contractors.fyi
Sign in

Tailwind Construction Inc

Panel upgrade electrician based in San Francisco. Licensed since 2023.

  • License active
  • Workers' comp on file

12 jobs on San Francisco permits, 2023 to 2026: 8 panel upgrades, 3 remodels, 1 heat pump installation. 466th most panel upgrade permits of 1,063 contractors in San Francisco.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1106072, active in the state's records on Sep 23, 2026General building, electrical, plumbingNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2023
Jobs on record12 jobs on San Francisco permits, 2023 to 2026: 8 panel upgrades, 3 remodels, 1 heat pump installation466th most panel upgrade permits of 1,063 licensed contractors in San Francisco. That counts jobs, not quality.Our San Francisco permit records cover September 2021 to September 2026.

Records: the state license board and City of San Francisco permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1106072 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $5,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in San Francisco.

Get 2 or 3 written quotes.

Permit timeline

Across San Francisco, a panel upgrade permit stays open about 77 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. The permit itself is usually issued the same day. How long panel upgrade jobs take.

Track record

4 jobs in the last 12 months, about the same as 4 the year before

Q3 2023: 1 jobQ3 2024: 3 jobsQ1 2025: 1 jobQ2 2025: 2 jobsQ3 2025: 1 jobQ1 2026: 1 jobQ2 2026: 1 jobQ3 2026: 2 jobsBusiest: 3 jobsLatest: 2 jobs202420252026
Each bar is 3 months of permits. The tallest is 3 jobs, July to September 2024. Across San Francisco, all contractors together had 21% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 941023 jobs
  • 941182 jobs
  • 941122 jobs
  • 941222 jobs
  • 941321 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Aug 24, 2026RemodelRemodel (e) living room, bedrm, bathroom at 2/f (1029 anza). remodel (e) kitchen, living room,…94118$120,000
Aug 24, 2026Panel upgradeReplace knob and tube wiring withing the house except 2nd floor kitchen94132$5,000
May 21, 2026Panel upgradeRewire whole house electrical, install outlets, switches, lights, like for like replace electrical…94116not stated
Mar 18, 2026Panel upgradeRewiring 2nd floor and install one sub-panel, upgrade (e) electrical service to 200a, no of lights…94112$5,000
Aug 15, 2025Remodel(e) 2nd floor kitchen remodel94121$15,000
Apr 29, 2025Panel upgradeRevision to e202409166904 (new all gender restroom with new fan, light, outlets and switches.) -…94122not stated
Apr 29, 2025Heat pumpRequest gas tag94122not stated
Jan 27, 2025Panel upgradeRewiring 2nd floor for kitchen, bathrooms, bedrooms, and hallway94112not stated
Aug 27, 2024Panel upgrade (×2, same day)Renovation of unit with lights, outlets, washer/ dryer94102not stated
Aug 27, 2024Panel upgradeElectrical work for in garag adu94102not stated
Sep 21, 2023RemodelOne kitchen remodel non structural no electrical and plumbing94118$15,000

What to ask before you hire

About Tailwind Construction Inc

  • Ask what the warranty covers and for how long, in writing.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Tailwind Construction Inc

Five quick questions. We pass your request to Tailwind Construction Inc.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Tailwind Construction Inc. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 94102 and 94118

See all 1,063 panel upgrade electricians in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.