022ADUNo details on the permit94134$50,000
May 6, 2022Panel upgradeService upgrade from 100a to 200a94134$3,000
Jan 12, 2022Panel upgradeLegalize the unit on third floor and upgrade 200 am service and sub panel94112not stated
Dec 20, 2021RemodelConstruct 1 bedroom, 2 full bathroom & upgrade (e) family room at ground floor94112$86,000
Dec 20, 2021Panel upgradeConstruct 1 bedroom, 2 full bathroom & upgrade (e) family room at ground floor94112not stated
Nov 8, 2021Seismic retrofitVoluntary soft story retrofit for 1st fl per appendix chap 4 of 2012 iebc (75%). foundation,…94112$45,000

What to ask before you hire

About Skytech Construction Inc

  • Ask what the warranty covers and for how long, in writing.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Skytech Construction Inc

Five quick questions. We pass your request to Skytech Construction Inc.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Skytech Construction Inc. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 94121 and 94112

See all 1,063 panel upgrade electricians in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.