contractors.fyi
Sign in

Sutro Power

Panel upgrade electrician based in San Francisco. Licensed since 2020.

  • License active
  • Workers' comp on file

55 jobs on San Francisco permits, 2021 to 2026: 30 panel upgrades, 15 solar installations, 10 EV charger installations.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1066207, active in the state's records on Sep 23, 2026General building, electricalNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2020
Jobs on record55 jobs on San Francisco permits, 2021 to 2026: 30 panel upgrades, 15 solar installations, 10 EV charger installationsOur San Francisco permit records cover September 2021 to September 2026.

Records: the state license board and City of San Francisco permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1066207 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $1,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in San Francisco.

Get 2 or 3 written quotes.

Permit timeline

Across San Francisco, a panel upgrade permit stays open about 77 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. The permit itself is usually issued the same day. How long panel upgrade jobs take.

Track record

25 jobs in the last 12 months, up from 9 the year before

Q4 2021: 2 jobsQ1 2022: 4 jobsQ3 2022: 1 jobQ4 2022: 1 jobQ1 2023: 2 jobsQ2 2023: 1 jobQ3 2023: 1 jobQ4 2023: 4 jobsQ1 2024: 3 jobsQ2 2024: 1 jobQ3 2024: 1 jobQ4 2024: 1 jobQ1 2025: 4 jobsQ2 2025: 2 jobsQ3 2025: 2 jobsQ4 2025: 8 jobsQ2 2026: 13 jobsQ3 2026: 4 jobsBusiest: 13 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 13 jobs, April to June 2026. Across San Francisco, all contractors together had 21% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 9412718 jobs
  • 941127 jobs
  • 941146 jobs
  • 941175 jobs
  • 941214 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Aug 21, 2026Panel upgradeLike-for-like main panel swap94127$10,000
Aug 12, 2026EV chargerInstall of a dc ev chargers94122$1,500
Jul 24, 2026Panel upgrade200a main service panel upgrade94127$1,000
Jul 22, 2026Solar, 6.6 kW94121not stated
Jun 24, 2026Panel upgrade200a main service panel like-for-like swap94114$1,000
Jun 22, 2026Solar, 14.08 kW94131$52,465
Jun 11, 2026EV chargerEv charger installation94110$2,200
Jun 5, 2026EV chargerAdd level 2 ev charger - 50a/240v94117$1,850
Jun 2, 2026EV chargerEv charger install94127$1,000
May 28, 2026SolarInstallation of the following equipment: (16) seg-440-btd-bg 440w pv module, (6) ap smart rsd-d-20,…94131not stated
May 27, 2026Solar, 2.2 kW94127$1,000
May 18, 2026Solar, 9.68 kW94112$30,000
May 11, 2026SolarSolar permit: ballasted: n, including 1 energy storage unit, of 240 vac, with 18.08 kwh each in…94116$10,000
Apr 28, 2026Solar, 13.2 kW94127not stated
Apr 24, 2026Solar, 5.28 kW94131$20,000
Apr 14, 2026Panel upgrade200 amp service upgrade94122$1,000
Apr 6, 2026EV chargerSig energy bi-directional ev charger94107$1,000
Dec 29, 2025Solar, 11.4 kWInstallation of: (20) hyundai his-s410yh(bk) pv modules, (1) pointguard 11.4kw pg controller…94117$49,824
Dec 3, 2025Panel upgradeEw20121015981 “install new 200 amp meter/main service panel with 40 circuit sub-panel in basement…94127$1,000
Nov 21, 2025Solar, 2.46 kW94115$10,000
Nov 21, 2025Solar, 6.09 kW94127$38,440
Nov 7, 2025EV chargerDc ev charger94127$1,000
Oct 27, 2025Panel upgradeNo details on the permit94132$8,000
Oct 17, 2025EV chargerInstalling a span drive ev charger94131$1,000
Oct 10, 2025Panel upgradeLike-for-like panel swap94127$1,000
Sep 11, 2025Solar, 8.7 kW94121not stated
Aug 1, 2025Panel upgradeMain service panel upgrade to 200a94122$1,000
May 28, 2025Panel upgrade(n) main service panel is with 200a bus /200a breaker94114$1,000
Apr 30, 2025Panel upgradeMeter/main panel upgrade from 125a to 200a94114$1,000
Mar 17, 2025Panel upgradeMain servicer panel upgrade to 200a94112$1,000
Jan 29, 2025Panel upgradeChang main panel to 200a service94112$1,000
Jan 23, 2025Panel upgradeChange main panel to 200a service94112$1,000
Jan 13, 2025Panel upgradePanel replacement; disconnect reconnect94121$1,000
Nov 22, 2024Panel upgrade200a main service panel upgrade94134$1,000
Sep 5, 2024EV chargerNew 200a overhead service, 200a garage load center, (2) 120v garage outlets, ev 240v outlet in…94127$1,000
May 30, 2024Panel upgradeInstallation of (2) enphase iq battery 5p, (1) enphase system controller, and (1) span panel94114$1,000
Mar 15, 2024Panel upgradeService change from 100a to 200a panel94114$1,000
Feb 29, 2024Panel upgradePanel swap to 225a94112$1,000
Feb 2, 2024SolarSolar - rooftop solar, (36) 480w pv modules with optimizers94117$5,800
Nov 10, 2023Panel upgradeService change 125a to 200a94127$1,000

What to ask before you hire

About Sutro Power

  • Ask what the warranty covers and for how long, in writing.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Sutro Power

Five quick questions. We pass your request to Sutro Power.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Sutro Power. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 94127 and 94112

See all 1,063 panel upgrade electricians in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.