contractors.fyi
Sign in

Sunset Builders Llc.

Panel upgrade electrician based in San Francisco. Licensed since 2018.

  • License active

21 jobs on San Francisco permits, 2021 to 2025: 10 panel upgrades, 9 remodels, 1 heat pump installation, 1 ADU. 379th most panel upgrade permits of 1,063 contractors in San Francisco.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1039289, active in the state's records on Sep 23, 2026General buildingNo complaints or citations on the board's public record.Checks out
In business?Licensed since 2018
Jobs on record21 jobs on San Francisco permits, 2021 to 2025: 10 panel upgrades, 9 remodels, 1 heat pump installation, 1 ADU379th most panel upgrade permits of 1,063 licensed contractors in San Francisco. That counts jobs, not quality.Our San Francisco permit records cover September 2021 to September 2026.

Records: the state license board and City of San Francisco permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1039289 on CSLB

Cost and timing

Permit timeline

Across San Francisco, a panel upgrade permit stays open about 77 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. The permit itself is usually issued the same day. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q4 2021: 3 jobsQ2 2022: 1 jobQ3 2022: 1 jobQ2 2023: 3 jobsQ3 2023: 2 jobsQ4 2023: 2 jobsQ2 2024: 2 jobsQ3 2024: 2 jobsQ2 2025: 1 jobQ3 2025: 1 jobQ4 2025: 3 jobsBusiest: 3 jobsBusiest: 3 jobs2022202320242025
Each bar is 3 months of permits. The tallest is 3 jobs, October to December 2021.

Where they work most

  • 941225 jobs
  • 941274 jobs
  • 941184 jobs
  • 941163 jobs
  • 941122 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Nov 21, 2025Panel upgradeRewire remodel area, install new subpanel, upgrade 200 amp main panel94122not stated
Nov 5, 2025Heat pumpNew heat pump heating system94121not stated
Oct 15, 2025RemodelInterior remodel: 1st flr restore original garage,relocate stair to 2nd flr94122$300,000
Aug 21, 2025ADUTo comply with nov 202428924: on 1/f: per ca govt code 65852.2: turn unpermitted dwelling unit into…94116$35,000
Jun 24, 2025RemodelWork only in unit 3545 judah at 2nd fl94122$20,000
Aug 20, 2024Panel upgradeRewire remodel area and install new subpanel94127not stated
Aug 5, 2024Panel upgradeInstall new ufer ground, rewire remodel area, install new subpanel, upgrade 200m main panel94118not stated
May 15, 2024RemodelKitchen remodel-appliances to stay94133$25,000
Apr 30, 2024RemodelRemodel kitchen & 3.5 baths, new windows & doors, move laundry to 3/f, modify (e) closets, replace…94118$250,000
Oct 17, 2023RemodelInterior remodel: 1st flr- add a bedroom, a family room, a media room, and a bathroom; 2nd flr-…94116$120,000
Oct 17, 2023Panel upgradeNew lights, switches, outlets on g/f94116not stated
Jul 5, 2023RemodelReplace existing kitchen cabinets, relocate electrical subpanel and new kitchen sink in existing…94118$10,000
Jul 5, 2023Panel upgradeUnit# 302: relocate electrical94118not stated
Jun 8, 2023RemodelKitchen and 1 bathroom (1 shower) remodel in kind94122$14,500
Jun 8, 2023Panel upgradeNew wiring for kitchen and bathroom94122not stated
Apr 3, 2023Remodel, 1436 sq ftRemodel kitchen94127$275,000
Aug 23, 2022Panel upgradeInstall ufer ground94112not stated
Jun 23, 2022Panel upgradeNew wire for 2 bedrooms , playroom and laundry on 1st floor94127not stated
Dec 29, 2021Panel upgradeRewire entire house, install new sub-panel & change main panel as needed94127not stated
Nov 23, 2021Panel upgradeRe-wire (1) bathroom, (1) bedroom & closet on 1st fl94124not stated
Nov 5, 2021RemodelRemodel kitchen & bathroom, add new bath at upper/main level94112$450,000

What to ask before you hire

About Sunset Builders Llc.

  • Ask what the warranty covers and for how long, in writing.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Sunset Builders Llc.

Five quick questions. We pass your request to Sunset Builders Llc..

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Sunset Builders Llc.. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 94122 and 94127

See all 1,063 panel upgrade electricians in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.